The Small Satellite Launch Vehicle (SSLV) is a small-lift launch vehicle developed by ISRO with payload capacity to deliver 500 kg (1,100 lb) to low Earth orbit (500 km (310 mi)) or 300 kg (660 lb) to Sun-synchronous orbit (500 km (310 mi))[7] for launching small satellites, with the capability to support multiple orbital drop-offs.[11][12][13] SSLV is made keeping low cost, low turnaround time in mind with launch-on-demand flexibility under minimal infrastructure requirements.[14]

Quick Facts Function, Manufacturer ...

The maiden flight SSLV-D1 was conducted on 7 August 2022,[8][15] from the First Launch Pad, but failed to orbit.[16] A second flight SSLV D2 was conducted on 10 February 2023 that successfully delivered payloads to orbit.[17]

In the future, a dedicated launch site in Kulasekharapatnam, Tamil Nadu will handle SSLV launches to Sun-synchronous orbit.[18][19][20][21] After entering the operational phase, the vehicle's production and launch operations will be done by a consortium of Indian firms along with NewSpace India Limited (NSIL).[22][23][24]

Vehicle description

EOS 02 spacecraft and VTM upper stage integrated in a cleanroom facility.

The SSLV was developed with the aim of launching small satellites commercially at drastically reduced price and higher launch rate compared to Polar Satellite Launch Vehicle (PSLV). The development cost of SSLV is 169.07 crore (equivalent to 190 crore or US$24 million in 2023)[16][2] and the manufacturing cost is expected to be 30 crore (US$3.8 million) to 35 crore (US$4.4 million).[3][23][4]

The projected high launch rate relies on largely autonomous launch operation and on overall simple logistics. To compare, a PSLV launch involves 600 officials while SSLV launch operations would be managed by a small team of about six people. The launch readiness period of the SSLV is expected to be less than a week instead of months.[25][26] The launch vehicle can be assembled both vertically like the existing PSLV and Geosynchronous Satellite Launch Vehicle (GSLV) and horizontally like the retired Satellite Launch Vehicle (SLV) and Augmented Satellite Launch Vehicle (ASLV).[27]

The first three stages of the vehicle use HTPB based solid propellant, with a fourth terminal stage being a Velocity-Trimming Module (VTM) with eight 50 N thrusters for reaction control and eight 50 N axial thrusters for changing velocity.[10] With these VTM can add delta-v of up to 172 m/s.[28]

The first stage (SS1) and third stage (SS3) of SSLV are newly developed while second stage (SS2) is derived from third stage (HPS3) of PSLV.[29][30][31]

Vehicle characteristics:[32][33]

  • Height: 34 meters
  • Diameter: 2 meters
  • Mass: 120 tonnes

Payloads capabilities[7][34]

  • Single/Multi Satellites - Nano, Micro, Mini satellites
  • 500 kg in 500 km orbit at 35° to 55° inclination range.
  • Up to 300 kg into 500 km sun-synchronous orbit.

SSLV Launch Complex

The early developmental flights and those to inclined orbits will launch from Sriharikota,[19] at first using existing launch pads and later from dedicated facility called SSLV Launch Complex (SLC) in Kulasekharapatnam.[35][18] Tenders related to manufacturing, installation, assembly, inspection, testing and Self Propelled launching Unit (SPU) were released in October 2019.[36][37][38]

This new spaceport, under development, near Kulasekharapatnam in Tamil Nadu will handle SSLV launches to Sun-synchronous orbit when complete.[20][39][40]

History

Development

In 2015, a National Institute of Advanced Studies report by Rajaram Nagappa proposed development path of a 'Small Satellite launch Vehicle-1' to launch strategic payloads.[41] In National Space Science Symposium 2016,[42] then Director of Liquid Propulsion Systems Centre, S. Somanath also acknowledged a need for identifying a cost effective launch vehicle configuration with 500 kg payload capacity to LEO[43] and by November 2017, development of such launch vehicle was underway.[44]

By December 2018, the Vikram Sarabhai Space Centre (VSSC) completed the design for the vehicle.[45]

In December 2020, all booster segments for SSLV first stage (SS1) static test (ST01) were received and assembly was done in Second Vehicle Assembly Building (SVAB).[46]

The first static fire test (ST01) of the SS1 first-stage booster conducted on 18 March 2021 was unsuccessful.[47][48] About 60 seconds into the test, oscillations were observed and after 95 seconds, the nozzle of SS1 stage disintegrated. The nominal duration of test was 110 seconds.[49] To qualify for flight, SSLV's solid first stage SS1 has to perform two consecutive nominal static fire tests.[49]

The SSLV Payload Fairing (SPLF) functional qualification test was completed in August 2021.[50]

The second static fire test of SSLV first stage SS1 was conducted on 14 March 2022 at SDSC-SHAR and met the required test objectives.[51][52]

Operational history

SSLV-D1

The first developmental flight of the SSLV occurred on 7 August 2022. The flight mission was named SSLV-D1. The SSLV-D1 flight failed to achieve its mission objectives.

