Yangon_International_Airport

Yangon International Airport

Yangon International Airport

Airport serving Yangon, Myanmar


Yangon International Airport (Burmese: ရန်ကုန်အပြည်ပြည်ဆိုင်ရာလေဆိပ်; MLCTS: rankun apranyprany hcuingra lehcip [jàɴɡòʊɰ̃ əpjìpjì sʰàɪɴjà lèzeɪʔ]) (IATA: RGN, ICAO: VYYY) is the primary and busiest international airport of Myanmar. The airport is located in Mingaladon, 15 kilometres (9.3 mi) north of central Yangon. All ten Myanmar carriers and about 30 international airlines operate at Yangon International Airport. The airport is also colloquially known as Mingaladon Airport due to its location.

Quick Facts Yangon International Airport ရန်ကုန်အပြည်ပြည်ဆိုင်ရာလေဆိပ်, Summary ...

History

During World War II, the airfield was called RAF Mingaladon and served as an operating base for fighter aircraft such as:

There was also a Communication Flight of the Burma Volunteer Air Force equipped with Tiger Moths and Westland Lysanders and anti-aircraft support for the airfield was provided by members of the 12th Burma Rifles.

Mingaladon was then used by the Japanese, and Japanese bombers based in Bangkok were moved forward to Mingaladon when there was a full moon. The British at the Wireless Experimental Centre in Delhi had decrypted BULBUL, the IJA air-to-ground code, and could predict Japanese air raids. On one occasion Allied nightfighters "got the lot and all night we could hear Mingaladon air base calling for its lost children".[2]

Additional units;

After World War II, Yangon Airport was built on the site of the former RAF Mingaladon in 1947 by the Calcutta Metropolitan Airports Authority. Once regarded as the best in Southeast Asia and the primary airport serving that region, the airport fell into disrepair and remained that way for decades, as new super hubs like Singapore Changi Airport, Kuala Lumpur Sepang, Bangkok Suvarnabhumi and Jakarta Soekarno-Hatta were built and superseded Yangon's facilities.

In November 2012, Condor began flying seasonally to Frankfurt with Boeing 767s. The outbound flight from Yangon made a stop in Phuket, but the inbound one was direct.[6][7] The airline cut the route at the end of the first season.[8] Airport capacity was boosted to 6 million passengers per year in early 2016.[citation needed] Currently, there are plans to build a new, larger airport, Hanthawaddy International Airport, on a much larger site and somewhat away from Yangon.[citation needed]

Modernization

A modernization program was launched in April 2003 and resulted in a new terminal and an extended 3414 m runway.[9]

Designed by the Airport Development Division of CPG Corporation of Singapore, a new terminal was constructed at a cost of US$13.3 million by Asia World.[10] It can handle 900 arriving and 900 departing passengers simultaneously.[11] The design meets IATA service standards and complies with ICAO safety and security standards at a cost of SG$30 million. Other notable features include:

  • Separate floors for arriving and departing passengers to lessen congestion
  • Automated baggage handling system with an integrated check-in system
  • Four air bridges, capable of handling four Boeing 747s
  • Special lounges for use by government officials and business people
  • A two-story parking garage with spaces for 340 vehicles

In June 2011, the government announced plans to expand the airport by 40% and increase its capacity from 2.7 million passengers to 3.8 million passengers annually.[12] The airport was already over its annual capacity of 2.7 million passengers, having accepted 3.1 million in 2012[13] and 4 million in 2014.[14] To fulfill this increased demand, new international and domestic terminals are being constructed and are expected to be finished end of 2016. After upgrading, Yangon International Airport will be able to service 6 million passengers annually.[14]

In 2013, a contract worth $150 million was awarded to a consortium led by an affiliate of Asia World to construct a new domestic terminal and expansion of airport apron.[13]

The new international terminal (T1) opened in March 2016, with the previously existing international terminal being designated as T2. The new domestic terminal (T3) opened on 5 December 2016.

Terminals

Check-in desks in Terminal 2

Terminal 1

Terminal 1

In August 2014, the old domestic terminal was demolished and construction began for the new six-story Terminal 1 which will handle international flights. The opening ceremony was held on 12 March 2016. After the opening of Terminal 1, the airport can handle 6 million passengers annually, as opposed to 2.7 million before.

Terminal 1

Terminal 2

Terminal 2

After the opening of Terminal 1, the former International Terminal was renamed "Terminal 2." The building was designed by the CPG Corporation of Singapore and constructed by the Asia World Company costing US$13.3 million. The terminal can handle 900 arriving passengers and 900 departing passengers at the same time. Terminal 2 was closed in July 2018 to undergo extensive renovation. All international flights now operate from Terminal 1.

