Eastern_Harbour_Crossing

Eastern Harbour Crossing

Eastern Harbour Crossing

Tunnel crossing Victoria Harbour, Hong Kong


The Eastern Harbour Crossing, abbreviated as "EHC" (Chinese: 東隧), is a combined road-rail tunnel that crosses beneath Victoria Harbour in Hong Kong. Opened on 21 September 1989, it connects Quarry Bay, Hong Kong Island and Cha Kwo Ling, Kowloon East.

Quick Facts Overview, Location ...
Quick Facts Major junctions, West end ...
Quick Facts Traditional Chinese, Simplified Chinese ...

History

Initially, the Government of Hong Kong had planned to build a bridge across the eastern portion of the harbor but due to fears of it blocking planes landing Kai Tak airport, this was shelved in favour of a tunnel.

In 1986, the government gave New Hong Kong Tunnel the right to run the tunnel on a 30-year franchisee with the lease expiring in August 2016.[citation needed] The tunnel features two components, a road part and a rail part:

  • The road part of the tunnel is branded by the operator as the Eastern Harbour Tunnel, although the government refers to the tunnel itself as the Eastern Harbour Crossing. The tunnel is governed by the Eastern Harbour Crossing Ordinance. The road part links the Island Eastern Corridor in Hong Kong Island, Lei Yue Mun Road, Tseung Kwan O Tunnel, Tseung Kwan O——Lam Tin Tunnel and the Kwun Tong Bypass in Kowloon East.
  • The rail part, lying to the southeast of the road part, runs between Quarry Bay and Yau Tong stations of the MTR Tseung Kwan O line.

The Chinese investment group CITIC Pacific has an interestin[clarification needed] both parts, controlling the road part (71% stake) and has[needs update] a 50% stake in the rail part. CITIC also controls 50% of the Western Harbour Tunnel Company.

Tunnel tolls

Tolls are collected manually or electronically in both directions at the toll plaza on the Cha Kwo Ling side.

More information Category, Vehicle ...

Notes

  1. As of 4 November 2012

Interchanges

Eastern Harbour Crossing
Westbound exits Exit number Eastbound exits
End of Route 2
intersects with Island Eastern Corridor
End Eastern Harbour Crossing Start Eastern Harbour Crossing
Tai Koo Shing,Sai Wan Ho, Shau Kei Wan, Chai Wan,Siu Sai Wan, Stanley, Shek O
Island Eastern Corridor
1A no exit
Quarry Bay, North Point, Causeway Bay, Happy Valley, Aberdeen
Island Eastern Corridor
1B no exit
no exit 1C Tseung Kwan O, Lam Tin Interchange
Tseung Lam Highway
Eastern Harbour Crossing
Start Eastern Harbour Crossing End Eastern Harbour Crossing
continues as Lei Yue Mun Road

Traffic

As of 2018, there are 46 bus routes passing through the tunnel.

Controversies

In June 2005, CITIC decided to raise the toll for using Eastern Harbour Crossing from HK$15 to HK$25 for private vehicles and up to 67% for other classes of vehicles, under the fare adjustment mechanism derived from the build-operate-transfer (BOT) model.[3] This increase aroused criticisms that the model was detrimental to the public interest, with the increase shifting more traffic to the already congested Cross-Harbour Tunnel.

See also


References

  1. "Transport in Hong Kong – Tunnels and Bridges". Transport Department of the Government of Hong Kong. Archived from the original on 10 March 2021. Retrieved 29 October 2012.
  2. "Transport Department Tunnels and Bridges". Transport Department of the Government of Hong Kong. Archived from the original on 11 January 2013. Retrieved 3 November 2012.
  3. Ng, Dennis (4 May 2005). "Toll hike ignites call for government to take control". The Standard. Archived from the original on 16 October 2007. Retrieved 27 October 2006.
Preceded by
Southern Terminus
Hong Kong Route 2

Eastern Harbour Crossing
Succeeded by
Lei Yue Mun Road

Share this article:

This article uses material from the Wikipedia article Eastern_Harbour_Crossing, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.