| This section needs additional citations for verification. (February 2021) |
Wenatchee Valley College originally opened as a private college in 1939,[2] supported by donations from 51 area residents. In 1941, Wenatchee Valley College was adopted into the state public education system. Originally, classes were held on the third floor of the original Wenatchee High School situated at King and Idaho streets.
In 1949, the college moved to the home of A. Z. Wells on five acres (2 ha) of land along Fifth Street. The home was hand-built, consisting of stones from the Columbia River, and was modeled with castle style turrets. Wells House held all classrooms and offices, until additional buildings could be constructed allowing the Wells House to become a dormitory.
WVC was able to purchase land from neighboring land owners, expanding the campus to its current 56 acres (23 ha). Wells House still stands on the WVC Main Campus, although the building is owned by the Wells House Committee, and the Wenatchee Valley Museum currently maintains the mansion.
Community College District #15 was formed in 1967, expanding WVC's service area to include Chelan, Douglas, and Okanogan counties. A satellite campus was set up in Omak in a former hospital building, until the Omak campus was built in the mid-1970s near downtown Omak.[3]
A large section of the WVC Main Campus in Wenatchee expanded in the late 2000s and early-mid 2010s. The college added parking to accommodate additional students. A new Central Washington University extension building was constructed west of Batjer Hall and north of Sexton Hall. Anderson Hall was demolished to make way for the new 82,000-square-foot (7,600 m2) Wenatchi Hall, which opened in September 2007. Wenatchi Hall provides expanded room for Allied Health and Safety programs, science, math and other courses. The Wenatchee Valley Foundation raised funds to help finance the construction of the Music and Art Center, which opened near the Wells House in the fall of 2012. The MAC houses "The Grove" recital hall and the MAC Gallery as well as rehearsal halls, computerized music classrooms, recording studios, a sculpture studio, and four 2-story art studios with window walls facing north. In the spring of 2015, students voted to assess themselves a fee to build a new rec center which is expected to be completed during the summer of 2017. In 2019, Wenatchee Valley College is going to tear down parts of Wells Hall and renovate the building.