Middlesbrough_railway_station

Middlesbrough railway station

Middlesbrough railway station

Railway station in North Yorkshire, England


Middlesbrough is a railway station on the Durham Coast Line, Esk Valley Line and Tees Valley Line. The station serves the town of Middlesbrough in North Yorkshire, England. It is owned by Network Rail and managed by TransPennine Express. Direct destinations include Darlington, Saltburn, Sunderland, Newcastle, York, and Manchester Airport. There is a direct service to London Kings Cross once per weekday.

Quick Facts General information, Location ...

According to the Office of Rail and Road statistics, Middlesbrough railway station is the fourth busiest in the North East region, with 1,376,410 total entries and exits (2022–23 period).[1]

History

The station, as seen at the turn of the twentieth century (left), and in the 2010s (right).

The first railway line was opened in the area as long ago as December 1830, as an extension of the Stockton and Darlington Railway, to connect with the port of the (then new) town of Middlesbrough. From the opening of the line until 1837, passengers were served by a wooden shed on the route to the riverside coal staithes. The line was extended to the new exchange along Commercial Street in 1837, with a new station being constructed two years later. This new, more substantial station was opened by the S&DR in 1839.[2][3]

In June 1846, a branch line extending eastwards from the Stockton and Darlington Railway towards Redcar was opened by the Middlesbrough and Redcar Railway. Situated on the Redcar branch line on the southern edge of the new town, a new passenger station was designed by John Middleton, which opened on 26 July 1847.

As the town expanded rapidly southwards during the second half of the nineteenth century, the station was unable to cope with the increased traffic. Due to the design of the station not lending itself to expansion, it was subsequently demolished in 1874. It was replaced by the current, much larger station, which opened in December 1877. The Commercial Street station, becoming increasingly isolated from the town by the opening of the Redcar branch line, became a goods station, before eventually being demolished.[4][5][6]

The current station was designed by the North Eastern Railway's chief architect, William Peachey, with an ornate Gothic style frontage. Behind this, an overall roof of elliptical design once existed. Constructed out of wrought iron of lattice design, with glass covering the middle half, and timber (inside) and slate (outside) covering the outer quarters. The two end screens were glazed with timber cladding around the outer edges. The roof was high in relation to its width.[7]

The elliptical roof was severely damaged in a German daylight air raid, which took place on the afternoon of 3 August 1942.[8][9] It was eventually removed in 1954, to be replaced by the current design over the concourse and platforms.[10]

A major refurbishment of the station took place during 2017 and 2018, with repairs carried out to the station's roof and stonework, as well as the upgrading of the Wood Street car park.[11] New information screens were also installed as part of the refurbishment.

As part of a major upgrade to the station, platform 2 was extended in the first half of 2021, allowing for a new direct service from Middlesbrough to London King's Cross. On 13 December 2021, a London North Eastern Railway Class 800 Azuma departed from the station at 07:08am, the first direct service to the capital since 1988.[12][13]

Facilities

The ticket offices
The Waiting room

The main station layout consists of an entrance hall with ticket office, large concourse/waiting area and two covered platforms that are each subdivided into two sections. Platform 1 is divided into two sub-platforms (1a and 1b), as is platform 2 (2a and 2b). Two freight lines bypass to the north of the station.

The station is staffed and has a range of facilities including a cafe/bar, newsagent's shop, cycle storage, toilets and lifts.[14] A number of information screens throughout the station provide information on train arrivals and departures.

Car parking is situated to the east of the station and can be accessed via Exchange Square and Wood Street, and by footpath directly to the station. A drop-off point is located at the front of the station, close to the main entrance.

