National Highway 275 (India)

National Highway 275 (India)

National highway in India


National Highway 275 (NH-275), also commonly referred to as Bengaluru–Mysuru access-controlled Expressway, part of the Bengaluru–Mangaluru Economic Corridor (EC-34),[1] is a national highway that starts from Bengaluru and goes through Mysuru as a 10-lane expressway of 119 km (74 mi), and again as 4-lane till Bilikere (towards Madikeri), and ends at Bantwal.[2] This highway connects the coastal city of Mangaluru to Bengaluru. It is also a bypass route for the National Highway 75 (NH-75). The Bengaluru to Mysuru section of this highway was upgraded from 4 to 10 lanes, out of which the 6-lane section is the main elevated access-controlled carriageway and the other 2-lane section on both ends of the carriageway are service roads. It claims to reduce the travel time between Bengaluru and Mysuru from 3 hours to 75 minutes.[3]

More information Highway Number, Source ...

Quick Facts Route information, Length ...

Bengaluru-Mysuru section

The highway section between Bengaluru and Mysuru

The Bengaluru–Mysuru access-controlled Expressway is a 119 km (74 mi) long, 10-lane, elevated access-controlled expressway. It has been built at a cost of ₹ 8,000 crore and was developed in two phases. Phase-1 of 56 km (35 mi) length connecting Bengaluru and Nidaghatta, and Phase-2 of 61 km (38 mi) connecting Nidaghatta and Mysuru. The foundation stone for the project was laid in March 2018.[4]

Status updates

  • Mar 2018: Foundation stone laid for the project.
  • Apr 2018: Contract awarded for Phase-1 to Bhopal-based Dilip Buildcon Limited.
  • Mar 2019: Civil work which got stuck due to land acquisition issues to start by April 2019.[5]
  • Jul 2020: Work on Phase-1 started in May 2019 and work on Phase-2 started in Dec 2019. Both phase are seeing delay due to COVID-19 related problems, which caused labour shortages and several delays in work. It may see the deadline of January 2022; to get further delayed.[6]
  • Dec 2021: Work on Phase-1 completed up to 83% and Phase II completed up to 73%. The expressway is expected to become operational by October 2022.[7]
  • Feb 2023: The highway is at its final stages of construction work, and will be inaugurated by Prime Minister Narendra Modi on 11 March 2023.[8][9]
  • March 2023: The expressway section was inaugurated by Prime Minister Narendra Modi on 12 March 2023.[10]

See also


References

  1. "Police ask motorists on Bengaluru-Mysuru expressway to drive cautiously". The Hindu. 6 October 2022.
  2. "Rationalization of Numbering Systems of National Highways" (PDF). Govt of India. 28 April 2010. Retrieved 21 August 2011.
  3. "Prime Minister Narendra Modi inaugurates 118-km Bangalore-Mysore Expressway". The Telegraph. 12 March 2023. Retrieved 13 March 2023.
  4. "Bengaluru-Mysuru road is national highway, not expressway: NHAI". The Times of India. 4 August 2023. ISSN 0971-8257. Retrieved 4 August 2023.
  5. "PM Narendra Modi to open Bengaluru-Mysuru Expressway on March 11: MP Pratap Simha". The Times of India. 25 February 2023. ISSN 0971-8257. Retrieved 25 February 2023.
  6. "Prime Minister Narendra Modi inaugurates 118-km Bangalore-Mysore Expressway". The Telegraph. 12 March 2023. Retrieved 13 March 2023.

Share this article:

This article uses material from the Wikipedia article National_Highway_275_(India), and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.