Line 15 of the Beijing Subway (simplified Chinese: 北京地铁15号线; traditional Chinese: 北京地鐵15號線; pinyin: běijīng dìtiě shíwǔhào xiàn) is a rapid transit rail line in northern Beijing. Line 15's color is purple.

Quick Facts Overview, Other name(s) ...

The line has a total length of 41.4 kilometres (25.7 mi) across northern Beijing from Qinghuadongluxikou in Haidian District in the west, to Fengbo in Shunyi District in the east.[2] The line uses Sparcs CBTC system supplied by Nippon Signal.[3] It cost ¥17.6 billion. The line features 6-car trains similar to other lines in the Beijing Subway.[4] Tunnels of Line 15 are up to 38 metres (125 ft) underground, making them the deepest in Beijing's subway system.[4] Trains run every 2–3 minutes during the rush hour with some trains performing express services.[5] A journey on a local all stop train from Fengbo to Qinghuadongluxikou station takes about 60 minutes.[6]

Route

The line is 41.4 km long (25.7 mi) with 20 stations, with 4 transfer stations at Wangjing (Line 14), Wangjing West (Line 13), Datunlu East (Line 5) and Olympic Green (Line 8). The line run from Qinghuadongluxikou in Haidian District to Fengbo in Shunyi District. Line 15 travels underground from Qinghuadongluxikou to Maquanying, and then goes above ground on an elevated track to Houshayu before returning underground and going underneath the Chaobai River to Fengbo. The elevated section is high enough to allow elevated roads to pass underneath. A major public venue on the Line 15 is the New China International Exhibition Center (New CIEC) at the China International Exhibition Center station. New CIEC holds the annual Beijing International Automotive Exhibition, which attracted 800,000 visitors in 2012.[7]

List of Stations

More information Service Route, Station Name ...

History

During planning of Line 15, the eastern terminus was moved from Fuqian Jie [10][11] to the east bank of the Chaobai River.[2] Construction began on Phase I of Line 15 in Shunyi District on April 11, 2009.[2][12] At that time, Phase I of Line 15 was only 31.15 km (19.36 mi) long with 12 stations.[2] According to the construction schedule in 2009, the easternmost Shunyi section of Phase I (18.5 km or 11.5 mi in length with seven stations) would be opened first on December 30, 2011.[13][14] The remainder of Phase I would follow in May 2013.[2]

The route of Line 15's Phase II has been revised several times over the years. In April 2009, Phase II plans showed the western half of Line 15 running from Xiyuan Station in Haidian District, through the campus of Tsinghua University, Zhongguancun, and the Olympic Green, and joining Phase I at Wangjing West.[2][10] When track-laying began in Phase I on October 28, 2009, the schedule and alignment of Phase II underwent a major revision, with one proposal extending Line 15 westward as originally planned with additional stations[15] and another proposal sending Line 15 southward and parallel to Line 8 to provide relief for congested Line 4 and 5.[16][17] Ultimately the route west to Qinghuadongluxikou was selected and the design of Xiyuan station leaves enough space to build another platform in between Line 4 and Line 16 platform for potential Line 15 extension westward beyond Qinghuadongluxikou.[18] Additionally the construction schedule was revised with Phase I expanded from 31 km (19 mi) and 12 stations to 38 km (24 mi) and 18 stations. Phase II plans also underwent a revision; instead of two sections, Phase II would be built and opened in three sections.

The first section of Phase I, from Wangjing West to Houshayu, opened on December 30, 2010. The second, from Houshayu to Fengbo, followed at the end of 2011. The third section, from Qinghuadongluxikou to Wangjing West, opened on December 28, 2014.[6]

In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) announced the phase 2 of line 15, with 3.5 km long extension from Fengbo to Nancai.[19]

Line 15, Phase I stations, from east to west with transfers in parentheses:

More information Section 1, opened Dec. 30, 2010, Section 2, opened Dec 31st, 2011 ...

 * Wangjing East station did not open in 2010 due to lack of connections with the surrounding road system. It was opened on 31 December 2016.

** Datunlu East station did not open in 2014 because the transfer corridors to Line 5 were still under construction. It was opened on 26 December 2015.

More information Segment, Commencement ...

Rolling Stock

More information Model, Image ...

References

  1. 北京地铁全网客流再创历史纪录 逼近1270万 (in Simplified Chinese). 中国新闻社. May 1, 2016. Retrieved 2016-05-01.
  2. 地铁15号线顺义段开工 望京西至后沙峪明年底开通 (in Simplified Chinese). Beijing Times. 2009-04-12. Archived from the original on 2016-01-25. Retrieved 2009-04-19.
  3. 北京地铁15号线最快段明年底开通(图) (in Simplified Chinese). 法制晚报. 2009-10-28.
  4. www.bjnews.com.cn. "北京地铁10条线路跑进2分间隔 疫情后部分措施将保留". www.bjnews.com.cn. Retrieved 2020-04-24.
  5. 地铁15号线一期12月28日全线贯通(图). beijing.cn (in Simplified Chinese). 2014-12-05. Archived from the original on 2014-12-28. Retrieved 2014-12-29.
  6. China Auto Show website: http://www.china-autoshow.com Archived 2007-03-21 at the Wayback Machine
  7. "15号线 | 北京地铁官方网站". www.bjsubway.com. Retrieved 2020-04-24.
  8. 15号线将连通中关村和奥运村 (in Simplified Chinese). Beijing Youth Daily. 1 October 2008. Archived from the original on 2008-10-02. Retrieved 2008-11-01.
  9. 北京地铁15号线将连接颐和园和顺义城区. The Beijing News (in Simplified Chinese). 8 November 2008. Archived from the original on 9 November 2017. Retrieved 9 November 2008.
  10. 视频:北京地铁15号线顺义段今日率先开工建设 (in Simplified Chinese). BTV. 11 April 2009.
  11. Kun, Guo (12 April 2009). 北京地铁15号线顺义段开工 2013年顺义到城区仅半小时. Jinghua Daily (in Simplified Chinese). Archived from the original on 9 November 2017. Retrieved 1 July 2009.
  12. Yan, Zheng (1 July 2009). 15号线顺义段2011年12月开通. 163.com news (in Simplified Chinese). Archived from the original on 24 October 2018. Retrieved 30 June 2009.
  13. 北京地铁15号线一期增加2站年底通车. The Beijing News (in Simplified Chinese). Sina News. 2011-05-14. Retrieved 2011-08-09.
  14. 15号线明年底部分开通. 163.com news (in Simplified Chinese). 29 October 2009.
  15. 北京地铁15号线二期可能改道. Sina real estate (in Simplified Chinese). 2010-01-26. Archived from the original on 2014-12-09.
  16. 关于地铁16号线车站设计方案展示中观众留言的回复 (in Simplified Chinese). Archived from the original on 2015-01-05. Retrieved 2014-12-30.
  17. "北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf" (PDF). China Academy of Railway Sciences Co., Ltd. 2022-07-08. Archived from the original (PDF) on 2022-07-08. Retrieved 2022-07-08.
  18. 地铁15号线确定"新7站" 有望2014年底通车. Bjhd.gov.cn. 1 February 2012. Archived from the original on 2013-01-16. Retrieved 2013-07-12.

Share this article:

This article uses material from the Wikipedia article Line_15,_Beijing_Subway, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.