Auburn_Maintenance_Centre

Auburn Maintenance Centre

Auburn Maintenance Centre

Train Depot


The Auburn Maintenance Centre is a train depot operated by Downer Rail responsible for the maintenance of the Sydney Trains A, B and M set fleets.

Quick Facts Location, Characteristics ...

History

As part of the contract to build and maintain the Sydney Trains A sets, John Holland built a depot on the site of the former Clyde Marshalling Yards adjacent to the MainTrain facility.[1][2][3] It was opened by Minister for Transport John Robertson on 24 July 2010.[4]

On 20 September 2014, an 11 road stabling facility was established to the south-east of the facility. Provision has been made for an extra five roads.[5][6] In February 2017, it was revealed that subsidence had occurred underneath the depot after plastic cells had failed. Remediation costs have been estimated as high as $70 million.[7][8]

During 2018, maintenance of the Sydney Trains M set fleet was moved to Auburn from Eveleigh Railway Workshops.[citation needed]

Description

The maintenance centre building has seven roads. It has stabling facilities on ether side with the whole facility stretching for two kilometres.[2]

Maps

Auburn Maintenance Centre.
The Sydney Trains maintenance centres. Auburn is in grey.

Persons of Interest

De Voung : Former BMX Bandits stunt rider


References

  1. John Holland awarded Auburn Maintenance Facility contract Railway Digest March 2007 page 9
  2. The Centre Archived 27 February 2015 at the Wayback Machine Reliance Rail
  3. Signaling & infrastructure Railway Digest November 2014 page 42
  4. Redmediation work required at Sydney's Waratah Maintenance Centre Railway Digest April 2017 page 5


Share this article:

This article uses material from the Wikipedia article Auburn_Maintenance_Centre, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.