The Reusens Dam is a 12.5 MW[1] hydroelectric generation facility on the James River near the city of Lynchburg, Virginia, United States. The project includes a concrete gravity dam spanning the left side of river which incorporates eight 16 3/4-foot-high flood gates, a 125 feet long by 25 feet tall concrete arch dam segment with 7 1/4-foot-high flashboards, and two separate power houses towards the right bank which contain hydroelectric generation equipment. The A and B power houses have installed capacities of 7.5 MW with three turbines and 5.0 MW with two turbines, respectively. The plant is used in a peaking capacity.[2] The dam is located downstream of the smaller Holcomb Rock Dam and upstream of the Scotts Mill Dam. The typically submerged Bosher Dam near Richmond lies further downstream.[3]
During the year ending September 30, 2014, the project did not produce any electricity.[4]