Jishixia_Hydro_Power_Station

Jishixia Dam

Jishixia Dam

Dam


The Jishixia Dam is a concrete face rock-fill embankment dam on the Yellow River in Qinghai Province, China. It is 101 m (331 ft) tall and downstream from the Gongboxia Dam. The purpose of the dam is hydroelectric power generation and flood control. The dam supports a power station with 3 x 340 MW Francis turbines for a total installed capacity of 1,020 MW. Construction on the dam began in 2005 and the river was diverted in March 2007. The first generator was operational in mid-2010 and the rest by the end of the year.[2][3]

Quick Facts Coordinates, Status ...

See also


References

  1. "Hydropower station at Jishixia Gorge begins construction". Qhnews.com. Retrieved 23 August 2011.
  2. "Hydroelectric Power Plants in China - Qinghai". IndustCards. Archived from the original on 13 April 2014. Retrieved 9 January 2011.
  3. "Yellow River Hydropower Project Jishixia progressing smoothly - hydropower - water industries". FrBiz. 2010-04-01. Archived from the original on 2011-07-11. Retrieved 9 January 2011.

Share this article:

This article uses material from the Wikipedia article Jishixia_Hydro_Power_Station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.