Ariane_5

Ariane 5

Ariane 5

European heavy-lift space launch vehicle (1996–2023)


Ariane 5 is a retired European heavy-lift space launch vehicle developed and operated by Arianespace for the European Space Agency (ESA). It was launched from the Centre Spatial Guyanais (CSG) in French Guiana. It was used to deliver payloads into geostationary transfer orbit (GTO), low Earth orbit (LEO) or further into space. The launch vehicle had a streak of 82 consecutive successful launches between 9 April 2003 and 12 December 2017. Since 2014,[4] Ariane 6, a direct successor system, is in development.[5]

Quick Facts Function, Manufacturer ...

The system was designed as an expendable launch system by the Centre national d'études spatiales (CNES), the French government's space agency, in cooperation with various European partners. Despite not being a direct derivative of its predecessor launch vehicle program, it was classified as part of the Ariane rocket family. ArianeGroup was the prime contractor for the manufacturing of the vehicles, leading a multi-country consortium of other European contractors. Ariane 5 was originally intended to launch the Hermes spacecraft, and thus it was rated for human space launches.

Since its first launch, Ariane 5 was refined in successive versions: "G", "G+", "GS", "ECA", and finally, "ES". The system had a commonly used dual-launch capability, where up to two large geostationary belt communication satellites can be mounted using a SYLDA (Système de Lancement Double Ariane, meaning "Ariane Double-Launch System") carrier system. Up to three, somewhat smaller, main satellites are possible depending on size using a SPELTRA (Structure Porteuse Externe Lancement Triple Ariane, which translates to "Ariane Triple-Launch External Carrier Structure"). Up to eight secondary payloads, usually small experiment packages or minisatellites, could be carried with an ASAP (Ariane Structure for Auxiliary Payloads) platform.

Following the launch of 15 August 2020, Arianespace signed the contracts for the last eight Ariane 5 launches, before it was succeeded by the new Ariane 6 launcher, according to Daniel Neuenschwander, director of space transportation at the ESA.[6][5] Ariane 5 flew its final mission on 5 July 2023.[7]

Vehicle description

Cryogenic main stage

Vulcain engine

Ariane 5's cryogenic H173 main stage (H158 for Ariane 5G, G+, and GS) was called the EPC (Étage Principal Cryotechnique — Cryotechnic Main Stage). It consisted of a 5.4 m (18 ft) diameter by 30.5 m (100 ft) high tank with two compartments, one for liquid oxygen and one for liquid hydrogen, and a Vulcain 2 engine at the base with a vacuum thrust of 1,390 kN (310,000 lbf). The H173 EPC weighed about 189 t (417,000 lb), including 175 t (386,000 lb) of propellant.[8] After the main cryogenic stage runs out of fuel, it re-entered the atmosphere for an ocean splashdown.

Solid boosters

Attached to the sides were two P241 (P238 for Ariane 5G and G+) solid rocket boosters (SRBs or EAPs from the French Étages d'Accélération à Poudre), each weighing about 277 t (611,000 lb) full and delivering a thrust of about 7,080 kN (1,590,000 lbf). They were fueled by a mix of ammonium perchlorate (68%) and aluminium fuel (18%) and HTPB (14%). They each burned for 130 seconds before being dropped into the ocean. The SRBs were usually allowed to sink to the bottom of the ocean, but, like the Space Shuttle Solid Rocket Boosters, they could be recovered with parachutes, and this was occasionally done for post-flight analysis. Unlike Space Shuttle SRBs, Ariane 5 boosters were not reused. The most recent attempt was for the first Ariane 5 ECA mission in 2009. One of the two boosters was successfully recovered and returned to the Guiana Space Center for analysis.[9] Prior to that mission, the last such recovery and testing was done in 2003.[citation needed]

The French M51 submarine-launched ballistic missile (SLBM) shared a substantial amount of technology with these boosters.[10]

In February 2000, the suspected nose cone of an Ariane 5 booster washed ashore on the South Texas coast, and was recovered by beachcombers before the government could get to it.[11]

Second stage

EPS Upper Stage used on Ariane 5ES

The second stage was on top of the main stage and below the payload. The original Ariane — Ariane 5G — used the EPS (Étage à Propergols Stockables — Storable Propellant Stage), which was fueled by monomethylhydrazine (MMH) and nitrogen tetroxide, containing 10,000 kg (22,000 lb) of storable propellant. The EPS was subsequently improved for use on the Ariane 5G+, GS, and ES.

The EPS upper stage was capable of repeated ignition, first demonstrated during flight V26 which was launched on 5 October 2007. This was purely to test the engine, and occurred after the payloads had been deployed. The first operational use of restart capability as part of a mission came on 9 March 2008, when two burns were made to deploy the first Automated Transfer Vehicle (ATV) into a circular parking orbit, followed by a third burn after ATV deployment to de-orbit the stage. This procedure was repeated for all subsequent ATV flights.

