North_Side_main_line

North Side main line

North Side main line

Add article description


The North Side Main Line is a branch of the Chicago "L" system that is used by Red, Purple, and Brown Line trains. As of 2012, it is the network's busiest rail branch, serving an average of 123,229 passengers each weekday.[1] The branch is 10.3 miles (16.6 km)[2] long with a total of 21 stations, from Howard Street in Rogers Park down to Lake Street in Chicago's Loop. The branch serves the north side of the city 24 hours a day, seven days a week.

Quick Facts Overview, Status ...

Since 2005, this branch has been renovated several times and is currently being reconstructed. On January 7, 2011, CTA requested a rehabilitation program for the North Side Main Line.[3] This project is part of the Red Ahead program.[4]

Route

The North Side Main Line connects to five other branches of the Chicago 'L', including the Ravenswood branch which is served by the Brown Line, the State Street subway which is served by the Red Line, the Skokie Branch which is served by the Yellow Line, the Evanston Branch which is served by the Purple Line, and The Loop which is served by Brown and Purple Line trains. North of Howard, the Purple Line continues to Evanston and Wilmette, and the Yellow Line runs through southern Evanston en route to its terminus in Skokie.

The North Side Main Line serves the Near North Side, Old Town, Lincoln Park, Lakeview, Wrigleyville, Uptown, Edgewater and Rogers Park neighborhoods of Chicago, and has stops near Wrigley Field and Loyola University.

Connection

Yellow and Purple Line trains merge onto the line at its northern terminus, the Howard Street Station. Red Line trains and the weekday rush hour Purple Line Express trains continue south on the part of the line that is known as the Howard Branch. The Ravenswood branch connects to the Main Line north of the Belmont station, where Brown Line trains merge onto the Main Line.

The part of the line south of this junction is known as the Loop Branch or the Ravenswood Connector. On the portion of this branch shared by Red and Brown Line trains, Red Line trains operate express on the inside tracks, while Brown and Purple Line Express trains run local on the outer two tracks. The Red Line passes through Wellington and Diversey stations (which is served mainly by Brown Line trains) and all trains make another stop at Fullerton.

After Fullerton, the Red Line descends into a portal after Armitage, and enters the State Street subway, while Brown and Purple Line express trains continue elevated for the remainder of the Main Line to Merchandise Mart, where they cross the Wells Street Bridge and enter the Loop at Tower 18.

History

The line began operation on May 31, 1900, between The Loop and Wilson Avenue as the Northwestern Elevated Railroad. On May 16, 1908, service on the line was extended to Central street in Evanston.[2] From 1919 to 1963, the line was also utilized by interurban trains of the Chicago North Shore and Milwaukee Railroad.[5][6]

Since 2002, the main line has gone through plenty of renovations and rehabilitation projects and those projects are still going on as of today. Station renovations and track replacements have been happening ever since early 2012 and the CTA has been recently renovating all the Howard branch stations as part of the Red North Station Interim Improvements (see below).

Red North Station Interim Improvements

In November 2011, the CTA announced the Red North project as part of the Red Line Capital Investment.[7] The cost of the project was $86 million with a $57.4 million contract granted to contractor Kiewit Infrastructure. The project included seven stations to be renovated which included Granville, Morse, Thorndale, Argyle, Berwyn, Lawrence, and Jarvis. The project started on June 1, 2012 at Granville and finished its renovation on December 13, 2012 at Jarvis. The project also caused the elimination of slow zones in which trains accelerate faster than usual.

Red & Purple Modernization Project

As part of the program, the CTA also dubbed the "Red & Purple Modernization Project."[8] CTA recently studied four possible alternatives for the project and they are willing to provide community updates that can make improvements of those studies in late 2012 to 2013. CTA was proposing to close down five stations on the Red and Purple lines. The five potential stations include Foster, South Boulevard, Jarvis, Lawrence, and Thorndale.[9]

In 2011, CTA planned a scoping process and which they provided public meetings and a comment period. The purpose of the scoping process was to ask operators and attentive parties to provide guidance on the proposed alternatives, the purpose and need for the project and the proposed topics of evaluation and potential effects and mitigation measures to be considered. During the scoping process CTA introduced six alternatives as part of the project.

This project will completely rebuild the Lawrence, Argyle, Berwyn, and Bryn Mawr stations and the construction of a new Red-Purple bypass, construction on the project began on October 2, 2019 and will be completed in 2025.[10][11]

Wilson Station Reconstruction Project

From 2014 to 2018, The Chicago Department of Transportation rebuilt the Wilson station, which serves as a major transfer point between Red and Purple Line Express trains.[12] The rebuilt station has a new main station entrance on the south side of Wilson, with two island platforms to provide access between the two lines, two auxiliary entrances: one at Sunnyside Avenue and one on the north side of Wilson.[13]

Reconstruction began in October 2014 and ended in February 2018. The station remained open during reconstruction. The complete set of renderings and boards on display during the open house meeting are now available.[14]

Station listing

More information Station, Location ...

See also


References

  1. "2012 Annual Ridership Report" (PDF). Chicago Transit Authority. transitchicago.com. Archived from the original (PDF) on December 6, 2013. Retrieved January 2, 2014.
  2. Garfield, Graham. "North Side Main Line". Chicago-L.org. Chicago 'L'. Retrieved July 19, 2012.
  3. "CTA wants input on North Side Mainline Rehab". Prairie State Blue. Retrieved July 19, 2012.
  4. "CTA Red Ahead". Chicago Transit Authority. Retrieved August 24, 2012.
  5. Interurban to Milwaukee: Bulletin No. 106. Chicago, Illinois: Central Electric Railfans' Association. 1962. ISBN 9780915348060.
  6. Route of the Electroliners: Bulletin No. 107. Chicago, Illinois: Central Electric Railfans' Association. 1963. ISBN 0-915348-07-1.
  7. "CTA Red Ahead - Red North project". Chicago Transit Authority. Retrieved August 24, 2012.
  8. "Red & Purple Modernization". Chicago Transit Authority. transitchicago.com. Retrieved December 8, 2012.
  9. "Environmental Impact Statement Scoping Information" (PDF). North Red and Purple Modernization Project. Chicago Transit Authority. Archived from the original (PDF) on November 29, 2016. Retrieved January 28, 2011.
  10. "Red Ahead - Wilson Station Reconstruction". Chicago Transit Authority. Retrieved October 6, 2012.
  11. "Wilson Reconstruction Project Display Boards". Chicago Transit Authority. transitchicago.com. Retrieved October 13, 2012.
  12. "Wilson Reconstruction Project Display Boards". Chicago Transit Authority. transitchicago.com. Retrieved October 13, 2012.

Share this article:

This article uses material from the Wikipedia article North_Side_main_line, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.