U.S._Route_29_in_Virginia

U.S. Route 29 in Virginia

U.S. Route 29 in Virginia

Highway in Virginia


U.S. Route 29 (US 29) is a major north–south route in the commonwealth of Virginia. It covers 248.0 miles (399.1 km) from the North Carolina border at the city of Danville to the Key Bridge in Washington DC. US 29 roughly bisects Virginia into eastern and western halves and, along with Interstate 81 (I-81) and US 11 in western Virginia and I-85/I-95 as well as US 1 farther east, provides one of the major north–south routes through the commonwealth.

Quick Facts Route information, Length ...

Since 1928, when the Virginia General Assembly passed Senate Bill 64, much of US 29 in Virginia is known as the Seminole Trail.[2][3] Through Northern Virginia, it is known as the Lee Highway, except in Falls Church, where it acts as the east–west divider for city streets and is called North or South Washington Street, and Arlington, where it was renamed Langston Boulevard in July 2021 in honor of John Mercer Langston.[4] On April 7, 1993, the Virginia General Assembly officially designated the entire length of US 29 from the North Carolina border to the Potomac River as the "29th Infantry Division Memorial Highway" in honor of the 29th Infantry Division, which, along with the 1st Infantry Division, formed the spearhead of the U.S. infantry that landed on the morning of June 6, 1944, on Omaha Beach in Normandy as part of the liberation of France during World War II. In addition, the name of this highway serves to honor many members of the Virginia Army National Guard who serve as part of this National Guard Division today. Signs indicating this designation have been placed periodically on both sides of US 29.

For most of its route through Virginia, US 29 has been constructed to be at least four lanes along its route, with the two short exceptions being where the highway passes through Manassas National Battlefield Park, where it is two lanes wide for approximately three miles (4.8 km), and through Fairfax and Arlington counties, where it is sometimes wider. It can also be six and eight lanes in much of northern Albemarle County.

US 29 in Virginia has 11 bypasses around various cities and towns. These bypasses are around Danville, Chatham, Gretna, HurtAltavista, LynchburgMadison HeightsAmherst, Lovingston, Charlottesville, Madison, Culpeper, Remington, and Warrenton. In addition, I-66 serves for the most part as a bypass of Manassas and also Fairfax and Arlington.

Route description

North Carolina to Lynchburg

US 29 entering Virginia from North Carolina

US 29 enters Virginia in Danville from North Carolina. While US 29 Business (US 29 Bus.) continues into Danville, US 29 joins the Danville Expressway and US 58 around the east side of Danville, entering Pittsylvania County and remerging with the business route north of town in Blairs. The interchange where US 29 joins US 58 has ramps that enter North Carolina and ramps that enter Virginia, complete with welcome signs from each state. There is a cloverleaf ramp that dips into North Carolina from Virginia and then crosses the state lines back into Virginia. Along the southeastern quadrant of the Danville Expressway between the North Carolina US 360, the route is designated as part of unsigned State Route 785 (SR 785) for 7.39 miles (11.89 km).[5] Created c.2000, SR 785 is numbered in contradiction to the conventional system of numbering in the state, where primary routes are numbered less than 600 and secondary routes at or above this number. It is numbered as such because it is part of the planned I-785, which will run south along US 29 to I-85 in Greensboro, North Carolina, and is only one of two routes of this type. The other is SR 895 in Richmond for similar reasons.

Lynchburg to Charlottesville

View north along US 29 at US 29 Bus. in Lovingston

US 29 then continues north where it has business routes for Chatham, Gretna, and Hurt while bypassing them before entering Campbell County.

US 29 outside of Gainesville

The next major city is Lynchburg. US 29 joins the US 460 bypass and US 501 east of Lynchburg, splitting from them just before entering Amherst County. US 29 again bypasses Madison Heights and Amherst as an expressway, enters Nelson County, passes the town of Lovingston, and enters into Albemarle County.

Charlottesville to Warrenton

For the next few miles of US 29's route north of Lovingston, it enters mountainous terrain in the far western Piedmont close to the Blue Ridge Mountains. Several miles later, the route then continues north to Charlottesville, intersecting I-64 and bypassing downtown Charlottesville. US 29 rejoins its congested business route just north of downtown, continuing north as a six-lane road through Charlottesville's business district. Past Charlottesville, it converts back to four lanes and continues through Greene and Madison counties and then turns northeast toward Culpeper. US 15 joins US 29 around Culpeper and heads to Warrenton, entering Northern Virginia.

