Bhanga_railway_station

Bhanga railway station

Bhanga railway station

Railway station in Faridpur, Bangladesh


Bhanga railway station is a railway station located in Bhanga Upazila, Faridpur District, Dhaka division, Bangladesh.

Quick Facts General information, Location ...

History

Railway line

Rajbari to Faridpur line was built in 1899. Nine railway stations situated in the railway line were closed on 16 September 1990. The railway line from Pachuria to Faridpur was closed by government on 26 March 1996. But that was not the first time the line was closed. It was stopped before 6 years of the second direction of closure. In 2013, Sheikh Hasina, prime minister of Bangladesh, ordered the reconstruction of the railway line.[1] The Faridpur–Bhanga part of the Pachuria–Bhanga line was completed in 2019.[2][3]

Station

Bhanga railway station was inaugurated and opened on 24 January 2020 by Md. Nurul Islam Sujon, railway minister of the country.[4]


References

  1. "পাচুড়িয়া-ভাঙ্গা রেললাইন জুলাইয়ে চালু হবে". Bhorer Kagoj (in Bengali). Archived from the original on 25 February 2020. Retrieved 25 February 2020.

Share this article:

This article uses material from the Wikipedia article Bhanga_railway_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.