Cipularang_Toll_Road

Cikampek–Purwakarta–Padalarang Toll Road

Cikampek–Purwakarta–Padalarang Toll Road

Toll Road in Indonesia


06°25′58.78″S 107°25′29.25″E

Quick Facts Route information, Length ...

Cikampek–Purwakarta–Padalarang Toll Road or Cipularang Toll Road is a toll road on Java, Indonesia. Opened in 2005, this road connects the Jakarta–Cikampek Toll Road and the Padaleunyi Toll Road. The toll road is operated by PT Jasa Marga Tbk. The names comes from abbreviation of Cikampek - Purwakarta - Padalarang. This toll road stretches along the mountains so the track is going up and downhill and many bends and bridges.

Exits

More information Province, Location ...

Rest areas

More information KM, Direction ...
Cipularang Toll Road KM 116
Cipularang Toll Road KM 91

Lighting

As this toll road runs along hills that don't have access to electricity, PT Jasa Marga Tbk installs many solar street lights to brighten the road at night. Along KM 104 - 105, many solar street lights are installed on the two lanes of the road. Nevertheless, there are also some electric street lights along the toll road, such as around KM 91 and KM 95.[1]

Road width

Generally, each lane of the toll road has only two rows because of the ground contour. But, in some narrow curves in the road, there is an extra row on the left side of each lane which is used by heavy trucks and buses.


References

  1. Prayogo, Oginawa R. (3 January 2013). P., Djumyati (ed.). "Semua Lampu Tol Jasa Marga akan Pakai Solar Cell". Kontan. Jakarta. Retrieved 16 March 2023.

Share this article:

This article uses material from the Wikipedia article Cipularang_Toll_Road, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.