Pre-Commissioning_Unit

Pre-Commissioning Unit

Pre-Commissioning Unit

Add article description


Pre-commissioning unit (PRECOMUNIT or PCU) is a designation used by the United States Navy to describe vessels under construction prior to their official commissioning.[1] For example, prior to her commissioning, USS Gerald R. Ford (CVN 78) had been described by the Navy as " PCU Gerald R. Ford (CVN 78)".[1][2] Such descriptions can appear in the media as well.[3][4] "PCU" is a temporary, descriptive term, and is not a ship prefix or a part of the ship's official name. Until they are commissioned, U.S. Navy vessels are officially identified by their given name and hull number, such as Gerald R. Ford (CVN 78).[5]

A "PCU" is also the entity that the ships staff is assigned to for training while the ship is being constructed and fitted-out. Prior to reporting to the ship, sailors will report to a PCU at one of two fleet training centers, located at either Naval Station Norfolk or Naval Base San Diego.[6]

See also


References

  1. "PCU Gerald R. Ford (CVN 78) Welcomes 60 New Crew Members" (Press release). Navy News Service. 6 June 2013. NNS130606-12. Retrieved 24 July 2016.
  2. "Ship Naming in the United States Navy". Naval History and Heritage Command. Retrieved 9 January 2020. The prefix "USS," meaning "United States Ship," is used in official documents to identify a commissioned ship of the Navy. It applies to a ship while she is in commission. Before commissioning, or after decommissioning, she is referred to by name, with no prefix.

Share this article:

This article uses material from the Wikipedia article Pre-Commissioning_Unit, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.