The Fenton Wind Farm is a 205.5 megawatt[1] wind energy project built by enXco (now EDF Renewables[2]), that became operational in the second half of 2007. The $385-million project is near Chandler, Minnesota, United States, on a site that encompasses Murray and Nobles counties and consists of 137 GE 1.5 MW wind turbines.[3]

Power generated by the Fenton Wind Energy project will be sold to Northern States Power, a subsidiary of Minneapolis-based Xcel Energy.[3]

The land was and is subject to archeological surveys as it is situated in a culturally sensitive area previously inhabited by the Dakota.[1]

Project history

Fenton wind farm at sunrise

Apr 2006 - Permit issued[4]

Jan 2007 - Financing of project secured[5]

Sep 2007 - Construction begins

Oct 2007 - Scheduled completion

See also


References

  1. "enXco Closes Financing on Minnesota 205 MW Wind Farm". Archived from the original on 2007-10-08. Retrieved 2007-06-20.
  2. "Project Docket". Minnesota Public Utilities Commission. Archived from the original on 2007-06-12.
  3. "Financing Raised for Fenton Wind Farm in MN". Associated Construction Publications. Archived from the original on 2007-09-28.