The rocket had a three stage configuration with a fourth Velocity Trimming Module (VTM). In its D1 configuration, the rocket was 34m tall with a diameter of 2m and a lift-off mass of 120t.[53]

The rocket carried EOS 02, an Earth observation satellite that weighed 135 kg and AzaadiSAT, a CubeSat payload that weighed 8 kg, developed by Indian students to promote inclusivity in STEM education. The SSLV-D1 was supposed to place the two satellite payloads in a circular orbit of altitude 356.2 km with 37.2° inclination.

The official explanation by the ISRO for the mission failure was software malfunction.[54][55][56] According to the ISRO, the mission software detected an accelerometer anomaly during the second stage separation. This caused the rocket navigation to switch from a closed loop guidance to an open loop guidance.[57] Even though, this switch in guidance mode was part of the redundancy built into the rocket's navigation, it could not salvage the mission.

During the open loop guidance mode, the final VTM stage only managed to fire for 0.1s instead of the intended 20s.[58] This led to the two satellites as well as the VTM stage of the rocket being injected into an unstable elliptical transatmospheric orbit of 360.56×75.66 km with an inclination of 36.56°.[56]

The SSLV-D1’s final VTM stage had 16 hydrazine (MMH+MON3) fueled thrusters. Eight of those were to provide altitude control and the remaining eight for controlling the orbital velocity.[59] The VTM stage also provided pitch, yaw and roll control during the orbital insertion maneuvers.[60] The three main stages of the SSLV-D1 functioned normally. But, that was not enough to impart adequate impulse for the two satellite payloads to achieve stable orbits. For the injection of the two satellite payloads into their intended stable orbits, the VTM stage had to fire for at least 20 seconds, to impart enough additional orbital velocity and altitude corrections. Instead the VTM kicked-in at 653.5s and shut itself down at 653.6s, post lift-off.[61] Following the partial firing of the VTM stage, the EOS 02 was released at 738.5s and AazadiSAT at 788.4s, post-liftoff. These failures transpired, resulting in the satellites entering an unstable orbit and subsequently destroyed upon reentry.

SSLV launch statistics

Launch statistics

1
2
3
2022
2023
2024
  •   Failure
  •   Partial failure
  •   Success
  •   Planned
Decade-wise summary of SSLV launches
More information Decade, Successful ...

