Tower_Gateway_DLR_station

Tower Gateway DLR station

Tower Gateway DLR station

Docklands Light Railway station


Tower Gateway is a Docklands Light Railway (DLR) station in the City of London and is located near the Tower of London and Tower Bridge. It adjoins the tracks to Fenchurch Street station and is located on the site of a former station called Minories. Tower Gateway is within London fare zone 1.

Quick Facts Location, Local authority ...

It is a short walk from both Tower Hill Underground station and Fenchurch Street. Access at street level from the Minories is via escalator, stairs or lift at the western end of the station. A pedestrian crossing connects the station with Tower Hill station, its closest London Underground connection. A narrow secondary staircase entrance at the eastern end of the platform, improved considerably in the early 2000s, descends to Mansell Street. It serves the eastern edge of the City of London financial district and development around St Katharine Docks.

History

The entrance to the station seen in 1988

It was opened in 1987 as the western terminus of the initial DLR system and the station closest to central London.

The underground extension to Bank, which opened in 1991, diverges from the original route between Tower Gateway and Shadwell, the next station to the east. It dives down a steep ramp not far from the eastern end of the platforms, from which it is clearly visible. Tower Gateway is the terminus for the less busy service to Beckton. Journeys to other branches of the DLR normally require a change.

View east from the station after remodelling

In keeping with the DLR's original basic lightweight philosophy, Tower Gateway is a simple elevated terminus. As built it had two tracks and a cross-over. When the extension to Bank opened, its importance was substantially reduced. Before reconstruction it had a fairly narrow central platform, and a single track leading from the main route to a set of points immediately prior to the platforms.

Further major alterations began on 30 June 2008. The station reopened on 2 March 2009, rebuilt as a single-track terminus to enable three-car trains with a platform on each side of the train, one for arriving passengers and the other for departures (the Spanish solution).

Services

The typical off-peak service in trains per hour from Tower Gateway is 6 tph to and from Beckton via Canning Town. Additional services run to and from the station during the peak hours, increasing the service up to 8 tph to and from the station.[8]

More information Preceding station, DLR ...

Future

A Transport Supporting Paper released by the office of the Mayor of London envisages the closure of Tower Gateway DLR station and the branch serving it, with a replacement interchange being provided via a new station on the Bank branch connected to Tower Hill station. The reasoning is given that currently, 90 per cent of DLR City passengers use Bank station, but only 75 per cent of services go there; this would increase service to Bank from 23tph to 30tph, thereby unlocking more capacity on the Bank branch.[9] In exchange, services from Fenchurch Street railway station might move to the current Tower Gateway location.

Connections

London Buses routes 42, 78, 100, 343 and night route N551 serve the station.[10]


References

  1. "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
  2. "Out-of-Station Interchanges" (Microsoft Excel). Transport for London. 2 January 2016. Retrieved 28 August 2016.
  3. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2018. Transport for London. 23 September 2020. Retrieved 9 January 2022.
  4. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Retrieved 9 January 2022.
  5. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 9 January 2022.
  6. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  7. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 20 October 2023.
  8. "Buses from Tower of London" (PDF). TfL. June 2022. Retrieved 20 July 2022.

Share this article:

This article uses material from the Wikipedia article Tower_Gateway_DLR_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.