Line 3 (Xi'an Metro)

Line 3 (Xi'an Metro)

Metro line in Xi'an, China


Line 3 of the Xi'an Metro (Chinese: 西安地铁三号线; pinyin: Xī'ān dìtiě sānhàoxiàn) is a rapid transit line running from northeast to southwest Xi'an, linking Xi'an International Trade & Logistics Park in the northwest through Xi'an Economic & Technological Development Zone to Yuhuazhai in the southwest. Line 3 is one of the three lines that form the main framework of Xi'an metro.[1] Phase 1 of Line 3 was opened on November 8, 2016, with 19 underground stations and 7 overground stations. Phase 2 is still under planning. The line is colored pink on system maps.[2]

Quick Facts Overview, Native name ...

Opening timeline

More information Segment, Commencement ...

Stations (from south to north)

More information Service routes, Station name ...

Future development

Phase 2

Phase 2 of Line 3 is still in long-term planning.[1] It will be an extension from the southwest terminus of Phase 1, Yuhuazhai station to Kunmingchi station (tentatively named). After the completion of Phase 2, Line 3 will have 30 stations (an addition of 4 to Phase 1) and a length of 50.5 km (31.4 mi) in total.[1]

Rolling stock

The rolling stock consists solely of CNR DKZ17 trains manufactured by CNR Dalian, 41 trainsets will be provided as per the first contract.[7] The trains run in six-car formation, with four motor cars and two trailer cars, which is different from previous trains (running in 3-3 formation), as more power is required to drive the trains up the ramp from underground to overground sections.[7]

Quick Facts DKZ17, Manufacturer ...

Train Control

Line 3, as all the previous lines, uses Trainguard MT CBTC signal system manufactured by Siemens[8][9] to enhance the safety of the automated, driverless trains.

Incidents

Defective cable incident

On 13 March 2017, a post titled Do you still dare to take the Xi'an Metro? (西安的地铁你们还敢坐吗) was posted by an anonymous whistle-blower on an online forum.[10] The poster claimed that the electrical cables used on Line 3 of Xi'an Metro, which were produced by Shaanxi Aokai Electrical Cables (Aokai Cables), did not meet the safety criteria, specifically, the cross-sectional area was smaller than specified, which might lead to overheating of the cables, therefore presenting a fire hazard.

On 15 March, Aokai Cables released a statement that the claims were unfounded and they have filed a police report.

On 16 March, the official Xi'an Metro Weibo account announced that they had launched an official investigation and an internal audit. On the same day, the government of Xi'an pledged to investigate the matter.

On 20 March, the government of Xi'an told a press conference that none out of five cable samples sampled were of acceptable quality.

In the wake of the incident, 8 members of staff from Aokai cables were arrested and disciplinary actions were taken against 122 local officials, including 8 bureau-directors and 58 division heads.[11]

Notes

  1. Note that trains running on line 3 will be different with 4 motor cars and 2 trailer cars.

References

  1. 西安地铁三号线一期工程 (in Simplified Chinese). 26 August 2013. Archived from the original on 12 October 2015.
  2. "创历史新高!4月30日西安地铁线网客运量448.21万人次" (in Chinese). 华商网. 2021-05-01. Retrieved 2021-05-02.
  3. 西安地铁三号线高架段供电系统工程正式开工. sn.people.com.cn (in Simplified Chinese). 17 March 2015. Retrieved 6 November 2015.
  4. 港务区车辆段供电成功 三号线列车开始调试. 西安地铁. Retrieved 10 December 2017.
  5. 西安地铁3号线首批列车到西安 腰线是粉色. 31 August 2015. Retrieved 6 November 2015.
  6. "Trainguard MT" (PDF). mobility.siemens.com. Siemens. p. 11. Retrieved 6 November 2015.
  7. 西安地铁你们还敢坐吗(转载). Tianya BBS. Retrieved 15 December 2017.
  8. 国务院严厉问责西安问题电缆 西安地铁三号线电缆门始末. 中金外汇. 8 June 2017. Retrieved 15 December 2017.

Share this article:

This article uses material from the Wikipedia article Line_3_(Xi'an_Metro), and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.