Nuclear_energy_in_Kenya
In 2017, the Kenya Nuclear Electrification Board (Kneb) estimated that a 1,000 MW nuclear plant could be operational by 2027 and cost Ksh500-600 billion ($5-$6 billion),[1] to be located near a large body of water, such as the Indian Ocean, Lake Victoria or Lake Turkana.[2]