Line_1,_Zhengzhou_Metro

Line 1 (Zhengzhou Metro)

Line 1 (Zhengzhou Metro)

Metro line in Zhengzhou, China


Line 1 of the Zhengzhou Metro (Chinese: 郑州地铁一号线; pinyin: Zhèngzhōu Dìtiě Yī Hào Xiàn) is a rapid transit line running from west to east Zhengzhou. It opened on the 28 December 2013.[1] This line is currently 41.2 km long with 30 stations.[2]

Quick Facts Overview, Status ...

Opening timeline

Phase 1 of Line 1 opened on 28 December 2013.[1] Phase 1 of Line 1 is 26.2 km (16.28 mi)[3] in length.

Phase 2 of Line 1 opened on 12 January 2017 extending terminals on both ends with additional seven stations (9.65 km[4]) on the western end and two stations (5.36 km[4]) on the eastern end.[5]

More information Segment, Commencement ...

Stations

Map of Zhengzhou Metro Line 1
More information Service routes, Station № ...

References

  1. "郑州地铁1号线今日正式试运营 开启中原城市新格局". 2013-12-28.
  2. "郑州市轨道交通1号线35KV及以下供电系统设施2020—2022年委外维修项目比选公告". 2019-09-24. 郑州市轨道交通1号线全长41.2km,设站30座,均为地下车站。其中,1号线一期工程线路长约26.2km,设站20座...1号线二期工程线路全长约15 km,设站10座...
  3. "郑州地铁1号线二期开门"迎客" 东边冷清西边热闹" (in Chinese). Xinhua. Retrieved 18 January 2017.
  4. "开了!郑州地铁河南大学新区站将于明天上午10点正式启用". Henan Daily (in Chinese (China)). 2019-11-20. Retrieved 2019-11-21.

Share this article:

This article uses material from the Wikipedia article Line_1,_Zhengzhou_Metro, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.