Ariane 5ECA used the ESC (Étage Supérieur Cryotechnique — Cryogenic Upper Stage), which was fueled by liquid hydrogen and liquid oxygen. The ESC used the HM7B engine previously used in the Ariane 4 third stage. The propellent load of 14.7 tonne allowed the engine to burn for 945 seconds while providing 6.5 tonne of thrust. The ESC provided roll control during powered flight and full attitude control during payload separation using hydrogen gas thrusters. Oxygen gas thrusters allowed longitudinal acceleration after engine cutoff. The flight assembly included the Vehicle Equipment Bay, with flight electronics for the entire rocket, and the payload interface and structural support.[12][13]

Fairing

The payload and all upper stages were covered at launch by a fairing for aerodynamic stability and protection from heating during supersonic flight and acoustic loads. It was jettisoned once sufficient altitude has been reached, typically above 100 km (62 mi). It was made by Ruag Space and since flight VA-238 it was composed of 4 panels.[14][clarification needed]

Variants

More information Variant, Description ...

Launch system status:   Retired ·   Cancelled ·   Operational ·   Under development

Launch pricing and market competition

As of November 2014, the Ariane 5 commercial launch price for launching a "midsize satellite in the lower position" was approximately €50 million,[20] competing for commercial launches in an increasingly competitive market.

The heavier satellite was launched in the upper position on a typical dual-satellite Ariane 5 launch and was priced higher than the lower satellite,[21][clarification needed] on the order of €90 million as of 2013.[22][23]

Total launch price of an Ariane 5 – which could transport up to two satellites to space, one in the "upper" and one in the "lower" positions – was around €150 million as of January 2015.[23]

Cancelled plans for future developments

Belgian components produced for the Ariane 5 European heavy-lift launch vehicle explained

Ariane 5 ME

The Ariane 5 ME (Mid-life Evolution) was in development into early 2015, and was seen as a stopgap between Ariane 5ECA/Ariane 5ES and the new Ariane 6. With first flight planned for 2018, it would have become ESA's principal launcher until the arrival of the new Ariane 6 version. ESA halted funding for the development of Ariane 5ME in late 2014 to prioritize development of Ariane 6.[24]

The Ariane 5ME was to use a new upper stage, with increased propellant volume, powered by the new Vinci engine. Unlike the HM-7B engine, it was to be able to restart several times, allowing for complex orbital maneuvers such as insertion of two satellites into different orbits, direct insertion into geosynchronous orbit, planetary exploration missions, and guaranteed upper stage deorbiting or insertion into graveyard orbit.[25][26] The launcher was also to include a lengthened fairing up to 20 m (66 ft) and a new dual launch system to accommodate larger satellites. Compared to an Ariane 5ECA model, the payload to GTO was to increase by 15% to 11,500 kg (25,400 lb) and the cost-per-kilogram of each launch was projected to decline by 20%.[25]

Development

Originally known as the Ariane 5ECB, Ariane 5ME was to have its first flight in 2006. However, the failure of the first ECA flight in 2002, combined with a deteriorating satellite industry, caused ESA to cancel development in 2003.[27] Development of the Vinci engine continued, though at a lower pace. The ESA Council of Ministers agreed to fund development of the new upper stage in November 2008.[28]

In 2009, EADS Astrium was awarded a €200 million contract,[29] and on 10 April 2012 received another €112 million contract to continue development of the Ariane 5ME [30] with total development effort expected to cost €1 billion.[31]

On 21 November 2012, ESA agreed to continue with the Ariane 5ME to meet the challenge of lower priced competitors. It was agreed the Vinci upper stage would also be used as the second stage of a new Ariane 6, and further commonality would be sought.[26] Ariane 5ME qualification flight was scheduled for mid-2018, followed by gradual introduction into service.[25]

On 2 December 2014, ESA decided to stop funding the development of Ariane 5ME and instead focus on Ariane 6, which was expected to have a lower cost per launch and allow more flexibility in the payloads (using two or four P120C solid boosters depending on total payload mass).[24]

Solid propellant stage

Work on the Ariane 5 EAP motors was continued in the Vega programme. The Vega 1st stage engine – the P80 engine – was a shorter derivation of the EAP.[32] The P80 booster casing was made of filament wound graphite epoxy, much lighter than the current stainless steel casing. A new composite steerable nozzle was developed while new thermal insulation material and a narrower throat improved the expansion ratio and subsequently the overall performance. Additionally, the nozzle had electromechanical actuators which replaced the heavier hydraulic ones used for thrust vector control.