Warrenton to Washington DC

View south along US 29 (Lee Highway) at US 50 (Fairfax Boulevard) and SR 236 (Main Street) in Fairfax

US 29/US 15 is joined by US 17 south of Warrenton in Fauquier County and continues around the town, with US 17 splitting off. US 29/US 15 continues mostly eastward to Gainesville where US 15 splits and US 29 intersects I-66 for the first time. US 29 continues into Fairfax County, where it passes along the boundary of the city of Falls Church, where the road has two different names. The portion of the street running northbound is located in the city of Falls Church is called Washington Boulevard and has different street addresses than the other side running southbound in Fairfax County, where it is named the Lee Highway. The road continues into Arlington, having intersected I-66 five more times before crossing into Washington DC.

History

US 29 originated in 1931 as a replacement of US 170 from Danville to Lynchburg. It was then added to SR 18 between Lynchburg and Charlottesville and to SR 28 between Charlottesville and Culpeper. The route originally ended at US 15 in Culpeper. In 1934, US 29 was extended to run concurrently with US 15 to Warrenton, and with US 211 to Washington DC (US 211 now ends at US 29 Bus. in Warrenton).[6]

The portion of what is now US 29 from the North Carolina state line to Warrenton was named the Seminole Trail by an act of the Virginia General Assembly on February 16, 1928. Although it was apparently not part of the National Auto Trails initiative early in the 20th century, the Seminole Trail is believed to have originated as part of an effort to promote the road as a through route to Florida, home of the Native American Seminole tribe. Many road maps of the 1930s and 1940s list the Seminole Trail on highways in Virginia, the Carolinas, Georgia, and ultimately Florida.[7]

In an October 4, 2006, meeting of the Albemarle County Board of Supervisors, the University of Virginia athletic department and basketball coach Dave Leitao suggested that Seminole Trail in Charlottesville should be renamed Cavalier Way. The board did not act on this suggestion.[8]

Gainesville Interchange

The Gainesville Interchange project took place at the interchange between the Lee Highway (US 29) and I-66 at the junction with Linton Hall Road (SR 619) starting in July 2011, with board planning on it dating back to 2006. The project was worth $230 million (equivalent to $307 million in 2023[9]) and included interchanges at many other heavily traveled roads in the area due to the rapid growth in development in Gainesville and Haymarket, along with it being a major area drivers departure off of I-66 to travel towards other major cities along the Lee Highway, such as Charlottesville. The reasoning for this inclusion of other interchanges is because of the lack of road development to accommodate the new heavy traffic in the area. The plan included a single-point urban interchange design and bridges over train tracks to ease traffic flow on the Lee Highway onto I-66. The Lee Highway was also widened around the interchange to combat this issue. What was once a two-lane country road is now a four-lane suburban highway. Land was acquired by the Virginia Department of Transportation (VDOT) at the intersection of US 29 and Linton Hall Road/SR 619. The entire project was completed and opened to the general public on July 9, 2015.

Charlottesville Interchange (Rio Road)

The Charlottesville Interchange project took place at the intersection of US 29 and Rio Road/SR 631, with construction starting in mid-2015 and ending in December 2016.[10] A diamond interchange was built, with two lanes from each direction of US 29, deemed the "local lanes", exiting from main traffic and meeting Rio Road at a traffic signal. The project cost $69.7 million (equivalent to $86.8 million in 2023[9]).

Lynchburg Interchange

The Lynchburg Interchange project took place at the intersection of US 29/US 460/US 501 and Odd Fellows Road, with construction starting in January 2016 and ending in August 2018. A diamond interchange was constructed at a cost of about $30 million (equivalent to $35.9 million in 2023[9]). The interchange was built to reduce congestion on Candlers Mountain Drive/US 501 and to make access to Mayflower Drive/SR 128 easier.[11][12] As part of the construction, roundabouts were constructed on Odd Fellows Road at its intersection with Mayflower Drive, west of the interchange, and Top Ridge Road, east of the interchange.[13]

Charlottesville Bypass

A western US 29 bypass around Charlottesville was originally proposed in 1979. Engineering and environmental work on the project began in late 1984, and the location was approved by the Commonwealth Transportation Board in 1990.

This bridge carried US 29 across the Buffalo River until its destruction by Hurricane Camille in 1969.

Acquisition of right-of-way for the project began in 1991 and continued until 2001. No additional right-of-way has been purchased since then. VDOT owns 36 properties that are currently leased and occupied.

