Damansara_Link

Sprint Expressway

Sprint Expressway

Road in Malaysia


SPRINT Expressway Sprint Expressway(Malay: Sistem Penyuraian Trafik Kuala Lumpur Barat, English: System of Traffic Dispersal in Western Kuala Lumpur) is the main expressway network in Klang Valley, Malaysia. The 26.5 km (16.5 mi) expressway is divided into three sections: the Kerinchi Link, Damansara Link and Penchala Link. It is a three-lane dual carriageway that was built to disperse traffic from congested inner city roads and narrow residential streets leading into Kuala Lumpur from the western suburbs, including Petaling Jaya, Damansara, and surrounding areas. It is one of the busiest expressway during rush hour to and from the city centre.

Quick Facts Expressway 23, Route information ...

Route background

The 11.5 km (7.1 mi) sections from Seputeh Interchange at Federal Highway to NKVE at Jalan Duta. The Kilometre Zero of the Kerinchi Link's section is located at Mont Kiara-NKVE Interchange.

The 9.5 km (5.9 mi) sections from Kayu Ara to Jalan Duta-Semantan Interchange. The Kilometre Zero of the Damansara Link's section is located at Kampung Kayu Ara in Petaling Jaya, Selangor.

The 5.5 km (3.4 mi) sections from Damansara–Puchong Expressway at Penchala, Penchala Tunnel to Mont Kiara. The Kilometre Zero of the Penchala Link's section is located at Mont Kiara Interchange

History

The proposal to build the expressway was motivated by heavy traffic on Jalan Damansara. The concession for the expressway was awarded to Sistem Penyuraian Trafik KL Barat Sdn Bhd (SPRINT). On 23 October 1997, the concession agreement was signed between the Government of Malaysia and Sprint for the privatisation of the improvement, upgrading, design, construction, maintenance, operations, and management of the expressway.

A supplementary agreement was subsequently signed on 4 September 1998 to defer the construction of the Penchala Link. The concession period is for 33 years and commenced on the effective date on 15 December 1998. After this period, the toll collection will cease and the highways will be handed over to the government. Construction began in 1999, which included acquiring and upgrading several major roads, such as Jalan Damansara, Jalan Kayu Ara, Jalan Sri Hartamas, and Jalan Semantan. The Kerinchi Link and Damansara Link were opened in 2001, followed by the Penchala Link in 2004.

This expressway also featured its own toll collection system known as the "FasTrak". On 1 July 2004, the FasTrak electronic payment system was replaced by Touch 'n Go and Smart TAG electronic payment systems.

Pioneer roads

The construction of the SPRINT Expressway included acquiring and upgrading several major roads:

More information Roads, Sections ...
More information Roads, Sections ...

Features

The Damansara Link section of Klang Valley's Sprint Expressway.
A section of the former Damansara Town Centre building as seen from Sprint Expressway's Damansara Link.

The expressway has several notable features:

Controversies and criticisms

The double-deck carriageway design of Kerinchi Link from Bukit Kiara Interchange Exit 2310 to Kerinchi Interchange Exit 2310 was made as a result of the early controversial issues during the development stage. The construction of the stretch took place at the border of Universiti Malaya, which meant that the construction could take up some of the university area, which sparked complaints. As a result, the expressway concessionaire Sprint came up with the idea of a double-deck carriageway which could reduce the land usage.

Damansara Town Centre as the "island" of separated carriageway

During the construction of the expressway, Jalan Semantan could not be widened to six lanes; consequently, the highway concessionaire took another main road at Damansara Town Centre for the Eastbound route, including Jalan Johar and Jalan Beringin. Damansara Town Centre became the "island" of the separated carriageways.

Disputed ramp

When the expressway was opened to the traffic, the 530 m-long two-lane off-ramp from the Northbound direction of Kerinchi Link to Penchala Link at the Mont Kiara Interchange Exit 2303 could not be opened to traffic as a result of a land owner fencing the land which became a part of the ramp. The land owner's action has created difficulties among the residents of Bukit Kiara and Sri Hartamas, and even the highway concessionaire itself.

Meanwhile, the highway concessionaire has made a narrower temporary ramp to Penchala Link but according to the highway concessionaire, the temporary ramp is quite unsafe due to risks of being collided from behind. For the time being, the highway concessionaire is still negotiating with the land owner in order to open the two-lane ramp.[1]

Opening the ramp

At 3pm, 3 June 2010, Works Minister Datuk Shaziman Abu Mansor officially opened this disputed ramp.

Hitherto, road users living in the Mont Kiara and Sri Hartamas areas wanting to go to Jalan Duta, Duta–Ulu Klang Expressway (DUKE) and Penchala Link only had two lanes to use.

"This new ramp will ease the movement of almost 22,000 vehicles per day", he told reporters after opening the ramp.

Shaziman said the 50-metre ramp, which was delayed for seven years owing to problems related to acquisition of land, was completed in five months after the intervention by the Malaysian Prime Minister, Datuk Seri Najib Tun Razak, who had immediately approved about RM20 million for the acquisition of land.

The old SJKC Damansara near Sprint Expressway

The old SJKC Damansara has one block located at Section 17 near Jalan Damansara (now Sprint Expressway). However, on 26 January 2001, the school was moved from old block at Section 17 to the new smart school at PJU 3, near Tropicana Golf and Country Club following the instructions from federal government that it no longer provided a "conducive learning environment" because of traffic congestion and noise pollution from the neighbouring Sprint Expressway.

Tolls

The Sprint Expressway uses open toll systems.

Electronic Toll Collections (ETC)

As part of an initiative to facilitate faster transactions at the Kerinchi Link, Damansara Link and Penchala Link Toll Plazas, all toll transactions at three stretches toll plazas on the Sprint Expressway have been conducted electronically via Touch 'n Go cards or SmartTAGs since 2 March 2016.[2][3]

Toll rates

(As of 15 October 2015)[4][5][6]

More information Class, Type of vehicles ...
More information Class, Type of vehicles ...
More information Class, Type of vehicles ...

List of interchanges

More information km, Exit ...
More information km, Exit ...
More information km, Exit ...

References

  1. Chin, Graham (27 January 2016). "LDP and Sprint tolls to go fully cashless this year".
  2. "SPRINT Toll Fares". litrakgroup.com.my.

Share this article:

This article uses material from the Wikipedia article Damansara_Link, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.