See also


References

  1. "SSLV MANUFACTURING". /www.nsilindia.co.in. Retrieved 7 August 2022.
  2. "Satellite Launch Vehicle" (PDF). 16 December 2021. The development of SSLV is in the final stages and the first developmental flight of SSLV is targeted during the first quarter of 2022. The Government has sanctioned a total cost of Rs.169.07 Crores for the development project including the development & qualification of the vehicle systems and the flight demonstration through three development flights (SSLV-D1, SSLV-D2 & SSLV-D3)
  3. "Chandrayaan-2 Mission planned for middle of April". @businessline. 11 January 2019. Retrieved 28 July 2019.
  4. "Why ISRO's maiden SSLV mission failed despite successful launch of new rocket". Dnaindia.com. 8 August 2022. Retrieved 13 August 2022.
  5. "SSLV technical brochure V12" (PDF). 20 December 2019. Archived (PDF) from the original on 20 December 2019. Retrieved 20 December 2019.
  6. "SSLV-D1/EOS-2 Mission Brochure" (PDF). Archived from the original (PDF) on 3 August 2022. Retrieved 4 August 2022.
  7. "Small Satellite Launch Vehicle". Retrieved 5 November 2021.
  8. Gunter's space page: SSLV
  9. "SSLV". space.skyrocket.de. Retrieved 9 December 2018.
  10. "Department of Space presentation on 18 January 2019" (PDF). 18 January 2019. Retrieved 30 January 2019.
  11. U., Tejonmayam (7 August 2022). "SSLV-D1/EOS-02 mission: Rocket injected satellites but orbit achieved is less than expected, Isro says". The Times of India. Retrieved 7 August 2022.
  12. Service, Tribune News. "ISRO plans to launch new rocket before December 2020". Tribuneindia News. Retrieved 7 October 2020.
  13. "Design, Fabrication, Integration, Testing, Supply and Commissioning of Vehicle Telecommand Systems" (PDF). 16 September 2020. Archived from the original (PDF) on 6 August 2022. The proposed systems will be used as a part of new commanding requirement for Small Satellite Launch Vehicle (SSLV) Launch Complex (SLC) Site at Kulasekarapatnam, Tamilnadu.
  14. ""Industrialised" PSLV by 2022". The Hindu. 25 January 2020. ISSN 0971-751X. Retrieved 25 January 2020.
  15. Singh, Surendra (4 May 2018). "ISRO to rope in industry majors for mini-PSLV project". The Times of India. Retrieved 2 September 2018.
  16. "India's 19 upcoming missions, and ISRO's Small Satellite Launch Vehicle (SSLV)". SpaceTech Asia. 28 August 2018. Retrieved 2 September 2018.
  17. "Design for Small Satellite Launch Vehicle ready". The Hindu. 21 December 2018. Retrieved 21 December 2018.
  18. Ramachandran, R. (26 August 2022). "First SSLV flight fails to put satellites in correct orbit". frontline.thehindu.com. Retrieved 31 August 2022. According to a former ISRO scientist, the VTM can correct for a velocity shortfall of up to 172 metres/s. The rocket used for SSLV-D1 was a 34 m tall, 2 m diameter vehicle having a lift-off mass of 120 t.
  19. SSLV-D1/EOS-02 Mission Video_English. 6 August 2022. Event occurs at 2 minute 30 seconds.
  20. "Expression of Interest for Manufacturing of Composite motor cases of ISRO's launch vehicles" (PDF). 19 February 2020. Archived from the original (PDF) on 5 June 2020. Retrieved 6 August 2022. It may be specifically noted that process toolings of composite motor case for 2nd stage of SSLV is interchangeable with composite motor case for 3rd stage of PSLV to maximum extent.
  21. SHAR Director Rajarajan Press Meet. 15 August 2022. Event occurs at 2 minutes 40 seconds. Two solid stages are new, fully developed. That is SS1 with 85-90 tonnes and SS3 with 4.5 tonnes whereas SS2 is almost identical to the HPS3 of PSLV.
  22. "ORF on Twitter". twitter,com. Retrieved 2 September 2018.
  23. "Indian Space Research Organisation". www.isro.gov.in. Retrieved 5 June 2023.
  24. "Message from Chairman's desk". isro.gov.in. Indian Space Research Organisation. 1 January 2019. Archived from the original on 2 January 2019. Retrieved 30 October 2019.
  25. "TENDER NOTICE NO. SDSC SHAR/Sr.HPS/PT/13/2019-2020" (PDF). isro.gov.in. ISRO. Retrieved 30 October 2019. REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION AND COMMISSIONING OF RAIL TRACK FOR SLC PROJECT
  26. "TENDER NOTICE NO. SDSC SHAR/Sr.HPS/PT/RO/03/2019-2020" (PDF). isro.gov.in. Retrieved 30 October 2019. REQUEST FOR PROPOSAL (RFP) FOR PROCUREMENT, MANUFACTURE, SUPPLY, TESTING and COMMISIONING [sic] OF SELF PROPELLED UNITS FOR SLC
  27. "TENDER NOTICE NO. SDSC SHAR/Sr.HPS/PT/11/2019-2020" (PDF). isro.gov.in. ISRO. Retrieved 30 October 2019. RFP document for Supply of Stainless Steel Tanks
  28. 4 IAF Pilots Selected, Design Phase Of Manned Mission Over (Video). 2 January 2020. Event occurs at 8 minutes.
  29. Nagappa, Rajaram (December 2015). "The Promise of Small Satellites for National Security" (PDF). Archived (PDF) from the original on 14 January 2017. Retrieved 21 March 2022. By appropriate choice from among the solid propellant stages available with ISRO and DRDO, a launch vehicle could be configured and designated Small Satellite Launch Vehicle (SSLV-1). The performance of SSLV-1 was estimated using the in house developed trajectory-modelling programme QuoVadis. The performance runs show that SSLV-1 is capable of putting a 350 kg satellite in a polar orbit of 511 km x 497 km orbit and a 400 kg satellite in an orbit of 425 x 401 km (higher payloads are possible in equatorial orbit). This payload capability allows the launch of microsatellites with optical imaging and radar imaging payloads as well as individual intelligence satellites. Satellite life for the 400 kg mass satellite may be short in the 400 km orbit.
  30. "NSSS 2016". 7 February 2016. Archived from the original on 7 February 2016.
  31. Surendra Singh (22 November 2017). "Isro news: A rocket that can be made in 3 days | India News - Times of India". The Times of India. Retrieved 20 March 2022.
  32. Rajwi, Tiki (21 December 2018). "Design for Small Satellite Launch Vehicle ready". The Hindu. ISSN 0971-751X. Retrieved 20 March 2022.
  33. "SDSC-SHAR Website". 1 January 2021. Archived from the original on 1 January 2021. Retrieved 14 March 2022.
  34. "Department of Space, Annual Report 2021-22" (PDF). 27 April 2022. Archived from the original (PDF) on 27 April 2022. The first static test of SS1 solid motor was conducted and the performance of SS1 ignition system, propellant system and Flex Nozzle Control (FNC) system was evaluated. Various design modifications have been incorporated to resolve the anomalies observed in the first static test (…)
  35. "Monthly Summary of Department of space for the month of August 2021" (PDF). 29 September 2021. Archived from the original on 29 December 2021.
  36. "SSLV-D1/EOS-02 Mission - ISRO". www.isro.gov.in. Archived from the original on 7 August 2022. Retrieved 7 August 2022.
  37. "SSLV-D2/EOS-07 Mission: Second Developmental Flight of SSLV". www.isro.gov.in. Retrieved 5 February 2023.

Share this article:

This article uses material from the Wikipedia article Small_Satellite_Launch_Vehicle, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.