Reventazón_Dam

Reventazón Dam

Reventazón Dam

Dam in Siquirres, Limón Province


The Reventazón Dam is a concrete-face rock-fill dam on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. It was inaugurated on 16 September 2016,[2] and its primary purpose is the production of hydroelectric power. The US$1.4 billion project and largest power station in the country has an installed capacity of 305.5 MW and is expected to provide power for 525,000 homes.[3][4][5] Construction on the dam began in 2009. At a height of 130 metres (430 ft) and with a structural volume of 9,000,000 m3 (12,000,000 cu yd), it is the largest dam in Central America. To produce electricity, water from the reservoir is diverted about 3 km (1.9 mi) to the northeast where it reaches the power station along the Reventazón River.[6] Due to its environmental features, like offset habitats and migration corridors for jaguars and many other species, the project could be a model for other future hydroelectric power plants.[7]

Quick Facts Country, Location ...

See also


References

  1. "Reventazón".
  2. "View of the hydroelectric dam on the Reventazon River". Ezequiel Becerra. AFP. Retrieved 17 September 2016.
  3. "Reventazón Hydropower Project". Inter-America Development Bank. 22 May 2012. Retrieved 20 December 2014.
  4. "Project of the Month" (in Spanish). Pedregal. Retrieved 20 December 2014.[permanent dead link]
  5. Joerg Hartmann; David Harrison; Je Opperman; Roger Gill (18 November 2013). The Next Frontier of Hydropower Sustainability: Planning at the System Scale (PDF) (Report). 16pp. Retrieved 17 September 2016.

Share this article:

This article uses material from the Wikipedia article Reventazón_Dam, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.