Callahan_Tunnel

Callahan Tunnel

Callahan Tunnel

Tunnel in Boston


The Lieutenant William F. Callahan Jr. Tunnel (colloquially Callahan Tunnel) is one of four tunnels, and one of three road tunnels, beneath Boston Harbor in Boston, Massachusetts. It carries motor vehicles from the North End to Logan International Airport and Route 1A in East Boston. Ordinarily, this tunnel is only used to carry traffic out of the city, and with the completion of the Big Dig it only collects traffic from I-93 southbound (right after traffic merges from Storrow Drive) and downtown Boston; northbound traffic uses the Ted Williams Tunnel. As of 2016, a toll of $1.50 is charged for non-commercial two-axle vehicles with a Massachusetts E-ZPass, while non-Massachusetts E-ZPass holders are charged $1.75. Vehicles without E-ZPass are charged $2.05 through MassDOT's Pay By Plate MA program. For residents of certain Boston ZIP codes, a discount is in effect using an E-ZPass transponder, costing $0.20.

Quick Facts Overview, Location ...

Alternatives

Traffic flowing between Logan International Airport and directions south of the city on I-93 and west of the city on the Massachusetts Turnpike (I-90) normally uses the Ted Williams Tunnel rather than the Callahan and Sumner Tunnels. Airport traffic can also use East Boston surface roads to and from Chelsea (Chelsea Street Bridge), Revere (Massachusetts Route 1A) and Winthrop (Massachusetts Route 145).

History

Map showing the Callahan Tunnel (in red)

The tunnel was opened in 1961. It was named for the son of Turnpike chairman William F. Callahan, who was killed in Italy days before the end of World War II.

In 2016, cashless tolling systems were installed in both directions, entering the Sumner Tunnel and exiting the Callahan Tunnel as part of a plan to modernize toll collection the Boston area.[2]

Historically, control signals were used to reverse the direction of one lane in this tunnel or the Sumner Tunnel, when the opposite tunnel was closed for maintenance or emergencies. Under the relevant Turnpike regulations, a yellow signal light means "proceed only as directed", on penalty of a $50 fine. As the signals are almost always yellow, this rule is universally ignored by drivers.[citation needed] Other markings in the tunnel include a "double white line" in the center, intended to discourage drivers from changing lanes, to be penalized with a $100 fine.

The Callahan Tunnel was repaired in the 1990s.[3]

A major overhaul began in December 2013, which completely replaced the deck, curbs, and wall panels; and cleaned and repaired its ceiling and vent systems (above the ceiling and below the deck). It was planned for three phases: complete closure from December 27, 2013 to March 12, 2014 during deck and curb replacement; closures 11pm-5am from March 13, 2014 to late August 2014 for wall panel replacement; and final work until November 2014. McCourt Construction of South Boston was awarded the $19.3 million contract in August.[4] During closures, Logan-bound traffic was diverted into the Ted Williams Tunnel, Tobin Bridge, and Massachusetts Route 1A South via Revere or East Boston.[5] Starting with the Accelerated Bridge Program in the late 2000s, MassDOT began employing accelerated construction techniques, in which it signed contracts with incentives for early completion and penalties for late completion, and used intense construction during longer periods of complete closure to shorten the overall project duration and reduce cost.[6] These techniques were also used for the Callahan Tunnel Rehabilitation Project.[5]


References

  1. "Rehabilitation of the Sumner/Callahan Tunnels" (PDF). Concrete Repair Bulletin. International Concrete Repair Institute, Inc. May–June 2002. Archived from the original (PDF) on December 30, 2013. Retrieved May 7, 2013.
  2. "Toll Rates". EZDRIVEMA. Retrieved December 2, 2016.
  3. Hanson, Melissa (December 27, 2013). "Callahan Tunnel closure begins at 11 p.m." Boston Globe. Retrieved December 28, 2013.
  4. Chesto, Jon (November 17, 2013). "Here's what you need to know about the Callahan Tunnel's three-month closure". Boston Business Journal. Retrieved March 31, 2014.
  5. "Callahan Tunnel Rehabilitation Project". Massachusetts Department of Transportation. Archived from the original on December 30, 2013. Retrieved December 30, 2013.
  6. Moran, Jack (May–June 2012). "The Fast 14 Project". Public Roads. 75 (6). United States Federal Highway Administration.

See also

42°22′04″N 71°2′46″W


Share this article:

This article uses material from the Wikipedia article Callahan_Tunnel, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.