Batinah_Expressway

Batinah Expressway

Batinah Expressway

Road in Oman


The Batinah Expressway is a 256 km 8-lane highway in Oman that connects the Muscat Expressway (a relief road in Muscat, the capital of Oman[1]) at Halban with the United Arab Emirates border at Khatmat Malaha.[2] It opened on 6 May 2018.[3]

Quick Facts Route information, Length ...

History

Batinah Expressway was opened to the public on 6 May 2018.[4] One of the biggest road infrastructure projects in the Sultanate of Oman, it consists of 1,106 concrete channels, 25 bridges crossing wadis, 17 overhead bridges, 12 tunnels and other technical paraphernalia to overcome terrestrial obstacles. The Expressway has four lanes in each direction and was completed in a time span of six years, built at a cost of RO 800 million.

See also


References

  1. "Muscat Expressway: New Expressway Alleviates Congestion and Accommodates Future Growth". Parsons Corporation. Archived from the original on 2016-09-17. Retrieved 1 June 2017.
  2. "Batinah Expressway opened". Times of Oman. May 22, 2017. It is the largest road network project in the history of Sultanate of Oman
  3. "Al Batinah Expressway opened to traffic". Times of Oman. 7 May 2018. Retrieved 2023-04-02.
  4. "Al Batinah Expressway opened to traffic". Times of Oman. 7 May 2018. Retrieved 2023-04-02.



Share this article:

This article uses material from the Wikipedia article Batinah_Expressway, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.