Nanchang_Metro

Nanchang Metro

Nanchang Metro

Metro system in Nanchang, China


Nanchang Metro, officially Nanchang Rail Transit, is a rapid transit system in Nanchang, Jiangxi, China. As of 2021, four lines are operational. The Metro opened for commercial operation in December 2015.[3] The network is currently 128.3 km (79.7 mi) in length with 4 lines. A total length of 163 km (101.3 mi) of network is planned, with Line 5 which is currently under planning.[4]

Quick Facts Overview, Locale ...
Quick Facts Simplified Chinese, Traditional Chinese ...

Network

Network map

More information Line, Terminals (District) ...

Under Construction

Extensions of Lines 1 & 2

On 24 November 2020, the National Development and Reform Commission approved the extensions of Lines 1 & 2.[6] Line 1 north and Line 2 east extension both started construction on September 2021.[7][8]

More information Years, Line ...

History

Origins

The construction of a rail transit system in Nanchang was first proposed in the beginning of the 2000s.[10] The population of the urban core of Nanchang is projected to reach 3.5 million people by 2020.[11] In August 2005, Jiangxi Provincial Development & Reform Commission and Nanchang City Government replied to the proposal of building a metro system, and the City Government considered listing the proposal in the Eleventh Five-year plan.[12] In November, a plan of 4 metro and 1 light rail was drafted.[13][14] In 2006, the City officially started the research of building a rail transit system.[15] In the second half of 2007, the prophase research of the construction of the system was initiated.[10] On 30 July 2008, the construction of Nanchang Metro was formally included in the priority agenda.[16]

Planning

Initial Plan

Planned network of Nanchang Metro

In 2008, Nanchang was approved to build a rail transit system by the State Council,[17] and Nanchang Rail Transit Group Co., Ltd. was incorporated on 16 October 2008 to construct and operate Nanchang Metro.[18] On 15 September, the planned 5 routes were notified to the public,[4][19][20][21] which was approved by the State Council in July 2009.[22][23] On 29 July 2009, the construction of Nanchang City Rapid Rail Transit officially began,[24][25] and also on the same day the detailed route and construction plan of the five lines was proclaimed at the press conference.[26] In July 2010, the National Development and Reform Commission approved the feasibility study report of the first phase of Nanchang Metro Line 1.[27]

The Xinhua Bookstore by Bayi Square was demolished to make space for Nanchang Metro Line 1

Construction of Line 1 has started on 29 July 2009,[24] and the line opened on December 26, 2015.[28][29]

In April 2013, the Government planned to acquire approval for all 5 lines by 2014, start constructing all planned lines from 2015, and plan Line 6 to Line 10 to complement the existing network.[30][31]

As of August 2013, the construction of Line 2 also started with the first section opening on August 18, 2017.[32] The construction was planned for Line 3 to start in September 2014, and Line 4 will be constructed as soon as September 2015.[33][34]

Phase 2

On 31 May 2013, Nanchang Government submitted three candidate plans for the Phase 2 construction (2014-2020) to the expert panel,[35][36] which chose the compromising Plan 2.[33][37] According to the plan, Line 2 will be extended to both directions from 2014, Line 1 from 2016;

Line 1 north and Line 2 east extension both started construction on September 2021.[7][8] The project will extend Line 1 north from Shuanggang Station to Changbei Airport. The extension is 16.62 km (10.33 mi) in length, including 11.86 km (7.37 mi) underground and 3.23 km (2.01 mi) elevated.[6] Line 2 will be extended from Xinjia'an Station to Nanchang East railway station, the extension is 10.52 km (6.54 mi) in length and fully underground.[6]

Rolling Stock

Nanchang Metro uses Type B rolling stock, whose cars are 2.8 m (9 ft 2 in) in width, 3.8 m (12 ft 6 in) in height and 19 m (62 ft 4 in) in length, providing the system with maximum capacity of 30,000 to 55,000 passenger per hour per direction.[38]

Ticketing

Single ticket will be available as plastic packaged RFID coin like many other cities in China.[39] Existing pre-payment smart cards such as local Hongcheng Tong (Chinese: 洪城通) are also expected to be used in Nanchang Metro.

Notes


    References

    1. "运送乘客237.1亿人次,新增运营里程1168公里…2021年城市轨道交通运营成绩单". 2022-01-13. Retrieved 19 July 2022.
    2. "南昌地铁远景规划征询民意 将有5条地铁线路". Archived from the original on 2016-03-03. Retrieved 2013-01-02.
    3. "南昌地铁5、6、8、9号线传来最新消息!". m.thepaper.cn. Retrieved 2024-01-23.
    4. 南昌4条地铁布局初定. Information Daily. 2005-11-08.
    5. "南昌地铁远景规划征询民意(图)". Archived from the original on 2017-08-31. Retrieved 2013-08-11.
    6. "国务院同意南昌建设地铁 1号线有望年内动工". Archived from the original on 2017-08-31. Retrieved 2013-08-11.
    7. "南昌地铁线路站点公布 1号线2014年通车". Archived from the original on 2014-02-19. Retrieved 2013-01-02.
    8. "南昌地铁2号线(首通段)开通试运营 南昌迎来地铁换乘时代-新华网". news.xinhuanet.com. Archived from the original on August 21, 2017. Retrieved 2017-08-20.
    9. "南昌未来7年有望建成3至4条地铁". Archived from the original on 2013-09-09. Retrieved 2013-08-11.
    10. 信息日报. "南昌第二轮地铁建设规划94.1公里". 大江网. Retrieved 2013-08-10.
    11. 南昌地铁单程票采用筹码式车票. Information Daily. 2012-12-25.

    Share this article:

    This article uses material from the Wikipedia article Nanchang_Metro, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.