Energinet

Energinet

Energinet

Danish energy company


Energinet is the Danish national transmission system operator for electricity and natural gas. It is an independent public enterprise owned by the Danish state under the Ministry of Climate and Energy.[1] Energinet has some 1150 employees, and its headquarters are located in Erritsø near Fredericia in Jutland. The gas division is located in Ballerup near Copenhagen.

Quick Facts Company type, Industry ...

The main tasks are to ensure efficient operation and development of the national electricity and gas infrastructure as well as ensuring equal access for all users of the infrastructure.[2]

History

Energinet was created by a merger of power grid operators Eltra, Elkraft System and Elkraft Transmission, and by natural gas transmission system operator Gastra.[3] The merger took place on 24 August 2005 with retrospective effect from 1 January 2005.

Eltra owned the electricity transmission network west of the Great Belt and was system operator there.[4] It was owned by 44 network companies there. [5] To the east of the Great Belt there were two companies: the system operator Elkraft System and the transmission network company Elkraft Transmission.[4][6] They formed a joint organization and were owned by NESANET A/S [dk], KE Forsyningen, SEAS Transmission A/S [dk], NVE Net A/S [dk], Frederiksberg Elnet A/S, Hillerød Elforsyning, Helsingør Elforsyning, Roskilde Netvirksomhed, Nykøbing Sjællands El-Net and SK-Net A/S.[7]

Operations

Quick Facts External image ...

Energinet operates the 400 kV electricity transmission grid[8] and the gas transmission grid.[9] The company owns and operates also 132 kV[10] and 150 kV power grids ("Regionale Net") and the HVDC Great Belt Power Link, and it is a co-owner of the power interconnections with Sweden (Konti–Skan), Norway (Cross-Skagerrak) and Germany (Kontek).[11][12][13] A 700MW submarine power cable called COBRAcable to the Netherlands is planned with TenneT,[14][15] and a 1,400MW cable (Viking Link in 2022) to Britain is investigated with National Grid, expected to cost DKK 15 billion.[16][17] Cobra and Viking were put on the EU "Projects of Common Interest" list in November 2015, along with the Krieger offshore wind turbine cable to Germany.[18] Of the high voltage power lines on land, 25% were laid as underground cables in 2014.[19]

Energinet has a 20% stake in Nord Pool Spot AS (the largest electricity market in the world),[20] and, as of December 2012, 100% of the physical gas exchange Nord Pool Gas A/S.[21] It also owns a fiber-optic communication network and a gas storage facility, as well as a 20% stake[12] in European Market Coupling Company, a Central-West European cross-border electrical power trading joint venture due to begin operations on 9 November 2010.[22]

An electrical consumption support scheme dedicated to sustainable electricity producers in Denmark is administered by Energinet.[23]

See also


References

  1. "Experience of the Danish Transmission System Operator" (PDF). International Energy Agency. Archived from the original (PDF) on 24 September 2015. Retrieved 11 February 2010.
  2. "Natural gas in exact quantities". Force Technology. Archived from the original on 2007-05-13. Retrieved 24 June 2008.
  3. "Nyhedsbrev" (PDF). Retrieved 2 June 2020.
  4. "Elkraft 2003" (PDF). Retrieved 2 June 2020.
  5. Nielsen, Torben Glar (15 September 2010). "Electricity Division". Energinet. Archived from the original on 2 November 2010. Retrieved 3 October 2010.
  6. Hodal, Peter A. (15 September 2010). "Gas Division". Energinet. Archived from the original on 2 November 2010. Retrieved 3 October 2010.
  7. "DONG Energy Sells Transmission Network to Energinet". OilVoice. 2007-12-24. Retrieved 2010-10-03.
  8. "Energinet SOV". Business Week. Archived from the original on March 30, 2009. Retrieved 11 February 2010.
  9. Røge, Anne Cecilie Nesager (15 September 2010). "The Energinet Group". Energinet. Archived from the original on 30 October 2010. Retrieved 3 October 2010.
  10. Gellert, Bjarne Christian. Electricity interconnections Archived 2013-02-09 at the Wayback Machine Energinet, 22 August 2011. Accessed: 6 December 2011.
  11. Torben Glar Nielsen. "Energinet has approved the business case for Cobra cable Archived 2014-02-04 at the Wayback Machine" Energinet, 13 January 2014. Accessed: 20 January 2014.
  12. Isobel Rowley & Jesper N. Rasmussen. "National Grid and Energinet sign cooperation agreement on a first electricity interconnector between UK and Denmark Archived 2014-02-04 at the Wayback Machine" Energinet, 10 October 2013. Accessed: 10 October 2013.
  13. Wittrup, Sanne. "740 kilometer elkabel skal sende dansk strøm til England" Ingeniøren, 28 September 2015. Accessed: 28 September 2015. Overview of power connections Archived 2015-10-04 at the Wayback Machine
  14. Wittrup, Sanne. "Så er alle de mindre luftledninger lagt i jorden" Ingeniøren, 19 December 2014. Accessed: 21 December 2014.
  15. "Nord Pool - Organisation". Nord Pool ASA. Retrieved 24 June 2008. [dead link]
  16. "Nord Pool Spot sells its 50% shares of Nord Pool Gas to Energinet". Energinet. Archived from the original on 27 September 2013. Retrieved 25 September 2013.
  17. Confirmation of launch date Archived 2011-07-14 at the Wayback Machine European Market Coupling Company, 24 September 2010. Retrieved: 3 October 2010.

Share this article:

This article uses material from the Wikipedia article Energinet, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.