The Xingu-Estreito UHVDC transmission line is a 2076 km long 800 kV[1] high-voltage direct current transmission line in Brazil between the Xingu substation at the city of Anapu in the Pará state, 17 km from the Belo Monte Dam, and the Estreito substation at the city of Ibiraci in the Minas Gerais state.[2] It was inaugurated 21 December 2017.[3]

Quick Facts Location, Country ...

See also


References

  1. "Primeiro bipolo de transmissão de ±800 kV UHVDC entra em operação com dois meses de antecedência" [First ±800 kV UHVDC bipole starts operation two months early] (in Portuguese). 2017-12-14. Retrieved 2017-12-21.
  2. "Relatório de Impacto Ambiental - Linha de Transmissão CC ±800 kV Xingu / Estreito" [Environmental impact statement - ±800 kV Xingu / Estreito DC Transmission Line] (PDF) (in Portuguese). December 2014. Retrieved 2017-12-21.



Share this article:

This article uses material from the Wikipedia article Xingu-Estreito_HVDC_transmission_line, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.