IRNSS-1D

IRNSS-1D

IRNSS-1D is a satellite in the Indian Regional Navigational Satellite System (IRNSS) constellation. The satellite is the fourth of seven in the constellation, launched after IRNSS-1A, IRNSS-1B and IRNSS-1C. The satellite is the only satellite in the constellation slated to provide navigational services to the region. The satellite will be placed in geosynchronous orbit.[4] It was launched successfully on 28 March 2015 onboard ISRO's PSLV-C27 from Satish Dhawan Space Centre, Sriharikota.[5][6][7]

Quick Facts Mission type, Operator ...

Satellite

The satellite will help in augmenting the satellite based navigation system of India which is currently under development. The navigational system so developed will be a regional one targeted towards South Asia. The satellite will provide navigation, tracking and mapping services.[8]

IRNSS-1D satellite has two payloads: a navigation payload and CDMA ranging payload in addition with a laser retro-reflector. The payload generates navigation signals at L5 and S-band. The design of the payload makes the IRNSS system inter-operable and compatible with Global Positioning System (GPS) and Galileo.[4] The satellite is powered by two solar arrays, which generate power up to 1,660 watts, and has a life-time of ten years.

Cost

The total cost of the mission was estimated at 14 billion.[9]

See also


References

  1. Graham, William (28 March 2015). "PSLV launches with IRNSS-1D to open India's 2015 campaign". NASASpaceflight.com. Retrieved 28 March 2015.
  2. "PSLV-C27/IRNSS-1D Mission". ISRO. Archived from the original on 25 February 2015. Retrieved 2 March 2015.
  3. "IRNSS 1D Satellite details 2015-018A NORAD 40547". N2YO. 10 May 2015. Retrieved 10 May 2015.
  4. "IRNSS". space.skyrocket.de. Retrieved 6 December 2014.
  5. "ISRO puts India's Navigation satellite IRNSS 1B into orbit". IANS. news.biharprabha.com. Retrieved 4 April 2014.
  6. "IRNSS 1-D launch put off". India. thehindu.com. 4 March 2015. Retrieved 4 March 2015.
  7. "ISRO: After GSLV launch, PSLV C24 with IRNSS-1B likely in March". India. 5 January 2014. Retrieved 6 January 2014.
  8. Dennis S. Jesudasan (March 2015). "Countdown to IRNSS 1D on March 7". The Hindu. Retrieved 28 March 2015.

Share this article:

This article uses material from the Wikipedia article IRNSS-1D, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.