List_of_power_stations_in_Madagascar
The following page lists all power stations in Madagascar. The list is not complete. You can assist by adding relevant referenced content.
Operational
More information Hydroelectric station, Community ...
Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
---|---|---|---|---|---|---|---|
Andekaleka Hydroelectric Power Station | Andekaleka | Vohitra River | Gravity | N/A | 91 MW | 1982, 2012 | |
Antelomita Hydroelectric Power Station | Anjeva Gara | Ikopa River | Gravity | N/A | 8.4 MW | 1930, 1952, 1953 | |
Farahantsana Hydroelectric Power Station | Mahitsy[1] | Ikopa River | Gravity | N/A | 28 MW | 2022 | |
Mandraka Power Station | Mandraka | Mandraka River | Gravity | Lake Mandraka | 24 MW | 1956 | |
Ankevirato Hydroelectric Power Station[2] | Tsarazaza | Rianamboa River | Gravity | 560 kW | 2023 | ||
Close
Under construction
More information Hydroelectric station, Community ...
Hydroelectric station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes | |
---|---|---|---|---|---|---|---|---|
Volobe Hydroelectric Power Station | Ambodilazana | water power | 120 MW | 2027 | Compagnie générale d’hydroélectricité de Volobe (CGHV)[3] |
Close
Proposed
More information Hydroelectric station, Community ...
Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
---|---|---|---|---|---|---|---|
Antetezambato Central[4] | Ambatofinandrahana District | ?? | Gravity | 140 MW[5] | (projected) | ||
Sahofika Hydroelectric Power Station[6] | Sahofika | Onive River | Gravity | Sahofika Reservoir | 205 MW[6] | 2024 (Expected) | |
Antananarivo Mixed Hydrosolar Power Station[7] | Antananarivo | Run of river | N/A | 35 MW[7] | 2026 (Expected) | ||
Ranomafana Hydroelectric Power Station | Ranomafana (95 km northwest of Antananarivo)[8] | -18°36’35.9S,47°1’13.27 E | Ikopa River[9] | Gravity | 2x32MW = 64 MW[10] | 202? (Expected) | |
Close
Operational
More information Thermal power station, Community ...
Thermal power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Ambohimanambola Thermal power station | Ambohimanambola[11] | Heavy fuel oil | 105 MW[12] (7x15 MW) | 2024 | Jirama (state financed) | | ||
Mandroseza Power Plant | Antananarivo | Heavy fuel oil | 40 MW[13] | 202? | Symbion Power Mandroseza SA[14] | ||
Noor I Thermal Power Station[13] | Antananarivo | Heavy fuel oil | 48 MW[13] | 2018 | Jovena | ||
Noor II Thermal Power Station[13] | Antananarivo | Heavy fuel oil | 28 MW[13] | 2018 | Jovena | ||
Andaingo Thermal Power Station[15] | Andaingo | Biomass | 75 MW[15] | 2012 | CIRAD | ||
Close
More information Solar power station, Community ...
Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Ambatolampy Solar Power Station | Ambatolampy | Solar | 40 MW | April 2022 | Ambatolampy Solar Consortium | ||
Access Solar Power Station[16] | Antananarivo | Solar | 25 MW[16] | 2025 Expected | Access Power | ||
Centrale Solaire d’Andranotakatra | Belobaka, Mahajanga II[17] | 12 MW Solar central | Solar | 1.25 MW | 2022 | ||
Centrale Solaire d’Ambavahadinilakaka (Ihorombe) | Ambavahadinilakaka[18] | 470 kW Solar central | Solar | 470 kW | 2022 | Maherlla | |
Sambava Solar Power Station | Sambava[19] | Solar | 500 kW | March 2022 | Green Energy Solutions | ||
Close
More information Solar power station, Community ...
Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Kimony Solar Hybride Central | Bemanonga, Menabe | Solar + Thermal | 1.4 MW operative, 3MW projected[20] | 2022 (1.4MW operative) | Green Energy Solutions (GES) + Jirama | ||
Sava Hybride Power Station | Sambava, Antalaha, Vohemar[21] | Solar + Thermal | 8 MW Thermal + 5MW solar | Green Yellow | |||
Tanambao Verrerie Solar-hybride central | Tanambao Verrerie, Toamasina | Solar + Thermal | 18MW | 2021 | Jirama | ||
Toliara Centrale Energetique | Besinjaka (Tulear)[22] | Thermal + Solar | 9 MW Thermal + 2.9 MW solar | Filatex Energy | |||
Close
- Jean Marie Takouleu (26 May 2020). "Madagascar: ADF supports Sahofika hydropower project with a €4 million loan". Paris: Afrik21.africa. Retrieved 16 September 2020.
- Boris Ngounou (29 August 2019). "Madagascar: 35 MW hydroelectric power plant in project in Antananarivo". Paris: Afrik21.africa. Retrieved 16 September 2020.
- Towerco of Madagascar (30 January 2018). "Jovena: Two new 76 MW thermal power stations planted" (Translated from the original French language). Antananarivo: Towerco of Madagascar. Retrieved 15 September 2020.
- CIRAD (April 2013). "Decentralized rural electricity distribution: the first thermal power station using biomass in Madagascar". Paris: CIRAD. Retrieved 16 September 2020.
- Access Power (September 2020). "Access Power: Our Projects In Madagascar". Dubai: Access Power. Retrieved 16 September 2020.
- Mini-Grid Market Opportunity Assessment: Madagascar As of March 2019.