Marchwood_Incinerator

Marchwood ERF

Marchwood ERF

Waste-to-energy power station near Southampton, UK


Marchwood ERF (or Marchwood Energy Recovery Facility) is a waste incineration plant in Marchwood, near Southampton, England. It is situated beside the estuary of the River Test where it meets Southampton Water, opposite the Port of Southampton. It burns municipal waste and produces electricity for the National Grid.

Quick Facts Official name, Country ...

History

The first incinerator at Marchwood was a small plant which took refuse from Southampton and the New Forest, and was commissioned in 1975.[1] This plant was closed in 1996.[2] Demolition of the plant, which took place in 2010, was temporarily suspended when a pair of kestrels nested at the site.[3]

The new plant, commissioned in 2007, was built close to the site of the old incinerator.[2] The plant is surrounded by a metal dome superstructure which was designed by the architect Jean-Robert Mazaud.[4] The dome was built by the Texas company Geometrica.[5] It was built using galvanized steel tubing joined with high-strength aluminium hubs,[5] which was then clad in aluminium.[6]

See also


References

  1. Surveyor, (1975), Volume 145, page 35
  2. Rootes, Christopher (2010). "More acted upon than acting? Campaigns against waste incinerators in England". In Rootes, Christopher; Leonard, Liam (eds.). Environmental Movements and Waste Infrastructure. Routledge. p. 75. ISBN 0415458692.
  3. Hatherley, Owen (2011). A Guide to the New Ruins of Great Britain. Verso. p. 46. ISBN 1844677001.
  4. "A Jewel off Southampton Water". Geometrica. Retrieved 20 January 2015.
  5. "Marchwood". Veolia UK. Retrieved 20 January 2015.

Share this article:

This article uses material from the Wikipedia article Marchwood_Incinerator, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.