Kaiga Generating Station is a nuclear power generating station situated at Kaiga, near the river Kali, in Uttara Kannada district of Karnataka, India. The plant has been in operation since March 2000 and is operated by the Nuclear Power Corporation of India.

Quick Facts Country, Coordinates ...

It has four units. The fourth unit went critical on 27 November 2010.[2] The two oldest units comprise the west half of the site and the two newer units are adjoining the east side of the site. The older four units are small-sized pressurized heavy water reactors of 220 MW gross.

History

On 27 November 2010 the Kaiga Generating Station unit 4 of 220 MW capacity became operational.[3]

On 19 January 2011, unit 4 with 220 MW capacity was connected to the southern power grid at 01:56 hours. With this, the total capacity rose to 880 MW gross making it the third largest in India after Tarapur (1400 MW) and Rawatbhata (1180 MW). The unit, fueled by indigenous uranium, will supply electricity to Karnataka, Andhra Pradesh, Kerala, Tamil Nadu and Puducherry.[4]

In December 2018, it got the distinction of setting a world record of continuous operation among all nuclear power plants. As on 10 December 2018, KGS-1, which was synchronized to India's Southern grid on 13 May 2016, continues to operate for a record number of 962 days. Previous record of continuous operation was held by Unit 8 of Heysham II, which operated from 18 February 2014 to 15 September 2016 for a record number of 940 days.[5][6]

Two PHWR unit, each with a 700 MW capacity, have been planned for this location.[7] As of February 2017 pre-project activities have begun for them and if everything goes as planned the first of the two will become critical around 2024–25.[8]

Units

More information Phase, Unit No. ...

See also


References

  1. "Monthly Genration Reports Actual for Apr-2021 : Central Sector Nuclear" (PDF). National Power Portal. Central Electricity Authority. Retrieved 10 October 2021.
  2. "Front Page : Kaiga-4 achieves criticality". The Hindu. 28 November 2010. Archived from the original on 30 November 2010. Retrieved 14 September 2022.
  3. Hegde, Radha (27 November 2010). "Kaiga Atomic Power Plant Unit 4 Starts". abclive.in. Archived from the original on 30 November 2010. Retrieved 17 February 2017.
  4. "K'taka nuclear power plant second best in world for continuous operation". The News Minute. 7 November 2018. Archived from the original on 7 November 2018. Retrieved 7 November 2018.
  5. "Indian-Designed Nuclear Reactor Breaks Record for Continuous Operation". POWER Magazine. 1 February 2019. Retrieved 28 March 2019.
  6. "Centre's nod for units 5, 6 at Kaiga nuclear station". The Hindu. 12 June 2012. Retrieved 17 February 2017.
  7. Ray, Kalyan (13 February 2017). "Kaiga's 700 MWe units to be delayed; first one may become critical in 2024". Deccan Herald. Retrieved 17 February 2017.
  8. "Nuclear Power Reactor Details - Kaiga-1". Power Reactor Information System. International Atomic Energy Agency (IAEA). Retrieved 13 February 2020.
  9. "Nuclear Power Reactor Details - Kaiga-2". PRIS. (IAEA). Retrieved 13 February 2020.
  10. "Nuclear Power Reactor Details - Kaiga-3". Power Reactor Information System. International Atomic Energy Agency (IAEA). Retrieved 13 February 2020.
  11. "Nuclear Power Reactor Details - Kaiga-4". Power Reactor Information System. International Atomic Energy Agency (IAEA). Retrieved 13 February 2020.
  12. "Kaiga Nuclear Power Plant Expansion". Ns Energy. Retrieved 7 September 2019.

Share this article:

This article uses material from the Wikipedia article Kaiga_Atomic_Power_Station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.