Automatic_Train_Operation

Automatic train operation

Automatic train operation

Operational safety enhancement device


Automatic train operation (ATO) is a method of operating trains automatically where the driver is not required or required for supervision at most.[1] Alternatively, ATO can be defined as a subsystem within the automatic train control, which performs any or all of functions like programmed stopping, speed adjusting, door operation, and similar otherwise assigned to the train operator.[2]

The degree of automation is indicated by the Grade of Automation (GoA), up to GoA4 in which the train is automatically controlled without any staff on board.[3] On most systems for lower grades of automation up to GoA2, there is a driver present to mitigate risks associated with failures or emergencies. Driverless automation is primarily used on automated guideway transit systems where it is easier to ensure the safety due to isolated tracks. Fully automated trains for mainline railways are an area of research.[4] The first driverless experiments in the history of train automation date back to 1920s.[5]

Grades of automation

A diagram representing the different levels of automation possible on railways
Operation scheme of ETCS Level 3 as an example for GoA2

According to the International Association of Public Transport (UITP) and the international standard IEC 62290‐1, there are five Grades of Automation (GoA) of trains.[6][7][8] These levels correspond with the automotive SAE J3016 classification:[9][10]

More information Grade of automation, Train operation ...

Additional types

More information Grade of automation, Description and examples ...

Operation of ATO

Early ATO trial on a R22 train at track 4 of the 42nd Street Shuttle (right) in 1962.

Many modern systems are linked with automatic train protection (ATP) and, in many cases, automatic train control (ATC) where normal signaling operations such as route setting and train regulation are carried out by the system. The ATC and ATP systems will work together to maintain a train within a defined tolerance of its timetable. The combined system will marginally adjust operating parameters such as the ratio of power to coasting when moving and station dwell time in order to adhere to a defined timetable.[citation needed]

Whereas ATP is the safety system that ensures a safe spacing between trains and provides sufficient warning as to when to stop. ATO is the "non-safety" part of train operation related to station stops and starts, and indicates the stopping position for the train once the ATP has confirmed that the line is clear.[citation needed]

The train approaches the station under clear signals, so it can do a normal run-in. When it reaches the first beacon – originally a looped cable, now usually a fixed transponder – a station brake command is received by the train. The on-board computer calculates the braking curve to enable it to stop at the correct point, and as the train runs in towards the platform, the curve is updated a number of times (which varies from system to system) to ensure accuracy.[20]

When the train has stopped, it verifies that its brakes are applied and checks that it has stopped within the door-enabling loops. These loops verify the position of the train relative to the platform and which side the doors should open. Once all this is complete, the ATO will open the doors. After a set time, predetermined or varied by the control centre as required, the ATO will close the doors and automatically restart the train if the door closed proving circuit is complete. Some systems have platform screen doors as well. ATO will also provide a signal for these to open once it has completed the on-board checking procedure. Although described here as an ATO function, door enabling at stations is often incorporated as part of the ATP equipment because it is regarded as a "vital" system and requires the same safety validation processes as ATP.[20]

Once door operation is completed, ATO will accelerate the train to its cruising speed, allow it to coast to the next station brake command beacon and then brake into the next station, assuming no intervention by the ATP system.[20]

Advantages of GoA3+

In 2021, the Florida Department of Transportation funded a review by scientists from Florida State University, University of Talca and Hong Kong Polytechnic University, which showed the following advantages of autonomous trains:[21]

  1. Eliminating human sources of errors
  2. Increasing capacity by stronger utilisation of existing rail tracks
  3. Reduction of operational costs. Paris Métro reduced its operational costs in case of GoA 4 by 30%.[22]
  4. Increasing overall service reliability
  5. Improving fleet management and service flexibility
  6. Increasing energy efficiency

Accidents and incidents involving ATO

While ATO has been proven to drastically reduce the chance of human errors in railway operation, there have been a few notable accidents involving ATO systems:

More information Year, Country ...

ATO research projects

More information Name, Year ...

Future

In October 2021, the pilot project of the "world's first automated, driverless train" on regular tracks shared with other rail traffic was launched in the city of Hamburg, Germany. The conventional, standard-track, non-metro train technology could, according to reports, theoretically be implemented for rail transport worldwide and is also substantially more energy efficient.[46][47]

ATO will be introduced on the London Underground's Circle, District, Hammersmith & City, and Metropolitan lines by 2022. ATO is used on parts of Crossrail. Trains on the central London section of Thameslink were the first to use ATO on the UK mainline railway network[48] with ETCS Level 2.

In April 2022, JR West announced that they will test ATO on a 12-car W7 series Shinkansen train used on the Hokuriku Shinkansen at the Hakusan General Rolling Stock Yard during 2022.[49]

The U-Bahn in Vienna will be equipped with ATO in 2023 on the new U5 line.

All lines being built for the new Sydney Metro will feature driverless operation without any staff in attendance.

