The State Railways Institution (Spanish: Instituto de Ferrocarriles del Estado, or IFE) is a state-run organization of Venezuela that manages the railway systems of the country. Its headquarters are located in Caracas, Venezuela.

Venezuela railways: planned mainly unbuilt sections of the railway network before 1999

According to the 1999 Constitution, its renovation is a national priority. The new infrastructure which has been added includes the first new above-ground train line constructed in Venezuela for more than 70 years, the Ezequiel Zamora Mass Transportation System. Named after the soldier Ezequiel Zamora, it was inaugurated on October 15, 2006, by President Hugo Chávez.

History

Historically, much of the original Venezuelan network was designed in the 19th century in the Federalist period and under the administration of Antonio Guzmán Blanco, in order to open up the country for trade and earn foreign revenues. However, the first licenses were signed and revoked nine times before the first stretch was operating.[citation needed]

Two of the first lines connected Caracas to its port of La Guaira (the La Guaira and Caracas Railway) and to Valencia (the Great Venezuela Railway) in the 1880s. Notable engineers associated with its original development include: John Grover and Robert Fairlie. Some of the later lines were designed by William A. Welch and Thomas Kavanagh (Caracas subway).

Rail transport in Venezuela was neglected and went into a major decline from the 1950s, with bus and road transport taking its place, just Caracas maintaining its 51 km (32 mi) of subway system and local railway.

In 1975 was devised by the "Instituto Ferrocarriles del Estado" (IFE) a National Plan Ferrocarrilero[1] that began in Maracaibo and reached Barquisimeto-Puerto Cabello-Valencia-Caracas-Cua, following from Cua to Barcelona and Ciudad Bolivar-Ciudad Guayana. The company "Saprolate-Tranarg" made all aerial photographic surveys and the Plan was approved by the then President Luis Herrera Campins, but in the 1980s the Plan IFE was blocked for economic reasons after the devaluation of the Bolivar in 1983 and then was finally canceled with the Caracazo of 1989. Only the section Caracas-Cúa was maintained as a budgeted project (and was made, being inaugurated in 2006 by President Hugo Chavez) .

The 1999 constitution was a signal for a major reinvestment in the infrastructure of the state. Much of the renovation of the current Venezuelan railway network is still at the planning stage, with some already constructed and the rest to be built over a period of about 30 years.

Railway network

Map based on IFE maps[2] of lines operating (purple), lines being restored (blue) and lines under construction (green) as at 2017

The Venezuelan network includes 682 km (424 mi) of rail in standard gauge.[3] The network covers the populated and production areas in the country, and is managed by IFE under various Regional Development Plans. There are also connections between Colombia and Brazil that link to the other countries of South America, although traffic in the border areas are affected by foreign policy and defence strategy.

IFE is the sole operator of trains in Venezuela, however, they have created various railway names assigned to different regions throughout the country.

More information Railway, Branch ...

Operational

Fully Updated

Caracas – Cúa branch

Train leaves General Ezequiel Zamora Station, Cúa.

After 70 years without major improvements to the Venezuelan railway system, the Caracas – Cúa line was opened for public service on October 15, 2006. The route is part of the projected Ezequiel Zamora railway axis. It starts from Caracas and ends in Cúa, Miranda State. The main terminal is located next to the Caracas Metro (subway) line 3 La Rinconada Terminal Station. This short North-South line can be passenger travelled in approximately, 30 minutes. The following are the names of the 4 stations and the estimated travel time from Caracas and then the additional time to the next station. Also there is a delay time before the train restarts the trip which can be adjusted by management policy.

More information Station, Location ...

Modernization/reconstruction

Puerto Cabello – Yaritagua – Barquisimeto branch

The main branch of the Simón Bolívar railway axis is a 177 km (110 mi) east–west line where a full upgrade/restoration was planned with a projected completion date of 2010.[needs update] This line connects Carabobo State, Yaracuy State and Lara State. The stations are as follows:

  • Puerto Cabello, Carabobo State;
  • Morón, Carabobo State;
  • San Felipe, Yaracuy State;
  • Urama, Yaracuy State;
  • Chivacoa, Yaracuy State;
  • Yaritagua, Yaracuy State and;
  • Barquisimeto, Lara State.

