Changping_Line,_Beijing_Subway

Changping line

Changping line

Rapid transit line in Beijing


The Changping Line of the Beijing Subway (Chinese: 北京地铁昌平线; pinyin: běijīng dìtiě chāngpíng xiàn) is a rapid transit line in northern Beijing. It is 43.2 km (26.8 mi)[4] in length with 20 stations (18 stations in operation). Changping line's color is pink.

Quick Facts Overview, Other name(s) ...

Route

The Changping Line runs parallel to, and to the east of, the Badaling Expressway, passing near Shahe and Nanshao.

Stations (North to South)

Service Routes:

  • Regular: Changping Xishankou – Xitucheng
  • Short rush hour: Shahe Univ. Park – Xitucheng
  • Middle rush hour: Changping Dongguan – Xitucheng, with Beishaowa bypassed in the morning (○)
  • Long rush hour (▲△): Qinghe railway station → Changping Xishankou, with some trains bypassing Gonghuacheng; only available in the morning[5]
  • Some trains before or after rush hours, and near the last train: Xitucheng → Zhuxinzhuang, then return to the Dingsilu Depot
More information Service Route, Station Name ...
  1. Zhufangbei station is an infill station that construction started later than other stations on the Southern extension. It is currently under construction and will open in late 2024.
  2. Jimenqiao station is under construction and will open in 2024 with the opening of Line 12.

Opening timeline

The line started construction in 2009. In September 2010, construction of Phase I was completed, and was followed by a three-month test run. Phase I of the line opened on December 30, 2010, and ran north from the Xi'erqi station on Line 13 to Nanshao station.[11] It connects the central Changping District with the Beijing subway network.[12]

On December 26, 2015, Phase II of the line opened, extending the line northwards to the Ming Tombs Scenic Area and terminating at Changping Xishankou station.

On December 31, 2021, the one-station extension to Qinghe railway station opened.

On February 4, 2023, the extension to Xitucheng opened.[4] (Zhufangbei station was not opened)

More information Segment, Commencement ...

Future development

Through service with Line 8

Through service between Line 8 and Changping line via Zhuxinzhuang station is under planning.[16][17]

South extension (section 1) to Jimenqiao

The southern extension to Jimenqiao station is 12.6 km (7.8 mi) in length,[18] including a 0.36 km (0.22 mi) elevated section and a 12.24 km (7.61 mi) underground section.[19] The extension will add 8 underground stations to the line.[18] The one-station extension to Qinghe railway station opened on December 31, 2021, and the section between Qinghe railway station and Xitucheng opened on February 4, 2023, with 5 new stations.[4][15] The opening date of Zhufangbei station and Jimenqiao station (interchange to Line 12) has not been announced yet.

South extension (section 2) to Xueyuannanlu

A further southern extension to Xueyuannanlu is planned. It will interchange with Line 9 and Line 13A at Xueyuannanlu station (formerly known as Mingguangqiaoxi station).[20][21] This extension is still under planning and construction has not started.[22]

History

The stretch of Changping line, south of Gonghuacheng station.

The planned route of the Changping Line was chosen from three alternatives. The other original options placed the southern terminus of the line at the Beijing North railway station, near Line 2 at Xizhimen, or at Huoying, with transfers to Line 8 and Line 13. One original alternative plan set Phase II at 16.7 km (10.4 mi), with one extra station beyond the Ming Tombs.[23]

On January 5, 2009, the Changping District government signed land clearing contracts with townships along routes through Huilongguan, Shahe, and Nanshao, marking the official beginning of Phase I construction.[12] Phase I was set to be completed by the end of 2010, and Phase II was scheduled for completion by 2012.[12]

On September 19, 2010, the line commenced trial running with empty cars.[24]

On December 30, 2010, Phase I of the line entered into operation.

On December 26, 2015, Phase II of the line entered into operation, extending the line north underground for another 5 stations.

On December 31, 2021, a one-station extension to Qinghe railway station opened.

