In 2016, Chairman of Azerbaijan Railways Javid Gurbanov confirmed that work was underway on a 25 km (16 mi) railway line to Heydar Aliyev International Airport from Baku's main station.[3]

In 2018, president Ilham Aliyev announced funding for a suburban rail service for Baku.[4] The 100 million manat project was to include upgrading the existing railway between Baku and Sumqayıt via Biləcəri, as well as bring back into use the disused route connecting the two cities via Sabunçu and Pirşağı. The plans included 23 stations on the route, which would also have branches to Dübandi and Maştağa, with a branch serving the airport being built in a later phase.

The initial phase of the service was launched in May 2019, connecting Baku station with Sabunçu via four intermediate stations.[5][6] By 2020, the line was extended to Sumqayit, linking to the existing Baku–Sumqayit railway to form a circle line.

Stations

ESh2-019 Stadler electric train heading towards Sumqayıt station

At its 2019 opening, the suburban railway served seven stations.[7] In 2020 seven stations were added, bringing the total to 14.[8]

Subway Transfers

More information #, Transfer ...

Future

More information #, Transfer ...

History

The first Elektrichka ran on July 6, 1926, along the Baku–Sabunchi line in Soviet Azerbaijan.

Rolling stock

Current

ESh2-019 (since 2019)

Former

ER9 (1926-2004)

Future plans

13 more stations are planned toward to the East, including Baku International Airport.

A total of 20 passenger railroad stations are planned to be reconstructed / commissioned / built on the Absheron Peninsula by the end of 2027, including the construction of 4 new stations between Balajari Station and Baku Railway Station, AzVision.az reports, referring to the 'Baku city General Plan 2040.

See also


References

  1. "Baku circular railway completed". Railway Gazette. 19 March 2020. Retrieved 16 June 2020.
  2. "Baku suburban railway planned". Railway Gazette. 21 February 2018.
  3. "Suburban railway line being expanded". AzerNews. 28 September 2016.
  4. "Baku suburban railway phase one launched". Railway Gazette. 24 May 2019.
  5. "Abşeron dairəvi dəmir yolu bu gündən etibarən işləyir – Cədvəl". banker.az (in Azerbaijani). 20 March 2020. Retrieved 24 April 2020.

Share this article:

This article uses material from the Wikipedia article Baku_suburban_railway, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.