Yaritagua – Acarigua branch

Another branch of the Simón Bolívar railway axis is a 113 km (70 mi) north–south line connection between the Yaritagua, Yaracuy State, Acarigua, Portuguesa State where a full upgrade restoration is in progress.

San Juan de los Morros – San Fernando de Apure branch

A 252 km (157 mi) north–south line where a full upgrade/restoration was originally projected for completion by the end of 2010. This line was supposed to connect Guárico State and Apure State.

Services

The railway provides both freight and passenger service.

Freight

Between Puerto Cabello and Barquisimeto movement of loads over 3 million tons per month have been exceeded.

More information Branch, Period ...

Passenger

Cúa Station, Commuter short distance Train

As of July 16, 2007, passenger service is provided only between the stations on the Caracas – Cúa Branch. The following table shows the train schedule:

More information Branch, Period ...

All times are subject to change depending on special events, system improvements and the decisions the managers may make. In 2023, in response to growing demand, the IFE gave in to pressure and finally introduced Sunday services.

Construction

Work in progress

Puerto Cabello – La Encrucijada branch

Another part of the Ezequiel Zamora railway axis has 108 km (67 mi) under construction between the sea port city of Puerto Cabello, Carabobo State, and the crossroads town of La Encrucijada, Aragua State. The line is predominately east–west, although between the station at Naguanagua and the terminus at Puerto Cabello the route changes to a north–south direction.

14 tunnels including the 7.8 km (4.8 mi) Bárbula Tunnel (the longest in South America) and many bridges are required to connect between the various stations along this line. The project is behind schedule. In 2016 work on the Puerto Cabello railway was described as "irregular and marked by slow payments by the client as a result of the country’s poor economic conditions, mainly related to the drop in the price of oil." [31]

The new stations under construction are found in:

  • La Encrucijada, Aragua State; the hub in La Encrucijada will provide easy access to the users from Cagua, Aragua State.
  • Maracay, Aragua State;
  • Mariara, Carabobo State;
  • San Joaquín, Carabobo State
    • San Diego, Carabobo State*
    • Naguanagua, Carabobo State*
  • Puerto Cabello, Carabobo State

(*)These two are suburban cities of Valencia.

Chaguaramas – Las Mercedes – Cabruta – Caicara del Orinoco branch

Another branch north–south line 201 km (125 mi) found mainly in Guarico State that will cross the Orinoco River and enter the Bolívar State.

Maracaibo – Sabana de Mendoza branch

This 233 km (145 mi) will start in the capital city of Maracaibo Zulia State nearby the Maracaibo Metro (subway) station. The line will cross the mouth of Lake Maracaibo in a combination tunnel/bridge under construction in an east–west direction and after the El Tablazo stop the line follows a north-north-west to south-south-east direction. The stations are as follows:

  • Maracaibo, Zulia State;
  • El Tablazo, Zulia State;
  • Santa Rita State;
  • Cabimas, Zulia State;
  • Ciudad Ojeda, Zulia State;
  • Lagunillas, Zulia State;
  • Bachaquero, Zulia State;
  • Mene Grande, Zulia State;
  • Sabana de Mendoza, Trujillo State.

Puerto Ordaz – Maturín – Manicuare branch

This 320 km (199 mi) route will start from Ciudad Guyana Bolívar State, the Puerto Ordaz section and cross the Orinoco River to go south–north to reach Maturín, Monagas State and continue till it reaches the Sucre State where the line will run east–west until it reaches the deep sea water port of Manicuare.

Acarigua – Turén branch

The completion of an extension of the Simón Bolívar railway axis is a 45 km (28 mi) north–south line connection between Acarigua, and Turén.