These developments could maybe have made their way back into the Ariane programme, but this was most likely an inference based on early blueprints of the Ariane 6 having a central P80 booster and 2-4 around the main one.[26][33] The incorporation of the ESC-B with the improvements to the solid motor casing and an uprated Vulcain engine would have delivered 27,000 kg (60,000 lb) to LEO. This would have been developed for any lunar missions but the performance of such a design might not have been possible if the higher Max-Q for the launch of this launch vehicle would have posed a constraint on the mass delivered to orbit.[34]

Ariane 6

The design brief of the next generation launch vehicle Ariane 6 called for a lower-cost and smaller launch vehicle capable of launching a single satellite of up to 6,500 kg (14,300 lb) to GTO.[35] However, after several permutations the finalized design was nearly identical in performance to the Ariane 5,[36] focusing instead on lowering fabrication costs and launch prices. As of March 2014, Ariane 6 was projected to be launched for about €70 million per flight, about half of the Ariane 5 price.[35]

Initially development of Ariane 6 was projected to cost €3.6 billion.[37] In 2017, the ESA set 16 July 2020 as the deadline for the first flight.[38] As of June 2022, Arianespace expects the maiden flight to occur in 2023.[39]

Notable launches

Launch of the 34th Ariane 5 at Kourou

Ariane 5's first test flight (Ariane 5 Flight 501) on 4 June 1996 failed, with the rocket self-destructing 37 seconds after launch because of a malfunction in the control software.[40] A data conversion from 64-bit floating-point value to 16-bit signed integer value to be stored in a variable representing horizontal bias caused a processor trap (operand error)[41] because the floating-point value was too large to be represented by a 16-bit signed integer. The software had been written for the Ariane 4 where efficiency considerations (the computer running the software had an 80% maximum workload requirement[41]) led to four variables being protected with a handler while three others, including the horizontal bias variable, were left unprotected because it was thought that they were "physically limited or that there was a large margin of safety".[41] The software, written in Ada, was included in the Ariane 5 through the reuse of an entire Ariane 4 subsystem despite the fact that the particular software containing the bug, which was just a part of the subsystem, was not required by the Ariane 5 because it has a different preparation sequence than the Ariane 4.[41]

The second test flight (L502, on 30 October 1997) was a partial failure. The Vulcain nozzle caused a roll problem, leading to premature shutdown of the core stage. The upper stage operated successfully, but it could not reach the intended orbit. A subsequent test flight (L503, on 21 October 1998) proved successful and the first commercial launch (L504) occurred on 10 December 1999 with the launch of the XMM-Newton X-ray observatory satellite.[42]

Another partial failure occurred on 12 July 2001, with the delivery of two satellites into an incorrect orbit, at only half the height of the intended GTO. The ESA Artemis telecommunications satellite was able to reach its intended orbit on 31 January 2003, through the use of its experimental ion propulsion system.

The next launch did not occur until 1 March 2002, when the Envisat environmental satellite successfully reached an orbit of 800 km (500 mi) above the Earth in the 11th launch. At 8,111 kg (17,882 lb), it was the heaviest single payload until the launch of the first ATV on 9 March 2008, at 19,360 kg (42,680 lb).

The first launch of the ECA variant on 11 December 2002 ended in failure when a main booster problem caused the rocket to veer off-course, forcing its self-destruction three minutes into the flight. Its payload of two communications satellites (STENTOR and Hot Bird 7), valued at about €630 million, was lost in the Atlantic Ocean. The fault was determined to have been caused by a leak in coolant pipes allowing the nozzle to overheat. After this failure, Arianespace SA delayed the expected January 2003 launch for the Rosetta mission to 26 February 2004, but this was again delayed to early March 2004 due to a minor fault in the foam that protects the cryogenic tanks on the Ariane 5. The failure of the first ECA launch was the last failure of an Ariane 5 until flight 240 in January 2018.

On 27 September 2003, the last Ariane 5G boosted three satellites (including the first European lunar probe, SMART-1), in Flight 162. On 18 July 2004, an Ariane 5G+ boosted what was at the time the heaviest telecommunication satellite ever, Anik F2, weighing almost 6,000 kg (13,000 lb).

The first successful launch of the Ariane 5ECA took place on 12 February 2005. The payload consisted of the XTAR-EUR military communications satellite, a 'SLOSHSAT' small scientific satellite and a MaqSat B2 payload simulator. The launch had been scheduled for October 2004, but additional testing and a military launch (of a Helios 2A observation satellite) delayed the attempt.

On 11 August 2005, the first Ariane 5GS (featuring the Ariane 5ECA's improved solid motors) boosted Thaicom 4, the heaviest telecommunications satellite to date at 6,505 kg (14,341 lb),[43] into orbit.

On 16 November 2005, the third Ariane 5ECA launch (the second successful ECA launch) took place. It carried a dual payload consisting of Spaceway F2 for DirecTV and Telkom-2 for PT Telekomunikasi of Indonesia. This was the launch vehicle's heaviest dual payload to date, at more than 8,000 kg (18,000 lb).

