Gulf Refinery, Milford Haven

Gulf Refinery, Milford Haven

Add article description


The Gulf Refinery at Milford Haven was an oil refinery situated on the Pembrokeshire coast in Wales. The refinery, originally owned and operated by Gulf Oil, was opened in August 1968 by Queen Elizabeth II.[1] The plant, constructed at a cost of approximately £35 million, produced a range of petroleum products and occupied an area of 300 acres (121.4 ha).[2] It was initially designed to process 60,000 barrels of crude oil per day (3 million tonnes per year).[3] The capacity was increased to 119,000 barrels (18,900 m3) a day of oil.[4]

Quick Facts Country, City ...

Oil import

Gulf Oil's crude oil was principally obtained from Nigeria and Kuwait through joint ventures with BP.[5] Crude was shipped to Bantry Bay in Ireland in 312,000 DWT (deadweight ton) ships. The Bantry Bay facility had a storage capacity of one million tonnes. It was commissioned just before the refinery opened at a cost of £13m.[3] From Bantry Bay crude oil was shipped in 100,000 DWT ships to Gulf's refineries in Milford Haven, Denmark and Rotterdam.[5]

Operations

The Milford Haven refinery was integrated with two petro-chemical plants, using oil products from the refinery as feed-stock. One produced 50,000 tonnes a year of benzene and the other 100,000 tonnes a year of cyclohexane.[3] The refinery employed about 280 people.[5] About 23 per cent of the refinery output was exported by train via a rail link to the national rail network. About 75 per cent of the output was exported by ship.[5]

Gulf Oil's refinery also supplied fuel oil to the nearby oil-fired 2,000 MW Pembroke power station (commissioned in 1968).[5]

The refining distillation capacity over the operational life of the refinery was as follows.[6][7]

More information Year, Capacity (million tonnes per year) ...

Owners

Gulf Oil merged with Standard Oil of California (SOCAL) in 1985 with both rebranded as Chevron.

Closure

The refinery closed down in December 1997, as part of plans by the Chevron Corporation, by then the owners of Gulf Oil, to withdraw from the downstream oil business in the UK.[8] Today, the site is occupied by the Valero Pembrokeshire Oil Terminal (VPOT) and the Dragon LNG terminal.[9]

See also


References

  1. "The Oil Industry in Pembrokeshire: Topic List". Pembrokeshire County Council. p. 7.
  2. Spiegelberg, Richard (9 August 1968). "New Welsh refinery is vital link for Gulf". The Times. p. 19.
  3. "CHEVRON TO SELL BRITISH REFINERY AND STATIONS TO SHELL". The New York Times Company. 22 August 1997.
  4. Watts, D.G. (January 1970). "Milford Haven and its Oil Industry, 1958-69". Geography. 55 (1): 64–72 via JSTOR.
  5. Vielvoye, Roger (19 November 1973). "Massive build-up of oil refinery capacity". The Times.
  6. Energy Institute, United Kingdom refining distillation capacity, EI Datasheet 07, January 2019
  7. "Dragon LNG Company History". Archived from the original on 24 June 2009. Retrieved 29 July 2009.