Since 2012, the Toronto subway has been undergoing signal upgrades in order to use ATO and ATC over the next decade.[50] Work has been completed on sections Yonge–University line.[51] The underground portion of Line 5 Eglinton will be equipped with ATC and ATO in 2022. The underground portion will use a GoA2 system while the Eglinton Maintenance and Storage Facility will use a GoA4 system and travel driverless around the yard.[52] The Ontario Line is proposed have a GoA4 driverless system and will open in 2030.[53]

Since March 2021, SNCF and Hauts-de-France region have begun an experimentation with a French Regio 2N Class, equipped with sensors and software [fr](fr).

In 2025, regular driverless passenger services on the line from Kopidlno to Dolní Bousov will be resumed by AŽD Praha.[54]

See also


References

  1. "IEC 60050 - International Electrotechnical Vocabulary - Details for IEV number 821-09-01: "automatic train operation"". www.electropedia.org. Retrieved 23 January 2024.
  2. "Thales and Knorr-Bremse will jointly develop ATO for freight trains". RailTech.com. 4 November 2022. Retrieved 5 March 2023.
  3. "Europe's ERTMS dream enters a new era". International Railway Journal. Retrieved 5 March 2023.
  4. Liu, Hui (2021). Unmanned driving systems for smart trains. Amsterdam. ISBN 9780128228302.{{cite book}}: CS1 maint: location missing publisher (link)
  5. International Association of Public Transport. "A global bid for automation: UITP Observatory of Automated Metros confirms sustained growth rates for the coming years" (PDF). Belgium. Archived from the original (PDF) on 2016-05-01. Retrieved 2014-06-08.
  6. Elisabeth Fischer (23 August 2011). "Justifying automation". Railway-Technology.com.
  7. "IEC 62290-1:2014 – IEC-Normen – VDE VERLAG". www.vde-verlag.de. Retrieved 2 May 2022.
  8. "Cross-Domain Fertilisation in the Evolution towards Autonomous Vehicles". ercim-news.ercim.eu. ERCIM News. Retrieved 8 May 2022.
  9. Nießen, Nils; Schindler, Christian; Vallee, Dirk (2017). "Assistierter, automatischer oder autonomer Betrieb – Potentiale für den Schienenverkehr" (PDF). Verkehr & Betrieb.
  10. Peleska, Jan; Haxthausen, Anne E.; Lecomte, Thierry (2022). "Standardisation Considerations for Autonomous Train Control". Leveraging Applications of Formal Methods, Verification and Validation. Practice. Lecture Notes in Computer Science. Vol. 13704. Springer Nature Switzerland. pp. 286–307. doi:10.1007/978-3-031-19762-8_22. ISBN 978-3-031-19761-1.
  11. European Union Agency for Railways (2017). "X2Rail–1 ATO over ETCS (up to GoA4)" (PDF). Archived from the original (PDF) on 2022-07-18. Retrieved 2022-05-02.
  12. Korf, Wim; Grinwis, Piet; Podt, Theo (2010). "Anticiperen op waardevol vervoer" (PDF) (in Dutch). Rapportage audit Noord/Zuidlijn.
  13. Napoli, S. (2018). "01-03-00079 1.02 Branchenlösung ATO auf GoA2(+)". VÖV UTP (in German). Retrieved 25 December 2022.
  14. Tagiew, Rustam; Buder, Thomas; Hofmann, Kai; Klotz, Christian; Tilly, Roman (2 July 2021). "Towards Nucleation of GoA3+ Approval Process". 2021 5th High Performance Computing and Cluster Technologies Conference. Association for Computing Machinery. pp. 41–47. doi:10.1145/3497737.3497742. ISBN 978-1-4503-9013-2. S2CID 245426687. Retrieved 2 May 2022.
  15. Lagay, Rémy; Adell, Gemma Morral (October 2018). "The Autonomous Train: A game changer for the railways industry". 2018 16th International Conference on Intelligent Transportation Systems Telecommunications (ITST). pp. 1–5. doi:10.1109/ITST.2018.8566728. ISBN 978-1-5386-5544-3. S2CID 54463761.
  16. "ATO". Railway Technical Web Page. Archived from the original on 12 April 2012.
  17. Singh, Prashant; Dulebenets, Maxim A.; Pasha, Junayed; Gonzalez, Ernesto D. R. Santibanez; Lau, Yui-Yip; Kampmann, Raphael (2021). "Deployment of Autonomous Trains in Rail Transportation: Current Trends and Existing Challenges". IEEE Access. 9: 91427–91461. Bibcode:2021IEEEA...991427S. doi:10.1109/ACCESS.2021.3091550. hdl:10397/92123. ISSN 2169-3536. S2CID 235749326.
  18. Cohen, J. M.; Barron, A. S.; Anderson, R. J.; Graham, D. J. "Impacts of Unattended Train Operations (UTO) on Productivity and Efficiency in Metropolitan Railways". National Academy of Sciences.