On 27 May 2006, an Ariane 5ECA launch vehicle set a new commercial payload lifting record of 8,200 kg (18,100 lb). The dual-payload consisted of the Thaicom 5 and Satmex 6 satellites.[44]

On 4 May 2007, the Ariane 5ECA set another new commercial record, lifting into transfer orbit the Astra 1L and Galaxy 17 communication satellites with a combined weight of 8,600 kg (19,000 lb), and a total payload weight of 9,400 kg (20,700 lb).[45] This record was again broken by another Ariane 5ECA, launching the Skynet 5B and Star One C1 satellites, on 11 November 2007. The total payload weight for this launch was of 9,535 kg (21,021 lb).[46]

On 9 March 2008, the first Ariane 5ES-ATV was launched to deliver the first ATV called Jules Verne to the International Space Station (ISS). The ATV was the heaviest payload ever launched by a European launch vehicle, providing supplies to the space station with necessary propellant, water, air and dry cargo. This was the first operational Ariane mission which involved an engine restart in the upper stage. The ES-ATV Aestus EPS upper stage was restartable while the ECA HM7-B engine was not.

On 1 July 2009, an Ariane 5ECA launched TerreStar-1 (now EchoStar T1), which was then, at 6,910 kg (15,230 lb), the largest and most massive commercial telecommunication satellite ever built at that time[47] until being overtaken by Telstar 19 Vantage, at 7,080 kg (15,610 lb), launched aboard Falcon 9. The satellite was launched into a lower-energy orbit than a usual GTO, with its initial apogee at roughly 17,900 km (11,100 mi).[48]

On 28 October 2010, an Ariane 5ECA launched Eutelsat's W3B (part of its W Series of satellites) and Broadcasting Satellite System Corporation (B-SAT)'s BSAT-3b satellites into orbit. But the W3B satellite failed to operate shortly after the successful launch and was written off as a total loss due to an oxidizer leak in the satellite's main propulsion system.[49] The BSAT-3b satellite, however, is operating normally.[50]

The VA253 launch on 15 August 2020 introduced two small changes that increased lift capacity by about 85 kg (187 lb); these were a lighter avionics and guidance-equipment bay, and modified pressure vents on the payload fairing, which were required for the subsequent launch of the James Webb Space Telescope. It also debuted a location system using Galileo navigation satellites.[51]

On 25 December 2021, VA256 launched the James Webb Space Telescope towards a Sun–Earth L2 halo orbit.[52] The precision of trajectory following launch led to fuel savings credited with potentially doubling the lifetime of the telescope by leaving more hydrazine propellant on-board for station-keeping than was expected.[52][53] According to Rudiger Albat, the program manager for Ariane 5, efforts had been made to select components for this flight that had performed especially well during pre-flight testing, including "one of the best Vulcain engines that we've ever built."[53]

GTO payload weight records

On 22 April 2011, the Ariane 5ECA flight VA-201 broke a commercial record, lifting Yahsat 1A and Intelsat New Dawn with a total payload weight of 10,064 kg (22,187 lb) to transfer orbit.[54] This record was later broken again during the launch of Ariane 5ECA flight VA-208 on 2 August 2012, lifting a total of 10,182 kg (22,447 lb) into the planned geosynchronous transfer orbit,[55] which was broken again 6 months later on flight VA-212 with 10,317 kg (22,745 lb) sent towards geosynchronous transfer orbit.[56] In June 2016, the GTO record was raised to 10,730 kg (23,660 lb),[57] on the first rocket in history that carried a satellite dedicated to financial institutions.[58] The payload record was pushed a further 5 kg (11 lb), up to 10,735 kg (23,667 lb) on 24 August 2016 with the launch of Intelsat 33e and Intelsat 36.[59] On 1 June 2017, the payload record was broken again to 10,865 kg (23,953 lb) carrying ViaSat-2 and Eutelsat-172B.[60] In 2021 VA-255 put 11,210 kg into GTO.

VA241 anomaly

On 25 January 2018, an Ariane 5ECA launched SES-14 and Al Yah 3 satellites. About 9 minutes and 28 seconds after launch, a telemetry loss occurred between the launch vehicle and the ground controllers. It was later confirmed, about 1 hour and 20 minutes after launch, that both satellites were successfully separated from the upper stage and were in contact with their respective ground controllers,[61] but that their orbital inclinations were incorrect as the guidance systems might have been compromised. Therefore, both satellites conducted orbital procedures, extending commissioning time.[62] SES-14 needed about 8 weeks longer than planned commissioning time, meaning that entry into service was reported early September instead of July.[63] Nevertheless, SES-14 is still expected to be able to meet the designed lifetime. This satellite was originally to be launched with more propellant reserve on a Falcon 9 launch vehicle since the Falcon 9, in this specific case, was intended to deploy this satellite into a high inclination orbit that would require more work from the satellite to reach its final geostationary orbit.[64] The Al Yah 3 was also confirmed healthy after more than 12 hours without further statement, and like SES-14, Al Yah 3's maneuvering plan was also revised to still fulfill the original mission.[65] As of 16 February 2018, Al Yah 3 was approaching the intended geostationary orbit, after series of recovery maneuvers had been performed.[66] The investigation showed that invalid inertial units' azimuth value had sent the vehicle 17° off course but to the intended altitude, they had been programmed for the standard geostationary transfer orbit of 90° when the payloads were intended to be 70° for this supersynchronous transfer orbit mission, 20° off norme.[67] This mission anomaly marked the end of 82nd consecutive success streak since 2003.[68]

