County |
km |
Type |
Destination |
Notes |
Győr-Moson-Sopron |
0 |
|
Main road 1 – Győr / M1 / E60 / E75 – Mosonmagyaróvár, towards to Vienna (A), Bratislava (SK) /
Main road 85 – Ikrény /
M1 / E60 / E75 – Budapest and 14 / E575 Vámosszabadi |
The eastern terminus of the expressway.
Kilometrage starting point
Roundabout and interchange junction |
8 |
|
Rábapatona |
|
10 |
|
Lébény, Bezi / Enese, Tét |
|
16 |
|
Kóny / Rábcakapi |
Connecting to petrol station and Truck parking. |
21 |
|
Main road 85 – Csorna |
|
23 |
|
85 / E65 – Mosonmagyaróvár
M85 – Sopron / M86 / E65 Szombathely, towards to Marbor (SLO) |
The northern terminus of the common road with M85-M86 expressways, and E65 route.
The eastern part of Csorna bypass.
The northern terminus of 2x3 lane road. |
|
|
over the Győr–Sopron railway line |
|
25 |
|
over the Pápa–Csorna railway line |
|
27 |
|
M85 – Sopron, Kapuvár
M86 / E65 Szombathely, towards to Marbor (SLO) |
The southern terminus of the common road with M85-M86 expressways, and E65 route.
The southern part of Csorna bypass.
The southern terminus of 2x3 lane road. |
|
|
over the Hegyeshalom–Szombathely railway line |
|
32 |
|
Jobaháza, Farád / Csorna nyugat |
nyugat means West |
40 |
|
Babóti pihenőhely |
parking, WC, and water (petrol station in the future)
pihenőhely means Rest area |
44 |
|
Beled, Hövej / Kapuvár |
|
53 |
|
Fertőd, Fertőendréd |
Connecting to Main road 85. |
55 |
|
Széchenyi pihenőhely |
parking, WC, and water |
60 |
|
Kőszeg, Lövő / Fertőszentmiklós |
|
68 |
|
under the Győr–Sopron railway line |
|
72 |
|
Main road 84 – Nagycenk / Sárvár |
Connection to Sopron, and the Lake Balaton. |
78 |
|
Hutbájd pihenőhely |
parking, WC, and water
Tengelysúlymérő állomás means weigh in motion (trafic controll) |
79 |
|
over the Győr–Sopron railway line |
|
|
|
Ikva híd |
híd means Bridge |
82 |
|
Main road 84 – Kópháza (border) / Sopron Centrum
Harka |
|
85 |
|
Sopron-Balf / Sopron-Pihenőkereszt |
|
89 |
|
Sopron észak / Fertőrákos |
észak means North |
90 |
|
Soproni alagút |
Length: 780 m
alagút means Tunnel |
93 |
|
Main road 84 – Sopron nyugat / Ágfalva |
nyugat means West
Western under construction section |
94 |
|
Scarbantia pihenőhely |
Planned |
95 |
|
Soporn (H) – Klingenbach (AT) border crossing A 3 – Eisenstadt towards to Vienna |
Planned |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|