On February 4, 2023, the extension to Xitucheng opened.[4]

Ridership

During rush hours, in 2013, the section between Life Science Park and Xi'erqi Stations was the most congested section in the Beijing subway network, operating at 132% capacity.[25]

Accident

On December 14, 2023, two Changping line trains collided between Xi'erqi station and Life Science Park station, causing one of the carriages broke apart, at least 515 people onboard were injured.[26][27][28][29] The service between Xi'erqi and Zhuxinzhuang station was suspended due to the accident. On December 16, the full service on Changping line resumed.[30]

Rolling stock

More information Model, Image ...

References

  1. "北京地铁再添南北大动脉 昌平线南延". December 11, 2018. Archived from the original on July 27, 2019. Retrieved April 19, 2019.
  2. 北京地铁日客流创纪录 首破1200万大关. Sohu. March 27, 2016. Retrieved March 26, 2016.
  3. 2014年4月30日综合交通总体运行情况. 北京市交通信息中心 北京市交通运行监测调度中心. May 1, 2014. Archived from the original on May 2, 2014. Retrieved May 2, 2014.
  4. "2月4日首班车起昌平线南延一期开通试运营". February 2, 2023. 运营里程9.7公里,开通后将与既有昌平线贯通运营。届时,北京城市轨道交通线路共计27条,运营总里程达807公里
  5. "北京地铁降低满载率 昌平线八通线早晚高峰开行大站快车". Beijing Toutiao. March 24, 2020. Archived from the original on May 8, 2020. Retrieved September 2, 2021.
  6. "昌平线 | 北京地铁官方网站". www.bjsubway.com. Retrieved April 25, 2020.
  7. "北京城市轨道交通线路图". March 17, 2023. Archived from the original on December 15, 2023. Retrieved December 15, 2023.
  8. "地名公告". Archived from the original on June 11, 2022.
  9. "昌平线路网车站站间距信息". Archived from the original on February 8, 2023. Retrieved December 15, 2023.
  10. 本市5条轨道交通线9月完工. Beijing Daily. June 25, 2010. Archived from the original on July 29, 2010. Retrieved July 17, 2010.
  11. 昌平地铁线直通十三陵景区:一期拟设7站拆迁工作已经启动. Beijing Times. January 7, 2009. Archived from the original on October 4, 2010. Retrieved January 7, 2009.
  12. "地铁昌平线南延线进入按图空载试运行". cnr.cn. November 23, 2022. Archived from the original on November 23, 2022. Retrieved November 23, 2022.
  13. "代表建议:高峰期地铁公交执行联乘优惠". January 16, 2023. 下一步,昌平线、8号线也有望贯通运行,为乘客节省换乘时间
  14. "昌平线南延8座新车站5站能换乘". November 6, 2019. Archived from the original on November 8, 2019.
  15. "存档副本". Archived from the original on September 16, 2016. Retrieved August 22, 2016.
  16. "关于尽快启动地铁昌平线南延(蓟门桥至国家图书馆段)工程建设的建议". September 18, 2020. Archived from the original on May 9, 2021. Retrieved May 16, 2022.
  17. 地铁昌平线预计2010年通车 林溪•石溪谷地旁设站. Landlist.cn (in Simplified Chinese). December 26, 2008.
  18. 昌平线试运行40分钟跑全程 (in Simplified Chinese). Beijing Times. Archived from the original on September 30, 2010. Retrieved September 20, 2010.
  19. 我市轨道交通网络化运营效果凸显. Beijing Municipal Transportation Committee (北京市交通委员会). February 7, 2013. Archived from the original on January 9, 2014. Retrieved September 15, 2013.
  20. "北京地铁:北京地铁昌平线突发故障?最新回应". 绍兴网. December 14, 2023. Retrieved December 14, 2023.
  21. "昌平线列车最后两节与前车在西二旗至生命科学园区段发生分离情况,有乘客受伤". 新浪微博. 北京地铁. December 14, 2023. Retrieved December 14, 2023.
  22. "北京地铁昌平线16日起全线恢复正常运营". December 15, 2023. Archived from the original on December 15, 2023.