Launch history

Launch statistics

Ariane 5 launch vehicles had accumulated 117 launches, 112 of which were successful, yielding a 95.7% success rate. Between April 2003 and December 2017, Ariane 5 flew 83 consecutive missions without failure, but the launch vehicle suffered a partial failure in January 2018.[69]

Rocket configurations

1
2
3
4
5
6
7
1996
2000
2004
2008
2012
2016
2020
  •   G
  •   G+
  •   GS
  •   ES
  •   ECA

Launch outcomes

1
2
3
4
5
6
7
1996
2000
2004
2008
2012
2016
2020
  •   Failure
  •   Partial failure
  •   Success

List of launches

All launches are from Centre Spatial Guyanais (CSG), Kourou, ELA-3.

More information #, Flight no. ...

See also


References

  1. "Arianespace aims high in Asia-Pacific". Flightglobal. Archived from the original on 2 June 2016. Retrieved 1 June 2016.
  2. "Ariane 5ES". ESA. Archived from the original on 3 September 2014. Retrieved 27 August 2014.
  3. "Arianespace begins building final 10 Ariane 5s ahead of Ariane 6 operational debut". Space Daily. Archived from the original on 1 February 2019. Retrieved 10 January 2019.
  4. Berger, Eric (21 June 2021). "The Ariane 6 debut is slipping again as Europe hopes for a late 2022 launch". Ars Technica. Retrieved 8 October 2021.
  5. Krebs, Gunter D. "MTG-S 1, 2 (Meteosat 13, 16 / Sentinel 4A, 4B)". Gunter's Space Page. Retrieved 13 May 2023.
  6. "Debuting upgrades, Ariane 5 rocket deploys three U.S.-built satellites in orbit". Spaceflight Now. 15 August 2020. Retrieved 17 August 2020.
  7. Svenson, Adam (6 July 2023). "Last Ariane 5 Mission Leaves Europe Without Launch Capacity". AIR SPACE News. Retrieved 23 July 2023.
  8. "Ariane 5 Data Sheet". Space Launch Report. Archived from the original on 8 November 2014. Retrieved 8 November 2014.{{cite web}}: CS1 maint: unfit URL (link)
  9. "France in Space #387". Office of Science and Technology Embassy of France in the USA. Archived from the original on 25 January 2009.
  10. Xavier Vavasseur (12 June 2020). "French Navy SSBN 'Le Téméraire' Test Fired M51 SLBM In Operational Conditions". navalnews.com. Retrieved 27 March 2023.
  11. "Government Loses Unidentified Floating Object". Fox News. Associated Press. 29 February 2000. Archived from the original on 24 February 2001.
  12. European Space Agency, "Ariane 5ECA": http://www.esa.int/Enabling_Support/Space_Transportation/Launch_vehicles/Ariane_5_ECA2 Discussed in context of other launch vehicles in Gérard Maral, Michel Bousquet, and Zhili Sun, Satellite Communications Systems: Systems, Techniques and Technology, sixth edition, London: Wiley, 2020 ISBN 9781119382072
  13. ESC-A – Cryogenic upper stage, accessed December 27, 2021
  14. "Ariane 5G". Gunter's Space Page. 12 December 2017. Retrieved 23 October 2021.
  15. "Ariane-5G+". Gunter's Space Page. 12 December 2017. Retrieved 23 October 2021.
  16. "Ariane 5 Evolution" (in German). Archived from the original on 25 October 2014. Retrieved 8 November 2014.
  17. "Ariane-5GS". Gunter's Space Page. 12 December 2017. Retrieved 23 October 2021.
  18. "Ariane-5ECA". Gunter's Space Page. 20 February 2020. Retrieved 23 October 2021.
  19. Svitak, Amy (1 March 2014). "SpaceX Says Falcon 9 To Compete For EELV This Year". Aviation Week. Archived from the original on 10 March 2014. Retrieved 4 January 2015. Advertised at US$56.5 million per launch, Falcon 9 missions to GTO cost almost US$15 million less than a ride atop a Chinese Long March 3B and are competitive with the cost to launch a midsize satellite in the lower position on a European Ariane 5ECA
  20. de Selding, Peter B. (2 November 2013). "SpaceX Challenge Has Arianespace Rethinking Pricing Policies". SpaceNews. Archived from the original on 27 November 2013. Retrieved 27 November 2013. The Arianespace commercial launch consortium is telling its customers it is open to reducing the cost of flights for lighter satellites on the Ariane 5 rocket in response to the challenge posed by SpaceX's Falcon 9 rocket
  21. Amos, Jonathan (3 December 2013). "SpaceX launches SES commercial TV satellite for Asia". BBC News. Archived from the original on 2 January 2017. Retrieved 4 January 2015. The commercial market for launching telecoms spacecraft is tightly contested, but has become dominated by just a few companies – notably, Europe's Arianespace, which flies the Ariane 5, and International Launch Services (ILS), which markets Russia's Proton vehicle. SpaceX is promising to substantially undercut the existing players on price, and SES, the world's second-largest telecoms satellite operator, believes the incumbents had better take note of the California company's capability. 'The entry of SpaceX into the commercial market is a game-changer.
