Interstate 71 (I-71) is a north–south Interstate Highway in the midwestern and southeastern regions of the United States. Its southern terminus is at an interchange with I-64 and I-65 (the Kennedy Interchange) in Louisville, Kentucky, and its northern terminus at an interchange with I-90 in Cleveland, Ohio. I-71 runs concurrently with I-75 from a point about 20 miles (32 km) south of Cincinnati, Ohio, into Downtown Cincinnati. While most odd numbered Interstates run north–south, I-71 takes more of a northeast–southwest course, with some east–west sections, and is mainly a regional route serving Kentucky and Ohio. It links I-80 and I-90 to I-70 and ultimately (via I-65) links to I-40. Major metropolitan areas served by I-71 include Louisville, Cincinnati, Columbus, and Cleveland.

Quick Facts Route information, Length ...

Approximately three-quarters of the route lie east of I-75, leaving I-71 out of place in the Interstate grid.

Route description

More information mi, km ...

Kentucky

Southern end of I-71 in Downtown Louisville, Kentucky
I-71 in Carroll County, Kentucky
I-71 (and I-75) heading northbound into Cincinnati, Ohio, from Kentucky

In Kentucky, I-71 begins east of Downtown Louisville at the Kennedy Interchange, where it meets I-64 and I-65. This interchange is sometimes called the "Spaghetti Junction". From Louisville, it roughly follows the Ohio River in a diagonal path toward Northern Kentucky. Between Louisville and Cincinnati, I-71 is largely a four-lane highway, except for the approach to Kentucky Speedway in Sparta in which it runs three lanes each way for about two miles (3.2 km).

Near the town of Carrollton, there are signs marking the location of a tragic accident that occurred on May 14, 1988, when a drunk driver was driving north in the southbound lanes and struck a church bus full of children and teenagers, causing the bus's fuel tank to ignite into flames and killing 27 people on board. It is one of the worst bus accidents in state and national history.

After having run 77 miles (124 km) from Louisville, I-71 merges with I-75 near Walton after which it intersects I-275, the Cincinnati beltway. After passing through Covington, the freeway crosses the Ohio River via the lower level of the Brent Spence Bridge (while the southbound direction uses the upper level) and continues into Cincinnati.

Ohio

Heading northbound into Columbus, Ohio
Northern terminus at I-90 in Downtown Cleveland, Ohio

In Cincinnati, it splits immediately from I-75 and heads due east onto Fort Washington Way, where it continues through Downtown Cincinnati concurrently with U.S. Route 50 (US 50) for less than one mile (1.6 km). Just east of downtown, US 50 splits from I-71 and continues east; I-71 bends north and receives I-471, a spur from southeast of the city. I-71 then heads in a general northeast direction through urban Cincinnati and into its surrounding suburbs. After another interchange with the I-275 beltway, the freeway leaves the metropolitan area and heads toward Columbus. It continues northeast until it reaches South Lebanon, where it begins cutting east across the flat plains of southwest Ohio. The freeway crosses the Little Miami River on the Jeremiah Morrow Bridge, which is a continuous truss bridge and the tallest bridge in Ohio, at 239 feet (73 m) above the river. I-71 heads toward Columbus then intersects with the bypass I-270 before heading north into urban Columbus, where it junctions I-70. About a mile (1.6 km) north of the I-70 junction, it intersects with I-670. After another interchange with the I-270 bypass, the highway exits Columbus and continues north until near Delaware, where it again turns northeast. Beginning its path to Cleveland, I-71 enters the rolling farm country on the edges of the Allegheny Plateau. It continues in this fashion to LodiWestfield Center and its junction with I-76, which provides access to Akron and points east. Heading north to Medina, it meets the terminus of I-271. The highway then continues north into urban Cuyahoga County and Cleveland's suburbs, intersecting the Ohio Turnpike/I-80. Passing Cleveland Hopkins International Airport, I-71 meets I-480 and enters Cleveland's west side, continuing on to downtown. It junctions with State Route 176 (SR 176) and terminates at I-90 on the Innerbelt.

History

1957 versions of the Interstate Highway marker for Kentucky and Ohio

Kentucky

The first section of I-71 in Louisville opened in December 1966 between its terminus at Spaghetti Junction and Zorn Avenue, its first exit. Its junction with I-264 opened in July 1968, and the complete Kentucky portion of the Interstate was opened to the public in July 1969. At that point, it replaced US 42 as the primary link between Cincinnati and Louisville.[2]

Ohio

Much of I-71 in Ohio was intended to be SR 1. SR 1 was originally planned in the 1950s as a second Ohio Turnpike extending southwest to northeast across the state. It was planned to run from Cincinnati to Conneaut and connect with an extension built across the panhandle of Pennsylvania to the New York State Thruway. As the highway was being planned, the Federal-Aid Highway Act of 1956 was enacted, and the project was converted from a toll road to a freeway. It was designated as SR 1, since the Interstate Highway numbering system had not yet been implemented. Portions of the freeway began to be completed and opened in 1959 with the new Interstate Highway funding, and they were marked as SR 1 as well as with their new Interstate Highway number. Since large gaps existed along the corridor where no freeway had yet been completed, existing two-lane or four-lane highways were also designated as SR 1 in order to complete the route. The SR 1 signage was removed in 1966 as the Interstate Highway numbers adequately marked the route by then and the state highway numbering was superfluous.

