Network_Rail_Route_5_(West_Anglia)

Network Rail Route 5 (West Anglia)

Network Rail Route 5 (West Anglia)

Add article description


Strategic Route 5 - West Anglia was the designation given by Network Rail, from 2004 to 2009, to a grouping of railway lines in the East of England that encompassed the West Anglia Main Line and its various branch lines. The route provided key services to Cambridge and Stansted Airport as well as supporting suburban services in North London and rural services in Cambridgeshire, Norfolk and Suffolk.[1]

In 2010, Network Rail restructured its route categorisation. Routes 5 and 7 were merged into Strategic Route D: East Anglia.[2]


Strategic route sections

The Route was divided into a number of separate Strategic Route Sections (SRS's) that were defined based on route use, infrastructure and historical lines.

More information Route, Strategic Route Sections (SRS) ...

Railway planning

As part of Network Rail's Strategic Business Plan a Route Plan for each route, including Route 5, was published annually. The Route 5 plans for 2008[3] and 2009[1] are made available online.

Together with Route 7 - Great Eastern and Route 6 - North London Line and Thameside, the route was included in the Greater Anglia Route Utilisation Strategy.[1]

Proposed developments

The Greater Anglia RUS includes a number of proposals for the future development of the route. In the medium term, 2009–14, this includes minor infrastructure works and additional rolling stock to allow main line peak-service trains to be extended to 12-car formation. A number of developments are also intended for the West Coast Main Line depending on the status of future development at Stansted Airport.[4] Enhancements to the power supply of the route are intended for completion by 2012 to interface with those carried out on Route 6 and Route 7.[5]


References

  1. "Route 5 - West Anglia" (PDF). Network Rail. 2009. Archived from the original (PDF) on 7 June 2011. Retrieved 26 May 2009.
  2. "Route Plans archive". Network Rail. Retrieved 21 March 2015.
  3. "Route 7 - Great Eastern 2008" (PDF). Network Rail. 2008. Retrieved 27 May 2009.
  4. "Greater Anglia Route Utilisation Strategy" (PDF). Network Rail. Archived from the original (PDF) on 7 June 2011. Retrieved 8 May 2009.
  5. "Enhancements programme: statement of scope, outputs and milestones" (PDF). Network Rail. 31 March 2009. Archived from the original (PDF) on 2 September 2009. Retrieved 1 July 2009.

Share this article:

This article uses material from the Wikipedia article Network_Rail_Route_5_(West_Anglia), and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.