  22. "With Eye on SpaceX, CNES Begins Work on Reusable Rocket Stage". SpaceNews. 5 January 2015. Retrieved 6 January 2015.
  23. Kyle, Ed (3 December 2014). "Ariane 6". Space Launch Report. Archived from the original on 30 May 2015. Retrieved 17 July 2015.{{cite web}}: CS1 maint: unfit URL (link)
  24. "ESA – Adapted Ariane 5ME". Archived from the original on 6 October 2014. Retrieved 23 July 2014.
  25. Stephen Clark (21 November 2012). "European ministers decide to stick with Ariane 5, for now". Spaceflight Now. Archived from the original on 27 November 2012. Retrieved 22 November 2012.
  26. "ESA cancels plans for uprated Ariane 5 ECB". Archived from the original on 30 July 2013. Retrieved 27 April 2012.
  27. "ESA's Council of Ministers decides the future of European space exploration". Archived from the original on 20 January 2012. Retrieved 27 November 2008.
  28. "ESA signs contract for Ariane 5 rocket enhancements". Archived from the original on 25 December 2009. Retrieved 22 December 2009.
  29. Messier, Dough (18 January 2014). "ESA Faces Large Cost for Ariane 5 Upgrade". Parabolic Arc. Archived from the original on 5 May 2014. Retrieved 9 May 2014.
  30. Usa, Usa Ibp (2010). European Space Policy and Programs Handbook. Int'l Business Publications. p. 29. ISBN 9781433015328.
  31. "Successful firing of Vega's first-stage motor in Kourou". ESA. 30 November 2006. Archived from the original on 5 March 2012. Retrieved 30 December 2007.
  32. David Iranzo-Greus (23 March 2005). "Ariane 5—A European Launcher for Space Exploration". EADS SPACE Transportation. Archived from the original on 11 September 2008. Retrieved 10 April 2008.
  33. Clark, Stephen (27 March 2014). "Germany calls for redesign of next-generation Ariane". Spaceflight Now. Archived from the original on 12 May 2014. Retrieved 8 May 2014.
  34. "Ariane 6". Arianespace. Archived from the original on 19 October 2018. Retrieved 11 December 2018.
  35. "Media backgrounder for ESA Council at Ministerial Level" (Press release). ESA. 27 November 2014. Retrieved 24 March 2016.
  36. Amos, Jonathan (22 June 2017). "Full thrust on Europe's new rocket". BBC News. Archived from the original on 22 March 2018. Retrieved 25 January 2022.
  37. Rainbow, Jason (13 June 2022). "Ariane 6 launch debut pushed into 2023". SpaceNews. Retrieved 15 June 2022.
  38. Garfinkel, Simson. "History's Worst Software Bugs". Wired. Retrieved 3 September 2009.
  39. "Ariane 5 Flight 501 Failure, Report by the Inquiry Board". esamultimedia.esa.int. Archived from the original (PDF) on 15 August 2000.
  40. "X-ray Satellite XMM-Newton Celebrates 20 Years in Space". NASA. 10 December 2019. Retrieved 27 March 2023.
  41. "iPStar 1 (Thaicom 4, MEASAT 5, Synertone 1)". Gunter's Space Page. 6 February 2018. Retrieved 23 October 2021.
  42. "Ariane lifts record dual payload". BBC News. 27 May 2006. Archived from the original on 26 September 2006. Retrieved 28 May 2006.
  43. "Ariane 5 – second launch of six in 2007". ESA. 5 May 2007. Archived from the original on 9 May 2007. Retrieved 6 May 2007.
  44. "Ariane 5 – fifth launch of six in 2007". ESA. 11 November 2007. Archived from the original on 17 November 2007. Retrieved 19 November 2007.
  45. "Integration of Ariane 5 is completed for its upcoming heavy-lift launch with TerreStar-1". Arianespace. 2 June 2009. Archived from the original on 23 February 2012. Retrieved 1 July 2009.
  46. Graham, William (21 July 2018). "SpaceX Falcon 9 sets new record with Telstar 19V launch from SLC-40". NASASpaceFlight.com. Archived from the original on 22 July 2018. Retrieved 15 September 2018.
  47. "EUTELSAT STATEMENT on LOSS OF W3B SATELLITE" (Press release). Eutelsat Communications. 29 October 2010. Archived from the original on 1 November 2010. Retrieved 30 October 2010.
  48. Clark, Stephen (15 August 2020). "Debuting upgrades, Ariane 5 rocket deploys three U.S.-built satellites in orbit". Spaceflight Now. Retrieved 17 August 2020.