The bypass was projected to be 6.2 miles (10.0 km) long, from the US 250 bypass to current US 29 north of the South Fork Rivanna River. It would have been two lanes in each direction with no other exits, to decrease possible interruption of commercial and residential growth in the area.

In 1998, a lawsuit was filed challenging the project, alleging that the environmental impact review of the project violated the National Environmental Policy Act (NEPA). In 2001, the federal court ruled in favor of VDOT on the suit but required the agency to complete a supplemental environmental impact statement (EIS) addressing the road's impacts on the South Fork Rivanna Reservoir and the mitigation to minimize those impacts. That document was completed and accepted by the Federal Highway Administration (FHWA) in 2003.

In 1996, the Charlottesville-Albemarle Metropolitan Planning Organization (MPO) inserted language into its Transportation Improvement Program that prevented additional funds from being allocated to construction of the Western Bypass. That language was removed by the MPO Policy Board in July 2011.[14]

All activities on the US 29 Charlottesville Bypass project were suspended in March 2014 following notification from the FHWA that a new supplemental EIS would be required before the environmental process could be completed. The new supplemental EIS was required due to the history of litigation and controversy associated with the project.[15]

Future

Charlottesville Interchange (Hydraulic Road)

The Charlottesville City Council voted on May 6, 2018, to add a long-range development plan for a diamond interchange at the intersection of US 29 and Hydraulic Road/SR 743 at an estimated cost of $63 million to $80 million (equivalent to $75.3 million to $95.6 million in 2023[9]).[16]

Major intersections

All exits are unnumbered.

More information County, Location ...

See also


References

  1. "2010 Traffic Data". Virginia Department of Transportation. 2010. Archived from the original on December 3, 2011. Retrieved January 9, 2012.
  2. Dave McNair (October 9, 2006). "Route 29 to become Wahoo Highway?". The Hook. Archived from the original on April 3, 2019. Retrieved April 3, 2019.
  3. Answerman (February 22, 2004). "Decoding MD + VA + DC". The Washington Post. Archived from the original on February 19, 2021. Retrieved August 11, 2020.
  4. Sophia Barnes (July 17, 2021). "Lee Highway in Arlington County Renamed Langston Boulevard". NBC 4 Washington. Archived from the original on November 1, 2021. Retrieved November 1, 2021.
  5. "2005 Virginia Department of Transportation Jurisdiction Report - Daily Traffic Volume Estimates - Pittsylvania County" (PDF). Archived (PDF) from the original on January 16, 2010. Retrieved January 9, 2011. (483 KiB)
  6. "US 29". www.vahighways.com. Archived from the original on October 21, 2019. Retrieved August 9, 2019.
  7. "US 29 through Virginia - The Seminole Trail". Archived from the original on August 9, 2019. Retrieved August 9, 2019.
  8. "Charlottesville Tomorrow News Center: Seminole Trail becomes Cavalier Way?". cvilletomorrow.typepad.com. Archived from the original on August 9, 2019. Retrieved August 9, 2019.
  9. Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  10. "Route 29 Solutions: Rio Road Intersection". www.route29solutions.org. Archived from the original on August 7, 2019. Retrieved August 7, 2019.
  11. "NEW US 29/460 INTERCHANGE at ODD FELLOWS ROAD to OPEN - Newsroom | Virginia Department of Transportation". virginiadot.org. Archived from the original on August 24, 2019. Retrieved August 24, 2019.
  12. "PHOTOS: Odd Fellows Road interchange nearly ready for traffic". NewsAdvance.com. Archived from the original on August 24, 2019. Retrieved August 24, 2019.
  13. Gillis, Casey (August 8, 2018). "Odd Fellows Road, U.S. 460 interchange to open Thursday morning". The News and Advance. Archived from the original on August 24, 2019. Retrieved August 24, 2019.
  14. "Route 29 Charlottesville Bypass". Archived from the original on August 12, 2014. Retrieved August 8, 2014.
  15. "Archived copy" (PDF). Archived from the original (PDF) on March 4, 2016. Retrieved August 8, 2014.{{cite web}}: CS1 maint: archived copy as title (link)
  16. "Route 29: Hydraulic Road Intersection". www.route29solutions.org. Archived from the original on August 7, 2019. Retrieved August 9, 2019.
KML is from Wikidata
U.S. Route 29
Previous state:
North Carolina
Virginia Next state:
District of Columbia

Share this article:

This article uses material from the Wikipedia article U.S._Route_29_in_Virginia, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.