Istanbul_Waste_Power_Plant

Istanbul Waste Power Plant

Istanbul Waste Power Plant

Power station in Turkey


Istanbul Waste Power Plant (Turkish: İBB Atık Yakma ve Enerji Ürestim Tesisi) is a waste-to-energy facility in the Eyüp district of Istanbul near the Odayeri landfill,[1] Turkey, using waste incineration. Opened in 2021 it is owned by the Istanbul Metropolitan Municipality (İBB) and operated by İstanbul Environmental Management Co. (İSTAÇ).[2] It is Turkey's first power plant of this type.[3] Project development started in 2011 with a grant from the United States Trade Development Agency (USTDA) which involved first a Definitional Mission and subsequently a detailed Feasibility Assessment.[4][5]

Quick Facts Official name, Country ...

Overview

The waste-to-energy plant was built by a consortium of the Swiss Hitachi Zosen Inova and the Turkish Makyol. Construction began on 16 September 2017.[6][7] Located in the Işıklar (formerly Kısırmandıra) neighborhood of the Eyüp district of Istanbul,[8] it was opened on 26 November 2021.[2][6] The plant is owned by the Istanbul Metropolitan Municipality (İBB) and operated by İstanbul Environmental Management Co. (İSTAÇ), a subsidiary of the Metropolitan Municipality.[6] It is Turkey's first waste-to-energy facility.[3][6] Kömürcüoda on the Asia side also generates electricity.

Characteristics

The plant is capable of incinerating 3,000 tons of waste daily, 15% of Istanbul's daily domestic waste.[2][6] The three incinerators each of 1,000 tons capacity reach about 850–1,100 °C (1,560–2,010 °F).[7][8] It can generate 78 MW⋅h electrical energy and 175 MW⋅h thermal energy. The generated electricity is equivalent to the needs of nearly 1.4 million people. A reduction of greenhouse gas emissions amounting to 1.38 million tons can be achieved, which is the amount of exhaust gas emission of about 700.000 vehicles.[2][9] In 2022 the nearby Odayeri landfill was estimated by Climate Trace to have emitted over 6 million tonnes of CO2eq.[10] 90 people are employed in the facility. The plant saves a waste landfill storage area of 100 ha (250 acres).[7]


References

  1. Todorović, Igor (2022-02-15). "Istanbul expands waste-to-energy capacity to cover electricity needs of two million people". Balkan Green Energy News. Retrieved 2023-05-21.
  2. "Atık Yakma ve Enerji Üretim Tesisi" (in Turkish). İstanbul Büyükşehir Belediyesi – Atık Yönetimi Müdürlüğü. 18 June 2018. Retrieved 27 November 2021.
  3. Serbetci, Walter I. (2018). "Feasibility Assessment and Project Development for 3,000 Mtons/Day Istanbul Waste-to-Energy Plant". Proceedings of the 19th Annual Electric Power Conference, Nashville, TN, 2018.
  4. "Türkiye'de ilk: 1,4 Milyon kişinin elektriği evsel atıklardan üretilecek". Cumhuriyet (in Turkish). 25 December 2020. Retrieved 28 November 2021.
  5. "İstanbul Büyükşehir Belediuesi Atık Yakma ve Enerji Üretim resisi Projesi" (PDF) (in Turkish). İstanbul Büyükşehir Belediyesi – Atık Yönetimi Müdürlüğü. Retrieved 28 November 2021.
  6. "Comparison Tool - Climate TRACE". climatetrace.org. Retrieved 2023-12-05.

Share this article:

This article uses material from the Wikipedia article Istanbul_Waste_Power_Plant, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.