Tinaco – Anaco branch

The first phase 468 km (291 mi) is part of the North Llanero railway axis (northern plains) an east–west line that would provide service to the following cities/towns:

and work was to be completed by 2012.

As part of a National Rail Development Plan, the standard gauge Tinaco-Anaco railway,[32] was inaugurated with Chinese funding in 2009.[citation needed]

About a fifth of the work had been done by 2012.[32] However, it appears construction stalled in 2013,[33] though the route remains on the State Railways Institution's map of railways under construction .[34]

Parque Recreacional - El Encanto branch

Railroad reconstruction (July 21, 2007)

This 7 km long branch independent of all other rail systems is for recreational purposes only. Mainly is to provide entertainment for tourists, these enchanted sights must be viewed by all. Originally this summit section was part of the Great Venezuela Railway (180 km in length) built in 1909 and operated until after 1937. If all goes well this will be available to the public in 2012.[needs update]

Work began in 2015 on a 350 million bolivar plan to restore the 7 km (4.3 mi) of track, with 7 tunnels and 5 bridges, to provide a 25-minute journey from Los Lagos to El Encanto.[35]

Planning/design stage

La Encrucijada – Cúa branch

The completion of the connection from La Encrucijada to the Tuy Valley will be made at a later date.

Sabana de Mendoza – Barquisimeto branch

A follow-up future east–west phase will connect Sabana de Mendoza with Barquisimeto Lara State.

San Juan de Los Morros – La Encrucijada branch

Future expansion includes a north–south connection between San Juan de Los Morros and La Encrucijada Station.

Anaco – Maturín branch

A separate phase for the North Llanero railway axis to be constructed at a later date will connect in an east–west direction Maturín Monagas State with Anaco Anzoátegui State.

Tinaco – San Cristóbal branch

The full 1,100 km (684 mi) route, the North Llanero railway axis will be completed at a later date and will add services among the additional following cities:

Caicara – Puerto Ayacucho branch

This north–south branch will connect Bolívar State to Amazonas State although a possible alternative would be to join San Fernando de Apure to Puerto Ayacucho.

San Fernando de Apure – Ciudad Bolívar – Ciudad Guayana – Tucupita branch

This east–west route will connect Apure State, Guarico State, Bolivar State, Anzoategui State, Monagas State and Delta Amacuro State. Also this line will have stops in Cabruta and Caicara.

Caracas – La Guaira branch

This dominately north–south route 50 km (31.1 mi) joining Federal District to Vargas State will provide access to and from Caracas and its International/National Airports and one of its major Seaports.

  • Caracas (La Rinconada)
  • Maiquetía Airport
  • La Guaira Seaport

Completion of this line is expected within five years after fund approval.

There are no rail links to adjacent countries.

See also


References

  1. "Map "Plan Ferrocarrilero 1975"".
  2. "Rail: Caracas – Tuy Medio Electrification project". Archived from the original on 2011-01-21. Retrieved 2012-04-10.
  3. "Inelectra". www.inelectra.com. Archived from the original on 2013-06-04. Retrieved 2012-04-14.
  4. "Damage setback". Archived from the original on 2009-01-05. Retrieved 2019-04-07.
  5. "Construction follows closely to Original Plans". Archived from the original on 2013-09-21. Retrieved 2012-04-14.
  6. "Salini Impregilo beats targets - KHL Group". www.khl.com. Retrieved 2017-01-07.
  7. "Newspaper (Spanish)". 3 November 2023.
  8. [needs update]"Corpolara culminará puente ferroviario de Barquisimeto en el primer trimestre de 2017". VTV (in European Spanish). 2016-11-14. Archived from the original on 2017-01-08. Retrieved 2017-01-07.
  9. Toro, Francisco (22 February 2012). "Chávez's Great Train Robbery".
  10. "Astaldi". 18 July 2016.
  11. Guthrie (2016). "Salini Impregilo beats targets - KHL Group". www.khl.com. Retrieved 2019-04-27.
  12. "Tinaco-Anaco Railway Line". Railway Technology. Retrieved 2017-01-07.