  49. Amos, Jonathan (9 January 2022). "James Webb telescope completes epic deployment sequence". www.bbc.com. BBC News. Retrieved 10 January 2022.
  50. Berger, Eric (10 January 2022). "All hail the Ariane 5 rocket, which doubled the Webb telescope's lifetime". www.arstechnica.com. Ars Technica. Retrieved 25 January 2022.
  51. "Arianespace launch a success: Yahsat Y1A and Intelsat New Dawn in orbit". Arianespace. 22 April 2011. Archived from the original on 23 October 2013. Retrieved 23 April 2011.
  52. "Arianespace launch a success: Ariane 5ECA orbits INTELSAT 20 and HYLAS 2 satellites". Arianespace. 2 August 2012. Archived from the original on 31 October 2015. Retrieved 3 August 2012.
  53. "Arianespace orbits Amazonas-3 and Azerspace/Africasat-1a satellites; First Ariane 5ECA mission in 2013 a success". Arianespace. 7 February 2013. Archived from the original on 16 September 2015. Retrieved 27 May 2015.
  54. "Arianespace makes history on its latest Ariane 5 mission". Space Daily. 18 June 2016. Archived from the original on 8 August 2018. Retrieved 10 January 2019.
  55. "BRI Launches BRISat: First Satellite Owned and Operated by a Bank". Archived from the original on 23 June 2016. Retrieved 21 June 2016.
  56. "Intelsat Pair lifted into Orbit in Record-Setting Ariane 5 Launch". Spaceflight 101. 24 August 2016. Archived from the original on 27 August 2016. Retrieved 25 August 2016.
  57. "Arianespace marks its 2017 mid-year launch milestone with a record-setting Ariane 5 mission at the service of ViaSat and Eutelsat" (Press release). Arianespace. 1 June 2017. Archived from the original on 6 June 2017. Retrieved 2 June 2017.
  58. Stephen Clark (2 January 2018). "Live coverage: Ariane 5 launches with SES 14 and Al Yah 3 telecom satellites". Spaceflight Now. Archived from the original on 26 January 2018. Retrieved 26 January 2018.
  59. "Ariane 5 satellites in orbit but not in right location". Yahoo! News. AFP News. 26 January 2018. Archived from the original on 26 January 2018. Retrieved 26 January 2018.
  60. "SES-14 Goes Operational to Serve the Americas". SES. 4 September 2018. Archived from the original on 4 September 2018. Retrieved 26 September 2018.
  61. "SES Swaps SES-12 and SES-14 Launches". SES. 28 August 2018. Archived from the original on 1 February 2018. Retrieved 17 February 2018.
  62. "Yahsat confirms launch of Al Yah 3 mission Satellite to greatly increase its global coverage". journeyofpride.com. Archived from the original on 27 January 2018. Retrieved 26 January 2018.
  63. Neiberlien, Henry (29 January 2018). "After 16 years, Ariane 5 finally fails". The Avion. Archived from the original on 30 January 2018. Retrieved 30 January 2018.
  64. "Investigation Pinpoints Cause of Ariane 5 Partial Failure". Parabolic Arc. Retrieved 26 January 2021.
  65. "V88 Ariane 501" (in French). 1997. Archived from the original on 21 July 2011. Retrieved 24 March 2011.
  66. "Ariane 502—Results of detailed data analysis". ESA. 8 April 1998. Archived from the original on 15 April 2010. Retrieved 22 September 2009.
  67. "Ariane 5". Encyclopedia Astronautica. Archived from the original on 13 October 2016.
  68. Krebs, Gunter (21 July 2019). "Eutelsat W3B, W3C, W3D / Eutelsat 3D, 16A". Gunter's Space Page. Retrieved 23 October 2021.
  69. "Ariane 5 Suffers Rare On-Pad Abort after Engine Ignition". Spaceflight 101. 5 September 2017. Archived from the original on 16 March 2018. Retrieved 16 March 2018.
  70. "Azerspace/Africasat-1a is prepared for Arianespace's first Ariane 5 launch in 2013". Archived from the original on 29 August 2018. Retrieved 29 August 2018.
  71. Dorimulu, Primus (20 June 2016). "BRI Launches BRISat: First Satellite Owned and Operated by a Bank". Jakarta Globe. Archived from the original on 16 March 2018. Retrieved 16 March 2018.
  72. Clark, Stephen (30 January 2017). "Intelsat satellite in service after overcoming engine trouble". Spaceflight Now. Archived from the original on 26 June 2018. Retrieved 3 February 2018.
  73. Henry, Caleb (1 September 2017). "Intelsat-33e propulsion problems to cut service life by 3.5 years". SpaceNews. Retrieved 3 February 2018.
  74. Krebs, Gunter. "SkyBrasil-1 (Intelsat 32e)". space.skyrocket.de. Gunter's Space Page. Archived from the original on 5 February 2017. Retrieved 16 March 2018.
