Supplier-furnished_equipment

Supplier-furnished equipment

Supplier-furnished equipment

Add article description


In aviation, when an aircraft is built and delivered, it will come with supplier-furnished equipment (SFE): materials and parts provided by the manufacturer.

The opposite of SFE is buyer-furnished equipment (BFE), which is purchased by the buyer and given to the aircraft manufacturer to be installed before delivery by the manufacturer. BFE includes preferred galley equipment (ovens for example). In many cases, the aircraft is designed to accommodate BFE during the initial engineering phase.

In contrast is buyer-installed equipment (BIE). BIE is when provision is made for specific equipment the buyer will buy and install- e.g., first aid kits and life vests.

References

  • Massimo Motta (2004), Competition policy: theory and practice (7 ed.), Cambridge University Press, ISBN 978-0-521-01691-9, retrieved 2009-07-31

Share this article:

This article uses material from the Wikipedia article Supplier-furnished_equipment, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.