Columbus-area highway marker designating I-71 and SR 1 (1965)

In Columbus, the portion of I-71 that bounds Worthington's eastern edge was originally called the North Freeway. Costing $13.8 million (equivalent to $106 million in 2023[3]), it was constructed south from SR 161, arriving at 11th Avenue by August 1961. It took another year to construct the portion between 11th and 5th avenues, mainly due to the need to construct a massive underpass under the Pennsylvania Railroad's Grogan Yard. Today, only two tracks cross the viaduct, and the rest of the structure supports a large, weedy field. By August 1962, the freeway had reached Fifth Avenue, and it reached downtown in November 1962.

I-71 was originally planned to follow the Innerbelt Freeway northward from its current northern terminus to the Cleveland Memorial Shoreway at Dead Man's Curve when I-90 was planned to continue westward from there along the Shoreway.[4]

Upon its completion, I-71 replaced SR 3 as the primary highway link between Cincinnati, Columbus, and Cleveland.

Between 2004 and 2006, the interchange at milepost 121 in the far northern reaches of Columbus was reconstructed to allow access to the eastern extension of Gemini Place.[5] Before that, it was a simple diamond interchange with SR 750 (Polaris Parkway).

Rebuilding and widening program

In 1999, the state of Ohio began a 10-year, $500-million (equivalent to $860 million in 2023[3]) project to improve I-71 between Columbus and Cleveland. The plans did not include widening the 25-mile (40 km) stretch in Delaware and Morrow counties, calling for patching that section instead. At that time, state transportation officials said they did not plan to widen that section for two reasons: traffic studies did not support the widening and there was no money for the project.[6] But Ohio Department of Transportation (ODOT) officials eventually gave in under pressure from elected officials and business owners to widen the remaining 25-mile (40 km) stretch of I-71 from just north of the US 36/SR 37 interchange in Delaware County to the Morrow–Richland county line.[7] The reconstruction and widening on the last 25-mile (40 km) stretch of I-71 in Delaware and Morrow counties began in early 2012, and the work was completed in mid-2015 at a cost of $144 million (equivalent to $181 million in 2023[3]).[7]

Exit list

More information State, County ...

Auxiliary routes

I-71 has two auxiliary routes in Greater Cleveland and the Cincinnati metropolitan area. I-471 links Downtown Cincinnati with I-275. I-271 provides access to Cleveland's eastern suburbs and enables travelers on I-71 to access I-90 east without going through Cleveland proper.

See also


References

  1. Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Archived from the original on September 20, 2023. Retrieved January 9, 2024.
  2. Kleber, John E., ed. (2001). "Interstates and Expressways". Encyclopedia of Louisville. Lexington: University Press of Kentucky. pp. 417–418. ISBN 0813128900. Archived from the original on January 28, 2024. Retrieved October 18, 2020.
  3. Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  4. Ohio Department of Highways. 1957–1958 Biennial Report (Excerpt). Ohio Department of Highways. Archived from the original on September 24, 2015. Retrieved February 27, 2013 via Roadfan.com.
  5. urbanohio.com. "Ohio Fuses Two Interchanges in Columbus". Archived from the original on June 15, 2015. Retrieved June 14, 2015.[self-published source]
  6. Ferenchik, Mark (February 26, 2013). "3rd lane coming to I-71 by 2015". The Columbus Dispatch. Archived from the original on October 7, 2014. Retrieved October 4, 2014.
  7. Hill, Todd (October 13, 2014). "I-71 widening almost finished". Mansfield News Journal. Archived from the original on June 20, 2015. Retrieved June 19, 2015.
  8. "HIS Expanded Milepoint Route Log Extract". Kentucky Transportation Cabinet. October 31, 2007. Archived from the original on November 9, 2007. Retrieved April 15, 2022.
  9. Office of Technical Services (January 1, 2007). "Straight Line Diagrams". Ohio Department of Transportation. Archived from the original on February 19, 2003. Retrieved April 15, 2022.
  10. "Oldham County: I-71 New Interchange at Milepoint 20.6 – Project 05-483.30". Kentucky Transportation Cabinet. Archived from the original on March 25, 2023. Retrieved March 25, 2023.
  11. Godbey, Dalton (October 3, 2022). "Construction on new I-71 interchange in Oldham County expected next week". Louisville, KY: WDRB. Archived from the original on March 25, 2023. Retrieved March 25, 2023.
  12. Smith, Lisa (February 1, 2019). "Will it soon be easy to get off (and then back on) I-71 at Western Row?". WCPO-TV. Archived from the original on January 28, 2024. Retrieved February 3, 2019.
  13. District 6 (August 16, 2012). "Transportation Partners Celebrate Opening of New Southern Gateway" (Press release). Ohio Department of Transportation District 6. Archived from the original on October 7, 2012. Retrieved February 27, 2013.{{cite press release}}: CS1 maint: numeric names: authors list (link)
  14. Riley, Robert (September 20, 2020). "Big Walnut Interchange at I-71 (2024+)". Delaware County Engineer, Delaware County, Ohio. Archived from the original on January 18, 2022. Retrieved January 16, 2022.
  15. Budzak, Gary (May 29, 2019). "Officials Discuss Two Interchange Projects". Delaware Gazette. Archived from the original on January 17, 2022. Retrieved January 16, 2022.