Cardiff_City_Line

Cardiff City Line

Cardiff City Line

Commuter railway line in Cardiff, Wales


The Cardiff City Line is a commuter railway line in Cardiff that runs between Radyr and Cardiff Central via Fairwater.

Quick Facts Overview, Owner ...

History

The line was opened by the Taff Vale Railway in 1859, as part of its route from Radyr to the docks at Penarth.[3] Subsequent construction by the TVR added links to Cardiff Central and to the Penarth Extension Railway by 1878. Originally the line was freight-only, but over the years saw regular use for empty passenger trains thanks to its links with the depot at Cardiff Canton TMD and also for football specials to Ninian Park stadium and periodic engineering diversions.[4]

The first regular passenger service was introduced to the line on 5 October 1987, when three new stations were opened at Waun-gron Park, Fairwater and Danescourt, and regular service was introduced to the previously existing Ninian Park station. The new service was introduced by British Rail in co-operation with the Mid Glamorgan and South Glamorgan County Councils.[5]

Services

There are currently trains every half hour which drop to every hour in the evenings on Mondays-Saturdays. There is no Sunday service on the line. Services normally continue to Coryton via the Coryton Line. Transport for Wales currently operates the line as part of the former Valley Lines network. TfW succeeded the previous franchisee Arriva Trains Wales in October 2018. Some freight services also use the line.

The line is also used as a diversionary route for trains serving Merthyr Tydfil, Aberdare and Treherbert when the line between Cardiff Queen Street and Radyr is closed for engineering work. In the past there were shuttle trains on the line to serve Pontypridd and beyond with one stop at Ninian Park.

Trains

TfW operates the line with diesel multiple units of Sprinter classes 150 and 153.

Electrification

On 16 July 2012 the Department for Transport announced plans to electrify the line. This will require new electric multiple unit trains and should reduce journey times, operating costs and maintenance costs. Work was expected to start between 2014 and 2019, but was pushed back to between 2019 and 2024.[6]

The announcement was made as an extension of the electrification of the South Wales Main Line from Cardiff Central to Swansea and the electrification of the south Wales Valley Lines at a total cost of £350 million.[7] This in turn is part of a £9.4 billion investment in railways in England and Wales.[8]

However, these plans have since been replaced by Welsh Government's South Wales Metro. This line has been partially taken over,[9] and is now being electrified.[10]

See also


References

  1. "Impact of Core Valley Lines divestment on the Wales & Western region" (PDF). orr.gov.uk. Retrieved 23 April 2022.
  2. Yonge, John; Padgett, David (August 2010) [1989]. Bridge, Mike (ed.). Railway Track Diagrams 3: Western (5th ed.). Bradford on Avon: Trackmaps. maps 22 & 28B. ISBN 978-0-9549866-6-7.
  3. Grace's Guide – Penarth Dock & Harbour Railway www.gracesguide.co.uk; Retrieved 12 September 2013
  4. Wales Rail – Cardiff City Line www.walesrail.co.uk; Retrieved 12 September 2013
  5. Walters, Laurence (1995). Railways of Cardiff. Ian Allan Ltd. p. 80. ISBN 0-7110-2380-8.
  6. "Cardiff And Valleys Station Upgrades". Network Rail. 16 May 2018. Archived from the original on 17 May 2018. Retrieved 16 May 2018.

Share this article:

This article uses material from the Wikipedia article Cardiff_City_Line, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.