Steel_plate_construction

Steel plate construction

Steel plate construction

Method of construction


Steel plate construction is a method of rapidly constructing heavy reinforced concrete items.

Development

The method was developed in Korea in 2004 at a steel fabricator.[citation needed]

Construction method

Each assembly has two parallel steel plates joined by welded stringers or tie bars. The assemblies are then moved to the job site and placed with a crane. Finally, the space between the plate walls is filled with concrete.[1] The method provides excellent strength because the steel is on the outside, where tensile forces are often greatest.

Construction with this method is accomplished roughly twice as fast with as other methods of reinforced concrete construction, because by constructing at specialized off-site fabrication facilities it avoids tying rebar and constructing forms on-site.[2] Because of the rapid construction time, the cost of large-scale projects can be significantly decreased when this method is used.

Application

The method is of special interest for rapidly constructing nuclear power plants, which use large reinforced concrete structures, and typically have long construction times, with high costs.[3]


References

  1. "Speedcore – How Does It Work?". American Institute of Steel Construction. 2021. Retrieved 14 March 2021.
  2. Nuclear Power Engineering Section – IAEA (April 2004). IAEA-TECDOC-1390 – Construction and commissioning experience of evolutionary water-cooled nuclear power plants (PDF) (Report). International Atomic Energy Agency. Retrieved 14 March 2021.
  3. "How Does It Work?". American Institute of Steel Construction. 2021. Retrieved 29 March 2021./

Share this article:

This article uses material from the Wikipedia article Steel_plate_construction, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.