  19. "大阪市ニュートラム暴走事故 原因はリレー回路接続不良 運輸省が中間報告 ブレーキ指令伝わらず". Kotsu Shimbun. Kotsu Shimbunsha. 1993-11-09. p. 1.
  20. "大阪市交「ニュートラム」 きょう運行再開". Kotsu Shimbun. Kotsu Shimbunsha. 1993-11-19. p. 1.
  21. "Un choque en el metro de México deja al menos 12 heridos" [A train crash at Mexico's metro leaves 12 injured]. El País (in Spanish). 5 May 2015. Archived from the original on 27 December 2019. Retrieved 30 May 2021.
  22. Robles, Johana; Ruiz, Fanny (5 May 2015). "Chocan trenes en Línea 5 del Metro" [Trains crash ate Metro Line 5]. El Universal (in Spanish). Archived from the original on 30 May 2021. Retrieved 30 May 2021.
  23. Shoichet, Catherine E. (4 May 2015). "Mexico City metro trains crash; injuries reported". CNN. Archived from the original on 3 May 2021. Retrieved 30 May 2021.
  24. Noticieros Televisa (13 May 2015). "México:Dan a conocer detalles del choque en el Metro Oceanía" [Mexico: Details of crash at Oceanía station released]. Revista Rieles. Rieles Multimedio. Archived from the original on 30 May 2021.
  25. "Error humano causó choque en Metro Oceanía, informa comité investigador". Aristegui Noticias (in Spanish). 12 May 2015. Archived from the original on 15 May 2015. Retrieved 30 May 2021.
  26. Ferrer, Angélica (11 March 2020). "Y a todo esto, ¿cuántos choques han ocurrido a lo largo de la historia del Metro de la CDMX?" [And by the way, how many crashes have occurred throughout the history of the Mexico City Metro?]. El Financiero (in Spanish). Archived from the original on 30 May 2021.
  27. Valdez, Ilich (12 May 2015). "Error humano causó choque de trenes en Metro Oceanía" [Human error caused train crash at Oceanía station]. Milenio (in Spanish). Archived from the original on 4 April 2020. Retrieved 15 March 2020.
  28. Lim, Adrian (16 November 2017). "Joo Koon collision: 'Inadvertent removal' of software fix led to collision". Straits Times. Archived from the original on 17 November 2017. Retrieved 17 November 2017.
  29. "Signalling system in Hong Kong MTR train collision a 'version' of that used in Singapore". CNA. 19 March 2019. Archived from the original on 30 January 2021. Retrieved 30 January 2021.
  30. "Investigation Report on Incident of the New Signalling System Testing on MTR Tsuen Wan Line" (PDF). Electrical and Mechanical Services Department. 5 July 2019. Archived (PDF) from the original on 30 January 2021. Retrieved 30 January 2021.
  31. Azman, Fareez. "47 parah, 166 cedera ringan LRT bertembung berhampiran Stesen KLCC". Astro Awani. Retrieved 2021-05-24.
  32. 董怡虹 (2022-01-24). "上海地铁一女乘客被屏蔽门夹住:送医抢救后身亡,有关部门已介入". 新民晚报 (in Chinese (China)). Retrieved 2022-01-25.
  33. Ritter, Norbert (2001). "Einführungsstrategien für die Automatisierung von Nahverkehrsbahnen". ZEV DET Glasers Annalen – Die Eisenbahntechnik. pp. 129–130, 132, 134–137. Retrieved 16 October 2022.
  34. Trummer, Georg; Rappe, Jutta (2008). "RUBIN: Die erste fahrerlose U-Bahn im Mischbetrieb". ZEVrail. pp. 347–352. Retrieved 9 June 2023.
  35. Haecker, Thies; Alcatel-SEL-Aktiengesellschaft, Unternehmensbereich Transportsysteme (2003). "Forschungsvorhaben Komponenten Automatisierter Schienenverkehr KOMPAS, Phase I : Schlussbericht". Retrieved 16 October 2022.
  36. Müller, Christoph (2010). "RCAS — Collision avoidance without permanent installations". Internationales Verkehrswesen : Transport and mobility management. pp. 20–22. Retrieved 16 October 2022.
  37. May, Tiana (29 September 2022). "safe.trAIn Project to Advance Development of AI-Enabled Automated Trains". Railway-News. Retrieved 23 January 2024.
  38. "Projekt "AutomatedTrain": Züge fahren vollautomatisiert und fahrerlos | Verkehrslage". verkehrslage.vkw.tu-dresden.de. Retrieved 21 February 2024.
  39. "Germany unveils first self-driving train". techxplore.com. Retrieved 15 November 2021.
  40. "Germany: Hamburg gets first fully automated tram | DW | 11 October 2021". Deutsche Welle (www.dw.com). Retrieved 15 November 2021.
  41. "Thameslink first with ATO over ETCS". Railway Gazette. 20 March 2018.
  42. "JR West to test ATO on W7 series Shinkansen". International Railway Journal. 25 April 2022. Retrieved 28 April 2022.

Share this article:

This article uses material from the Wikipedia article Automatic_Train_Operation, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.