KTM_Komuter_Northern_Sector

KTM Komuter Northern Sector

KTM Komuter Northern Sector

Add article description


The KTM Komuter Northern Sector (Malay: KTM Komuter Utara) is one of the five KTM Komuter services run by Malaysian rail operator Keretapi Tanah Melayu (KTM). The service was introduced on 11 September 2015 following the completion of the Ipoh-Padang Besar Electrification and Double-Tracking Project in December 2014, which also saw the extension of ETS services to Padang Besar from Ipoh.

Quick Facts Overview, Native name ...

Currently, the KTM Komuter Northern Sector consists of two routes, namely the Butterworth - Padang Besar route and the Ipoh - Butterworth route. The lines share tracks with KTM ETS services, though the Komuter services call at stations also not served by ETS.

Lines, stations and rolling stock

The KTM Komuter Northern Section consists of two routes:

Since November 2021, the Butterworth-Padang Rengas route replaced the Bukit MertajamKamunting route. The Bukit Mertajam, Bukit Tengah and Butterworth stations are common stations between the two lines.[1] On 16 September 2023, the ButterworthPadang Rengas route was extended southwards to Ipoh.

⇄ = cross-platform interchange

Station Name Platform type  2   1  Interchange station/Notes
Padang Besar 2 Island Northern terminus.

KTM ETS

Bukit Ketri 2 Island
Arau 2 Island KTM ETS
Kodiang 2 Side
Anak Bukit 2 Side Access to Sultan Abdul Halim Airport within 5 to 8 minutes by taxi.

KTM ETS

Alor Setar 2 Side KTM ETS
Kobah 2 Side
Gurun 2 Island KTM ETS
Sungai Petani 2 Side KTM ETS
Tasek Gelugor 1 Island 1 Side KTM ETS
Bukit Mertajam 2 Island Interchange station

KTM ETS

Bukit Tengah 2 Island Interchange station
Butterworth 2 Island Access to George Town by Penang Ferry Service. Interchange and central terminus.

KTM ETS

Bukit Tengah 2 Island Interchange station
Bukit Mertajam 2 Island Interchange station

KTM ETS

Simpang Ampat 2 Side
Nibong Tebal 2 Side KTM ETS
Parit Buntar 2 Side KTM ETS
Bagan Serai 2 Side KTM ETS
Kamunting 2 Island
Taiping 2 Side KTM ETS
Padang Rengas 2 Island KTM ETS
Kuala Kangsar 2 Side KTM ETS
Sungai Siput 2 Island KTM ETS
Ipoh 2 Side Southern terminus.

KTM ETS

The train that are used to run on this track were the Class 83 and Class 92 while the other sets are used to operate on the Central sector.

Schedule

KTM Komuter Northern Sector has 2 routes/lines, in which they have their own schedule.

The (modified—with additional handle bars) interior of a Class 83 EMU train.

History

The KTM Komuter Northern Service was introduced on 11 September 2015. The initial service ran between Gurun in Kedah, Butterworth in Penang and Kamunting in Perak.[2][3][4][5] On 1 January 2016, a service between Butterworth and Padang Besar in Perlis was introduced. With the introduction of KTM Komuter services on this section, two KTM ETS services that ran between these stations have ceased, reducing the number of ETS services between the stations to make way for the new KTM Komuter service.[6][7]

On 17 January 2016, the original Gurun-Butterworth-Kamunting route was replaced with two separate routes: Butterworth-Gurun and Butterworth-Kamunting. These two lines together with the Butterworth-Padang Besar line operated until 1 July 2016, when the Butterworth-Gurun route was scrapped.[8]

A further revamp of routes on 1 September 2016 saw the Butterworth-Kamunting line being modified, with the northern terminus moving from Butterworth to Bukit Mertajam, and the southern terminus being extended by two additional stations from Kamunting to include Taiping and ending at Padang Rengas.

From November 4, 2021, trains from Padang Rengas and Padang Besar now terminate at Butterworth, making Butterworth and Bukit Mertajam the shared interchange stations between both lines.

An extension of the Padang Rengas line to Kuala Kangsar, Sungai Siput and Ipoh began running on 16 September 2023.[9][10]

See also


References

  1. "Northern KTM Komuter service pending SPAD approval". The Star. 24 August 2015.
  2. "Commuter rail to service north soon". The Star. 25 August 2015.
  3. "Penambahbaikan Perkhidmatan Tren Shuttle KTM Komuter di Sektor Utara" (PDF). Archived from the original (PDF) on 2 February 2016. Retrieved 28 January 2016.
  4. "KTM Komuter Utara Extension to Ipoh from 16 September 2023". railtravelstation.com. Retrieved 20 August 2023.

Share this article:

This article uses material from the Wikipedia article KTM_Komuter_Northern_Sector, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.