Terminal 3

Terminal 3 in 2017

Terminal 3, which is used for domestic flights, opened on 5 December 2016, replacing the old domestic terminal which was demolished in August 2014.[15]

Guard of Honour Building (VIP Terminal)

The former VIP terminal was temporarily used as the domestic terminal until Terminal 3 was completed. The Guard of Honour Building has been demolished to make way for a connector between Terminals 1 and 2.

Airlines and destinations

Passenger

More information Airlines, Destinations ...

Cargo

More information Airlines, Destinations ...

Statistics

The Courtyard (Terminal 2) seen inside from the airport departure lounge
The departure lounge - Gate 1 (Terminal 2)

Top destinations

More information Rank, Destinations ...

Traffic by calendar year

More information Passengers, Change from previous year ...

Accidents and incidents

  • On 25 March 1978, Fokker F-27 Friendship 200 XY-ADK lost height and crashed into a paddy field just after takeoff from Mingaladon Airport, killing all 48 people on board.[35]
  • On 27 January 1998, a Myanma Airways Fokker F27 crashed while taking off from Yangon, Myanmar, killing 16 of the 45 people on board.
  • On 29 January 2017, U Ko Ni, a constitutional lawyer and advisor to Aung San Suu Kyi was assassinated outside of Gate 6.
  • On 8 May 2019, Biman Bangladesh Airlines Flight 60, operating the Dhaka-Yangon route by Bombardier Dash-8 Q400, skidded off the runway while landing. Nobody was injured critically. The 33 people, including the pilot, co-pilot and the passengers, suffered minor injuries.[36]
  • On 2 August 2019 a Golden Myanmar Airlines Y5-506 ATR-72-600 departed from Mandalay to Yangon airport, and the landing gear of nose wheel broke when it landed on the runway of Yangon International Airport. No significant damage or injuries were reported in the incident.[37]

Airport shuttle bus


The Yangon Bus Service (YBS) provides airport shuttle bus line that stop at 13 bus stops between Yangon International Airport and Yangon Central Railway Station. The buses make stops at Yangon International Airport, 8 Mile, Nawade, Kaba-Aye Pagoda, Lanni, Hanmithit, Shwegondine, Bahan 3rd Street, Kyauktaing, Yauklan and Sule Pagoda. Stops on the return journey include Sule, Yangon Railway Station, Zoological Gardens, Bahan 3rd Street, Shwegondine, Lanni, Kaba-Aye Pagoda, Nawade, 8 Mile and the airport.[38] The fare is 500 kyats (approximately 15 U.S. cents).

YBS Shuttle Bus

See also


References

Citations

  1. "Built for 20 million MPPA, Yangon International Airport welcomed 5.92 million passengers to round off 2017". Yangon Aerodrome. Archived from the original on 29 August 2018.
  2. Smith, Michael (2000). The Emperor's Codes: Bletchley Park and the breaking of Japan's secret ciphers. London: Bantam Press. pp. 244–246. ISBN 0593-046412.
  3. Lake 1999, p. 129.
  4. Lake 1999, p. 18.
  5. Lake 1999, p. 126.
  6. "Condor to Start Siem Reap and Yangon Service in W12". Airline Route. 19 January 2012. Archived from the original on 21 January 2012. Retrieved 2 September 2023.
  7. Khanna, Rahul (24 September 2012). "Condor to fly to Yangon in November". TTG Asia. Retrieved 2 September 2023.
  8. "Flight plan Winter 2013/14" (PDF). Condor. March 2013. Retrieved 2 September 2023.
  9. "Yangon airport completes runway extension". 28 July 2008. Archived from the original on 15 February 2012.
  10. Aye Sapay Phyu (20 June 2011). "Government reveals plan to expand Yangon International Airport". Myanmar Times. Archived from the original on 21 June 2011. Retrieved 5 March 2012.
  11. "Hohhot airport launches routes to Hong Kong, Yangon". China Daily. Retrieved 26 October 2023.
  12. "Hãng hàng không tư nhân lớn nhất Myanmar sắp có mặt tại Việt Nam" [Myanmar's largest private airline is coming to Vietnam soon]. Bao Giao Thong (in Vietnamese). 19 August 2022.
  13. "MAI Suspends Mandalay – Novosibirsk in April 2024". AeroRoutes. 5 April 2024. Retrieved 6 April 2024.
  14. Liu, Jim. "Myanmar Airways International adds Hangzhou service in 3Q19". Routesonline. Retrieved 11 July 2019.
  15. "Accident description". Aviation Safety Network. Retrieved 13 March 2016.
  16. "YBS Airport Shuttle commences in Yangon - Global New Light Of Myanmar". www.globalnewlightofmyanmar.com. Archived from the original on 6 July 2018. Retrieved 6 July 2018.{{cite web}}: CS1 maint: unfit URL (link)

Bibliography


Share this article:

This article uses material from the Wikipedia article Yangon_International_Airport, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.