Current Redevelopment

The station is currently undergoing a major £34 million redevelopment to improve the overall layout of the station. The existing undercroft and ticket office area are being completely rebuilt, existing staircases are being repositioned and a new station entrance will be built with completion scheduled in 2024.[15]

A new platform 3 and additional track is planned to be built on the northern side of the station, increasing capacity to accommodate more trains. The £40 million project, linking in with the current redevelopment, will be funded by money secured from the scrapping of the HS2 Northern leg and is scheduled to be completed in 2025.[16][17]

Services

London North Eastern Railway

As of the December 2021 timetable change, London North Eastern Railway operate a once per weekday return service to London King's Cross, calling at Thornaby and York. More services are planned following the completion of station works.[18]

Rolling stock used: Class 800 Azuma

Northern Trains

Durham Coast Line

More information Northern TrainsRoute 2, Durham Coast Line ...

As of the May 2021 timetable change, the station is served by an hourly service between Newcastle and Middlesbrough. Most trains continue to Hexham (or Carlisle on Sunday) and Nunthorpe. Two trains per day (three on Sunday) continue to Whitby.[19]

Rolling stock used: Class 156 Super Sprinter and Class 158 Express Sprinter

Esk Valley Line

More information Northern TrainsRoute 5, Esk Valley Line ...

Following the May 2021 timetable change, the station is served by an hourly service between Middlesbrough and Nunthorpe, with two trains per day (excluding Sunday) continuing to Battersby, and six per day (four on Sunday) continuing to Whitby. Most trains continue to Newcastle via Hartlepool.[20]

Rolling stock used: Class 156 Super Sprinter and Class 158 Express Sprinter

Tees Valley Line

As of the May 2021 timetable change, the station is served by two trains per hour between Saltburn and Darlington via Middlesbrough, with one train per hour extending to Bishop Auckland. An hourly service operates between Saltburn and Bishop Auckland on Sunday.[21]

Rolling stock used: Class 156 Super Sprinter and Class 158 Express Sprinter

TransPennine Express

As of the December 2022 timetable change, the station is served by an hourly service between Saltburn and Manchester Airport via York. Most services run via Yarm, with the exception of one early morning arrival which travels via Darlington.[22]

Rolling stock used: Class 185 Desiro

Notes

  1. The first station was a timber-built shed, constructed by the Stockton and Darlington Railway.
  2. The second station was located on Commercial Street.

References

  1. "Estimates of station usage 2022/23". Office of Rail and Road. Retrieved 29 January 2024.
  2. "Railway Architecture of North East England : Middlesbrough". W. Fawcett, 2011. Retrieved 28 December 2020.
  3. "December 1861 map of Middlesbrough North Riding: A Vision of Britain Through Time". University of Portsmouth and others. Retrieved 11 December 2015.
  4. Body 1988, pp. 118–9
  5. "Yorkshire 6 (includes: Billingham; Middlesbrough.) Surveyed: 1853 Published: 1857". Old Maps Online: National Library of Scotland. Retrieved 4 January 2021.
  6. Delplanque, Paul. "Middlesbrough Railway Station...Then and now". GazetteLive. Retrieved 21 January 2011.
  7. Hitches, M – Steam Around Middlesbrough (Amberley Publishing, 2014) p. 69
  8. Brown, Mike (21 December 2016). "Middlesbrough Railway Station: £2.7m refurbishment will start in the new year". GazetteLive. Retrieved 30 December 2016.
  9. Banks, Georgia (13 February 2023). "British steel to be used in £34m Middlesbrough station revamp". Teesside Live. Retrieved 25 March 2023.
  10. "Middlesbrough Rail Station". ©Tees Valley Combined Authority. Retrieved 29 January 2024.
  11. "Mayor Unveils His £1Billion Transport Plan For Region". ©Tees Valley Combined Authority. Retrieved 29 January 2024.
  12. "Train times: Middlesbrough to Whitby (Esk Valley Railway)" (PDF). Northern Trains. 16 May 2021. Archived from the original (PDF) on 8 May 2021. Retrieved 8 May 2021.

Bibliography

  • Body, G (1988). PSL Field Guides – Railways of the Eastern Region Volume 2. Wellingborough: Patrick Stephens Ltd. ISBN 1-85260-072-1.

Share this article:

This article uses material from the Wikipedia article Middlesbrough_railway_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.