British_Rail_Class_717

British Rail Class 717

British Rail Class 717

Trains on services into Moorgate, London


The British Rail Class 717 Desiro City[9] is an electric multiple unit passenger train built by Siemens Mobility, currently operated by Govia Thameslink Railway on its Great Northern Hertford Loop and Welwyn stopping routes. Built to replace Class 313 trains on services into Moorgate, a total of 25 six-car units began entering regular service from March 2019.[10][11] The units are stylistically similar to the Class 700s (in use with Thameslink) and the Class 707s (in use with Southeastern and South Western Railway.)

Quick Facts British Rail Class 717 Desiro City, In service ...

History

Upon winning the Thameslink, Southern and Great Northern franchise, Govia Thameslink Railway (GTR) announced that it would seek to procure new trains totalling 150 vehicles to replace the then-40-year-old Class 313 units operating on services to and from Moorgate.[12] In December 2015, GTR announced that it had selected Siemens to provide this new fleet, originally designated Class 713,[4] as a follow-on order from the main Class 700 order, with entry into service expected from March 2019.[13] The order was finalised in February 2016.[14][15]

A significant difference between Class 717s and the earlier Class 700s is the provision of fold-down emergency doors at both ends of each train. These are required for emergency evacuation of passengers[9] while inside the deep-level Moorgate tunnels.[16]

Siemens began testing the Class 717 units in Germany during June 2018.[17]

Operation

The first unit operated a single preview service in late September 2018, with gradual introduction from the spring of 2019.[18] The final Class 313 service on Great Northern ran in September 2019, completing the fleet replacement by Class 717 units.[19]

In-cab signalling

In September 2021, the installation of European Train Control System (ETCS) on the Class 717 fleet was successfully tested on the Thameslink 'core' route between St Pancras International and Blackfriars stations in central London.[20] The success of the test allowed Govia Thameslink Railway to work towards enabling the use of ETCS in passenger service on the Northern City Line in November 2023, which will be followed by the decommissioning and removal of the existing conventional signalling system in 2024.[21] Further testing and implementation on other lines and routes is planned.[22]

In October 2022, testing started for the upgrade of the ETCS baseline from B3MR1 to B3R2, with dynamic testing planned for December 2023.

Environment

Class 717 trains generate electricity through regenerative braking.[23] The trains are also 20% lighter than their predecessors, making them more energy efficient.[24]

Fleet details

More information Class, Operator ...

Illustration

Side-profile illustration of a Great Northern Class 717 unit

Notes

  1. Tripcocks were removed in May 2023 following the May 2022 completion of the Northern City Line tripcock-to-TPWS conversion programme.[7]

References

  1. Sherratt, P., ed. (2023). "ROSCO Fleets". Modern Railways: Review 2023. Stamford: Key Publishing. pp. 18–19. ISBN 978-1-80282-569-5.
  2. Desiro City Electrical Multiple Unit for Thameslink (PDF) (2014 ed.). Berlin: Siemens Mobility. Archived (PDF) from the original on 29 October 2020.
  3. SF7000: Bogie-platform for electrical multiple units (PDF) (05/2020 ed.). Graz: Siemens Mobility Austria. Art. No. MORS-B10032-00. Archived (PDF) from the original on 30 September 2020.
  4. Desiro City - Evolution in Motion (PDF) (2016 ed.). München: Siemens Mobility. Archived (PDF) from the original on 20 November 2020.
  5. "Digital signalling for East Coast main line tested on Thameslink". Rail Insider. Business Daily Group. 21 September 2021. Retrieved 20 November 2021.
  6. "Class 717 Production Passes Halfway". Modern Railways. Stamford: Key Publishing. 24 May 2018. Retrieved 18 October 2022.
  7. Clinnick, R. (April 2023). "Modernising the Moorgate branch". Rail Express. No. 323. Horncastle: Mortons Media Group. p. 87. ISSN 1362-234X.
  8. Desiro City Class 717 Electrical Multiple Units for Govia Thameslink Railway (PDF) (2018 ed.). München: Siemens Mobility. Art. No. MOML-T10055-00-7600. Archived from the original (PDF) on 30 November 2020.
  9. Clinnick, R. (8 June 2016). "New Govia Thameslink Railway trains to be Class 717s". Rail Magazine. Peterborough: Bauer Consumer Media. Retrieved 9 June 2016.
  10. Clinnick, R. (25 March 2019). "Great Northern Class 717s finally enter passenger service". Rail Magazine. Peterborough: Bauer Consumer Media. Retrieved 12 June 2023.
  11. "New trains for Moorgate services". Great Northern. Newcastle upon Tyne: Govia Thameslink Railway. Archived from the original on 27 March 2019.
  12. "Govia wins TSGN franchise, beating FirstGroup". Rail Technology Magazine. Manchester: Cognitive Publishing. Retrieved 12 June 2023.
  13. "Siemens selected to supply Moorgate suburban EMU fleet". Railway Gazette. Sutton: DVV Media International. Archived from the original on 19 June 2016.
  14. "GTR strikes £200m-plus deal for new train fleet serving City of London". Frimley: Siemens plc. 18 February 2016. Retrieved 7 September 2020.
  15. Cox, K. (15 December 2017). "In follow-up to the information session of Wednesday 6 December 2017" (PDF). Letter to Mark Prisk MP. London: Govia Thameslink Railway. Archived from the original (PDF) on 19 February 2018.
  16. "Module LNE1, LOR 105 Seq 001". London North Eastern Route Sectional Appendix. Network Rail. 3 June 2017. p. 41. NR30018/02.
  17. Boyd-Hope, G. (30 June 2018). "Testing begins on GTR's new Class 717s in Germany". Horncastle: Mortons Media Group. Retrieved 12 June 2023.
  18. Clinnick, R. (1 October 2018). "New Great Northern Class 717 carries first passengers". Rail Magazine. Peterborough: Bauer Consumer Media. Retrieved 12 June 2023.
  19. Clinnick, R. (2 October 2019). "1,514 brand new vehicles as GTR completes £2 billion fleet cascade". Rail Magazine. Peterborough: Bauer Consumer Media. Retrieved 12 May 2020.
  20. "Great Northern train tests successfully for first stage of East Coast Digital Programme". London: Network Rail. 21 September 2021. Retrieved 18 October 2022.
  21. White, C. (23 September 2021). "Great Northern Class 717 completes tests with in-cab signalling in London". Rail Advent. Retrieved 5 March 2022.
  22. Wordsworth, N. (8 October 2020). "Great Northern trains save energy and reduce carbon". RailInsider. Business Daily Group. Retrieved 5 March 2022.
  23. Holden, A. (11 October 2020). "4,000 tonnes of CO2 emissions saved by Great Northern trains". RailAdvent. Retrieved 5 March 2022.

Share this article:

This article uses material from the Wikipedia article British_Rail_Class_717, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.