Railway initiatives around Bellheim
Originally the administration of the Circle of the Rhine (Rheinkreis), which was part of Bavaria, planned that its first railway line would be first in the north–south direction from Rheinschanze via Lauterbourg to Strasbourg, which would compete with the Mannheim–Basel railway proposed by Baden. However, instead it was decided to build the Palatine Ludwig Railway (Pfälzische Ludwigsbahn, Ludwigshafen–Bexbach), which was opened in the period from 1847 to 1849. In the meantime, discussions took place as to whether a line from Neustadt via Landau to Wissembourg or a line along the Rhine via Speyer, Germersheim and Wörth was more urgent and desirable. Since the military preferred a route on the edge of the Palatinate Forest (Pfälzerwald), this was built in the form of the Maximilian Railway between Neustadt and Wissembourg.
The line to Speyer, which was opened in 1847, was extended to Germersheim in 1864. As a result, plans were made to establish a strategic railway between the fortresses of Germersheim and Landau. Of a total of four options, two would have run south of the Queich via Offenbach. The city council of Landau, in particular, supported a route through Bellheim. Nevertheless, the line was built north of the river, passing through Westheim, Oberlustadt and Niederlustadt and Zeiskam.
In 1863 and 1864, a local committee from the surrounding community of Rülzheim, which included representatives of Bellheim, campaigned to extend the line that ended in Germersheim to Wörth. Subsequently, its first plan was produced, showing a route that ran via Bellheim.
Further development
The station became part of the area of the Reichsbahndirektion (Reichsbahn railway division) of Ludwigshafen after the founding of the Deutsche Reichsbahn in 1922. During the dissolution of the railway division of Ludwigshafen, responsibility for it was transferred to the railway division of Mainz on 1 May 1937.
Deutsche Bundesbahn (DB), which was responsible for railway operations from 1949, assigned the station to the railway division of Mainz, which was responsible for all railway lines within the newly created state of Rhineland-Palatinate. In the course of the staged dissolution of the railway division of Mainz from 1 August 1971, its counterpart in Karlsruhe took responsibility for the station. The station had been downgraded to a halt in the 1990s. The station became part of the Karlsruhe Stadtbahn in 2010. This involved the replacement of the island platform by a side platform.