Newlincs_EfW_facility

Newlincs EfW facility

Newlincs EfW facility

Add article description


The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.[1]

Quick Facts Official name, Country ...

See also


References

  1. "Your waste, our energy" (PDF). Archived from the original (PDF) on 28 September 2007., www.newlincs.com, Retrieved 22 February 2007



Share this article:

This article uses material from the Wikipedia article Newlincs_EfW_facility, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.