Altoona Transportation Center

Altoona Transportation Center

Altoona Transportation Center

Railroad and bus station in Altoona, Pennsylvania, US


The Altoona Transportation Center is an intermodal passenger facility in downtown Altoona, Pennsylvania. It is served by the daily Amtrak Pennsylvanian, Greyhound Lines intercity buses, and AMTRAN local bus service (for which is serves as the hub). The station was built in 1986, replacing a temporary station, which had in turn replaced the 1887-built Pennsylvania Railroad station in 1972.

Quick Facts General information, Location ...

History

A westbound Pennsylvanian stops at the temporary station, June 1981.

The Altoona Transportation Center stands on the site of the old Altoona station, which was constructed in 1887 immediately to the West of the Logan House Hotel.[3] When Amtrak took over intercity passenger service in May 1971, it retained two daily round trips serving Altoona – the Duquesne and the combined Broadway Limited/Spirit of St. Louis.[4] The Spirit of St. Louis was renamed National Limited on July 12, 1971, and began operating separately from the Broadway Limited between Pittsburgh and Harrisburgh.[5]:18 The Duquesne was renamed Keystone on November 14, 1971, and discontinued on April 30, 1972. To replace it, the National Limited was rescheduled to no longer cross Pennsylvania late at night.[6]:91

Amtrak and Penn Central vacated the old station effective November 6, 1972; it was demolished to make room for a parking garage. Although Penn Central originally planned a $400,000 replacement station, a 12-by-60-foot (3.7 m × 18.3 m) trailer instead served as a ticket office and waiting room.[7][8] The National Limited was discontinued on October 1, 1979.[5]:62 It was replaced by the Pennsylvanian on April 27, 1980.[5]:75 From April 26, 1981, to January 30, 1983, the Fort Pitt provided an additional Altoona–Pittsburgh service.[6]:91

Planning of an improved transportation center was a controversial topic in the Altoona area. Candidates for city positions structured their campaigns around the expense of, feasibility of, and location of the pending transit hub.[9][10] Projected costs ranged anywhere from 10 million dollars to 3 million dollars. On August 12, 1982, the Altoona Area Chamber of Commerce voted unanimously in favor of a new Transportation Center.[11] By October of the same year Harry Weese and Associates, an architectural firm from Washington D.C., had been chosen to conduct a series of surveys in order to determine the optimal location for the proposed structure.[12] Ultimately, urban renewal parcels 14A, 14B, 16A, and 16B were chosen, and the Transportation Center was merged into an existing Altoona Parking Authority project, creating the hybrid parking garage/transit facility that exists today.[13] The facility opened on October 23, 1986 after being completed for $3.2 million,[14] an estimated $500,000 under budget.[13][12] The cost of construction was completely covered by a federal grant.[13]

In 1995, the Broadway Limited was replaced by the Three Rivers. The Pennsylvanian was discontinued in November 2004, leaving Altoona with only a single daily round trip. The Pennsylvanian resumed on March 7, 2005, when the Three Rivers was discontinued.[6]:94 In March 2020, the Pennsylvanian was suspended as part of a system-wide service reduction in response to the growing COVID-19 pandemic.[15] Service resumed on June 1, 2020.[16]


References

  1. "AMTRAN Regular Routes". AMTRAN. July 10, 2020. Retrieved 10 July 2020.
  2. "Blair County Pennsylvania Railroad Stations". www.west2k.com. Retrieved 2020-07-11.
  3. "System Puts City On Amtrak". The Pittsburgh Press. May 2, 1971. p. 11 via Newspapers.com.
  4. Sanders, Craig (2006). Amtrak in the Heartland. Bloomington, Indiana: Indiana University Press. ISBN 978-0-253-34705-3.
  5. Warner, David C.; Goldberg, Bruce (2021). Fifty Years of Amtrak Trains: A Comprehensive Survey of Amtrak Routes: 1971–2021. Bucklin, Missouri: White River Productions. ISBN 978-1-932804-70-6.
  6. "News From Around Here". Tyrone Daily Herald. June 9, 1972. p. 1 via Newspapers.com.
  7. "News From Around Here". Tyrone Daily Herald. November 6, 1972. p. 1 via Newspapers.com.
  8. "David N. Korns for Controller". The Altoona Mirror. 29 October 1981.
  9. "Chamber Vows to Support Center". The Altoona Mirror. 14 August 1982. Retrieved 11 July 2020.
  10. Stevens, Kay (9 October 1982). "Firm Resumes Work on City Transit Center". The Altoona Mirror. Retrieved 11 July 2020.
  11. Mulhollem, Jeff (22 October 1986). "Improved lots open tomorrow". The Altoona Mirror. Retrieved 11 July 2020.
  12. "Teamwork, byword of Intown development". The Altoona Mirror. 6 March 1988. Retrieved 11 July 2020.

Share this article:

This article uses material from the Wikipedia article Altoona Transportation Center, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.