  75. "A rocket's launch from French Guiana has been delayed indefinitely due to protests". The Verge. 23 March 2017. Archived from the original on 23 March 2017. Retrieved 23 March 2017.
  76. Clark, Stephen (2 June 2017). "Ariane 5 succeeds in launch of two high-value communications satellites". Spaceflight Now. Archived from the original on 26 June 2018. Retrieved 16 February 2018.
  77. Clark, Stephen (1 June 2017). "Two high-power broadband satellites set for record-breaking launch on Ariane 5 rocket". Archived from the original on 26 June 2018. Retrieved 16 February 2018.
  78. Henry, Caleb (15 February 2018). "Viasat says ViaSat-2 business plan intact despite antenna glitch". Space News. Retrieved 16 February 2018.
  79. Clark, Stephen (9 September 2017). "Electrical problem prompted Ariane 5 countdown abort". Spaceflight Now. Archived from the original on 10 March 2019. Retrieved 16 March 2018.
  80. "Launch VA241: Ariane 5 delivers SES-14 and Al Yah 3 to orbit". Arianespace. Archived from the original on 26 January 2018. Retrieved 27 January 2018.
  81. Clark, Stephen (26 January 2018). "Probe into off-target Ariane 5 launch begins, SES and Yahsat payloads healthy". Spaceflight Now. Archived from the original on 6 May 2018. Retrieved 16 March 2018.
  82. "SES-14 in good health and on track despite launch anomaly". SES. Archived from the original on 28 January 2018. Retrieved 21 March 2018.
  83. Forrester, Chris (12 March 2018). "YahSat to make 50% insurance claim". Advanced Television. Archived from the original on 21 March 2018. Retrieved 21 March 2018.
  84. Bergin, Chris (5 April 2018). "Ariane 5 to return with DSN-1/Superbird-8 and HYLAS 4". NASASpaceFlight.com. Archived from the original on 6 April 2018. Retrieved 5 April 2018.
  85. Clark, Stephen (3 July 2018). "Arianespace aims for busy second half of 2018". Spaceflight Now. Archived from the original on 14 July 2019. Retrieved 4 July 2018.
  86. "Launch delay for VA243" (Press release). Arianespace. 24 April 2018. Archived from the original on 22 June 2018. Retrieved 26 May 2018.
  87. "GSat 11". Gunter's Space Page. 26 December 2018. Retrieved 23 October 2021.
  88. Krebs, Gunter (19 February 2020). "GEO-KOMPSAT 2A (GK 2A, Cheollian 2A)". Gunter's Space Page. Retrieved 23 October 2021.
  89. "Geostationary Korea Multi Purpose Satellite (GEO-KOMPSAT, Cheollian)". Korea Aerospace Research Institute. Archived from the original on 13 October 2017. Retrieved 3 August 2017.
  90. Clark, Stephen (29 April 2015). "Arabsat contracts go to Lockheed Martin, Arianespace and SpaceX". Spaceflight Now. Archived from the original on 23 August 2018. Retrieved 7 November 2018.
  91. Krebs, Gunter (19 February 2020). "EDRS C / HYLAS 3". Gunter's Space Page. Retrieved 23 October 2021.
  92. "Arianespace selected by Airbus Defence and Space to launch EDRS-C satellite". Arianespace. 19 March 2015. Archived from the original on 11 December 2015. Retrieved 4 October 2015.
  93. "Arianespace to launch Intelsat 39" (Press release). Arianespace. 4 January 2017. Archived from the original on 9 January 2017. Retrieved 8 January 2017.
  94. Henry, Caleb (26 November 2019). "Ariane 5 launches satellites for Egypt, Inmarsat". SpaceNews. Retrieved 26 November 2019.
  95. "Arianespace to launch Inmarsat's fifth Global Xpress satellite". Arianespace. 27 October 2017. Archived from the original on 27 October 2017. Retrieved 28 October 2017.
  96. Krebs, Gunter (3 December 2019). "Inmarsat-5 F5 (GX 5)". Gunter's Space Page. Retrieved 23 October 2021.
  97. "Fifth Global Xpress satellite readied for Ariane 5 launch". Arianespace. 2 October 2019. Retrieved 30 October 2019.
  98. "Ariane Flight VA 250" (Press release). Arianespace. 26 November 2019. Archived from the original on 26 November 2019. Retrieved 26 November 2019.
  99. Krebs, Gunter (25 February 2020). "Eutelsat Konnect". Gunter's Space Page. Retrieved 23 October 2021.
  100. "Ariane Flight VA255". Arianespace. Retrieved 27 October 2021.
  101. "DutchSpace on Twitter". Twitter. Retrieved 14 December 2022.
  102. Foust, Jeff (10 September 2019). "Airbus and Telespazio to sell excess capacity on Syracuse 4 satellites". SpaceNews. Retrieved 7 September 2022.
  103. "DutchSpace on Twitter". Twitter. Retrieved 6 August 2023.

Share this article:

This article uses material from the Wikipedia article Ariane_5, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.