Grayling_Bicycle_Turnpike

Grayling Bicycle Turnpike

Grayling Bicycle Turnpike

Paved trailway in Michigan, United States


The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue.

Quick Facts Length, Location ...

The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda.

44.7098°N 84.70997°W / 44.7098; -84.70997



Share this article:

This article uses material from the Wikipedia article Grayling_Bicycle_Turnpike, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.